• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Shakespeare tunnel, Folkestone

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

user15681

Established Member
Joined
3 Jun 2012
Messages
1,354
Indeed, the single bore Shakespeare Tunnels did pose an obstacle to the Highspeed service through to Dover. For through running to Dover, either the trains had to have end corridors (a non-starter for high speed trains) or the tunnels had to be modified. To fix this, significant work was undertaken 5 years ago this very month on Shakespeare Tunnel (the opportunity was taken to do works at two other tunnels nearby too). There are a number of passageways between the two bores which Network Rail improved and turned into 'evacuation points'. Basically, walkways were installed in these passageways and so in the event of an emergency, passengers can evacuate through the side doors, head to a nearby evacuation point and leave the tunnel through a 'rescue train' in the other bore.
 
Last edited:

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,583
Location
Nottingham
Presumably the bore is too narrow to squeeze past the train to reach the end. If so, how is it possible to squeeze past the train to reach an evacuation point, or are these big enough to cover the largest gap between doors?
 

jnjkerbin

Member
Joined
25 Apr 2012
Messages
842
Location
Down south
Presumably the bore is too narrow to squeeze past the train to reach the end. If so, how is it possible to squeeze past the train to reach an evacuation point, or are these big enough to cover the largest gap between doors?

I believe that markers were installed so the driver would stop at one of these and the doors would line up.
 

user15681

Established Member
Joined
3 Jun 2012
Messages
1,354
Presumably the bore is too narrow to squeeze past the train to reach the end. If so, how is it possible to squeeze past the train to reach an evacuation point, or are these big enough to cover the largest gap between doors?

I believe that markers were installed so the driver would stop at one of these and the doors would line up.

Sorry, I should have added, during the works the tracks were slewed ever so slightly to widen the gap on one side (the side with the evacuation points on it) to make evacuation possible. There are markers on the walls that show drivers where they need to stop in order to line up doors with the evacuation points as jnjkerbin says, but should the driver not be able to stop in line, the gap has been widened slightly with the slewing as a lest resort.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,546
Location
Torbay
There were some other alternative ways of running Javelins to Dover looked at during the early noughties. One option was running from Ashford via a new connection between the two lines at Canterbury. This dusted off an earlier design, put together as a contingency if the cliffs showed signs of collapsing near Folkestone, blocking the line permanently.
 

LewFinnis

Member
Joined
22 Aug 2013
Messages
107
As a Dovorian, I must point out that Shakespeare Tunnel is at Dover, not that other place.<D
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,228
Does the fact that the 395s have sliding doors rather than plug doors help, and thus don't need extra space outside to open?
 

Islineclear3_1

Established Member
Joined
24 Apr 2014
Messages
6,577
Location
PTSO or platform depending on the weather
Status
Not open for further replies.

Top