Capacity on the Northern WCML is currently eaten up by having high(ish) speed passenger trains and freight trains sharing the same tracks. Capacity is maximized by flighting passenger trains but still ultimately results in inefficient use of the route.

So why not re-route all freight trains via S&C? The junction by Lostock Hall Station would seem to be the sensible point of divergence, with freight trains routing from there through Blackburn and joining the S&C at Hellifield. Some infrastructure intervention would be needed, probably a grade-separated junction at the WCML junction, requiring about the same scale of works as at Werrington on the ECML. Do we know if this option is being actively considered?
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,202
Location
"Marston Vale mafia"
Do we need more passenger capacity on the north WCML? Only one I can think of us potentially wanting is Windermere-Manchester Airport hourly (with Barrow terminating at Lancaster) if wired.
 

DB

Guest
Joined
18 Nov 2009
Messages
5,036
Capacity on the Northern WCML is currently eaten up by having high(ish) speed passenger trains and freight trains sharing the same tracks. Capacity is maximized by flighting passenger trains but still ultimately results in inefficient use of the route.

So why not re-route all freight trains via S&C? Lostock junction would seem to be the sensible point of divergence, with freight trains routing from there through Blackburn and joining the S&C at Hellifield. Some infrastructure intervention would be needed, probably a grade-separated junction at Lostock, requiring about the same scale of works as at Werrington on the ECML. Do we know if this option is being actively considered?

That would rule out electrically-hauled freight - if the aim is to reduce diesel use, this would likely have the opposite effect.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,202
Location
"Marston Vale mafia"
That would rule out electrically-hauled freight - if the aim is to reduce diesel use, this would likely have the opposite effect.

As a useful diversionary route the S&C really could do with being wired, but I suspect it would be a very expensive job with all the tunnels and bad weather.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,296
Some useful pointers as to why it doesn't work here.

The Settle & Carlisle route is already used for freight.
 

DB

Guest
Joined
18 Nov 2009
Messages
5,036
As a useful diversionary route the S&C really could do with being wired, but I suspect it would be a very expensive job with all the tunnels and bad weather.

Massively so, and highly controversial as well (wires across Ribblehead Viaduct). Can't see it ever being viable.

Doesn't seem to be used that much as a diversionary route any more anyway - Virgin gave up on using it years ago, even with Voyagers.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,296
How fast do freight trains go from Preston to Carlisle?
Here is an example of a freight train path that goes via Settle between Carlisle and Wigan.

Here is an example of a freight train path that goes via Oxenholme between Carlisle and Wigan

The former takes 4.5 hours to get from Carlisle to Wigan. The latter takes 2.5 hours. Obviously, they are different types of train with different speeds but it shows why the direct route is used.
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,628
Location
Hope Valley
A large proportion of freight trains on the WCML are intermodal and the S&C is not gauge-cleared.

Services to intermediate terminals - most obviously Harrison's Sidings and Hardendale - would also still need to use the WCML.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,628
Location
Nottingham
Here is an example of a freight train path that goes via Settle between Carlisle and Wigan.

Here is an example of a freight train path that goes via Oxenholme between Carlisle and Wigan

The former takes 4.5 hours to get from Carlisle to Wigan. The latter takes 2.5 hours. Obviously, they are different types of train with different speeds but it shows why the direct route is used.
You're flattering the WCML somewhat here as the freight quoted is southbound, 75mph and electric, and only gets looped once. The answer might be rather different for a northbound 60mph diesel timing, which probably takes about 25min each to get up Shap and Beattock and correspondingly will have to be looped much more.

If the sidings at the Leyland factory aren't used any more (weren't they a temporary depot for Northern during work at Blackpool) then maybe a flyover could be built between there and Farington Curve to avoid any freight heading towards Blackburn having to cross the on the flat. Unfortunately someone's built a road bridge that prevents grade separation at junction itself, and trying to get a curve up to where the Preston-Blackburn line crosses the WCML would demolish most of Farington village.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,202
Location
"Marston Vale mafia"
Massively so, and highly controversial as well (wires across Ribblehead Viaduct). Can't see it ever being viable.

Doesn't seem to be used that much as a diversionary route any more anyway - Virgin gave up on using it years ago, even with Voyagers.

Because it was easier to put on RRBs. However, with the PSVAR regulations soon to apply (the exemption is unlikely to go on forever) they may be pushed back the other way again.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,296
Because it was easier to put on RRBs. However, with the PSVAR regulations soon to apply (the exemption is unlikely to go on forever) they may be pushed back the other way again.
That is unlikely isn't it. They are still going to have to serve the intermediate stations, it is quicker by bus and they won't have suitable rolling stock for the diversions.

I think it is highly unlikely that you predicate sending freight trains that way on the value of the route as a diversionary measure for WCML passenger services just because there arent enough suitable rail replacement buses.
 

DB

Guest
Joined
18 Nov 2009
Messages
5,036
Would need fewer buses.

Er, they'll have a load of bi-mode 80x.

Aren't those intended for the southern part of the route? If so it would mean a major rearrangement of diagrams every time there was a diversion - probably not gong to be practical.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,202
Location
"Marston Vale mafia"
Aren't those intended for the southern part of the route? If so it would mean a major rearrangement of diagrams every time there was a diversion

Yes, it would - just like they actually did do when they did it using Voyagers! This sort of diagram set is one you plan in advance, a bit like the 2-track timetable.

They were freed up by cancelling the Euston-Crewe section of the North Wales service and adding stops to other services to compensate.
 

DB

Guest
Joined
18 Nov 2009
Messages
5,036
Yes, it would - just like they actually did do when they did it using Voyagers! This sort of diagram set is one you plan in advance, a bit like the 2-track timetable.

They were freed up by cancelling Euston-Crewe of the North Wales service and adding stops to other services to compensate.

Voyagers work the northern end though, so the drivers and guards will all have been familiar with them. And they did drag Pendolinos over the line quite a bit, back when they had more thunderbirds and they were operated directly by Virgin rather than leased in.
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
Because it was easier to put on RRBs. However, with the PSVAR regulations soon to apply (the exemption is unlikely to go on forever) they may be pushed back the other way again.

Well also you lose the ability to serve the intermediate stations if you divert via the S&C. So you still need an RRB.

Add in a 60mph linespeed on the S&C and it's unlikely the diverted train will be quicker than a non stop RRB between Carlisle & Preston.

And where RRBs are concerned it's unlikely PSVAR will apply because the coach is in effect a private hire - it's not being provided as a 'registered' bus service. As long as the rail company is able to provide accessible transport - which could mean providing a taxi where somebody is unable to access a coach - then there is no issue.
 
Last edited:

DB

Guest
Joined
18 Nov 2009
Messages
5,036
Well also you lose the ability to serve the intermediate stations if you divert via the S&C. So you still need an RRB.

Add in a 60mph linespeed on the S&C and it's unlikely the diverted train will be quicker than a non stop RRB between Carlisle & Preston.

But many people would prefer to stay on a train, even if it takes longer, than have the hassle of buses. Yes, the intermediate stations still need to be dealt with but that's a minority of the overall passengers.

However, I very much doubt if we'll see diversions being reintroduced.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,202
Location
"Marston Vale mafia"
Well also you lose the ability to serve the intermediate stations if you divert via the S&C. So you still need an RRB.

Add in a 60mph linespeed on the S&C and it's unlikely the diverted train will be quicker than a non stop RRB between Carlisle & Preston.

For intermediate stations only between Preston and Carlisle you can probably manage with one coach per Pendolino, they aren't that busy.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,492
Location
Preston Lancs
So why not re-route all freight trains via S&C? Lostock junction would seem to be the sensible point of divergence, with freight trains routing from there through Blackburn and joining the S&C at Hellifield.

Did you mean Farrington Junction to Lostock Hall to Blackburn to Clitheroe and then S&C? I thought Lostock Junction was on the Preston -Manchester line near Bolton.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,941
Location
Airedale
You're flattering the WCML somewhat here as the freight quoted is southbound, 75mph and electric, and only gets looped once. The answer might be rather different for a northbound 60mph diesel timing, which probably takes about 25min each to get up Shap and Beattock and correspondingly will have to be looped much more.

Fsir comment, but the northbound (empty) Chirk Logsdoes the run non stop in just over 2 hours. Even with one long stop to let all 3 passengers past, it wouldn't be as much as 3 hours to Carlisle (Beattock is irrelevant here).
 

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,869
Did you mean Farrington Junction to Lostock Hall to Blackburn to Clitheroe and then S&C? I thought Lostock Junction was on the Preston -Manchester line near Bolton.
Probably? If that's the chord just south of Lostock Hall Station.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
But many people would prefer to stay on a train, even if it takes longer, than have the hassle of buses.

Only to a point. There's a point where, of the rail journey time gets so extended, the intended journey becomes unviable (or the journey planner just finds another route)
 

37424

Member
Joined
10 Apr 2020
Messages
1,064
Location
Leeds
Would need fewer buses.



Er, they'll have a load of bi-mode 80x.
Not really 13 Bi-modes as opposed 20 Voyagers. Virgin seemed to give up on S&C diversions around the time the Birmingham-Scotland services were joined to the Birmingham- Euston services, and presumably considerable re-diagramming required for a diversion had some bearing on it, where as previously the majority of Birmingham-Scotland Services would be Voyagers.

Obviously the North West Electrification has opened up more electrified diversionary routes and reduced the need for diesel to a point, but obviously doesn't help north of Preston
 
Last edited:

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,219
Location
Bolton
Yes, it would - just like they actually did do when they did it using Voyagers! This sort of diagram set is one you plan in advance, a bit like the 2-track timetable.

They were freed up by cancelling the Euston-Crewe section of the North Wales service and adding stops to other services to compensate.
Even if they were going to be working to Scotland, there are only going to be 13 of them. That would probably mean a maximum of one unit available for North Wales and Chester to Crewe services, or one service every four hours between Crewe and Holyhead.

The last time this happened, when the Edinburgh services ran via the Suburban line, the Chester and North Wales services were all destregthened to five car, which was very problematic.
 

158756

Established Member
Joined
12 Aug 2014
Messages
1,628
Some useful pointers as to why it doesn't work here.

Add to those points that most freight on the WCML in Cumbria these days seems to run at night when passenger capacity isn't an issue. There are some daytime paths though, and they will be problematic if e.g HS2 demands more paths.

The Settle & Carlisle route is already used for freight.

Barely. How much commercial freight uses the full length now? A few trains a week to the cement works at Clitheroe and some timber (apparently suspended since the pandemic hit)? The coal traffic is never coming back. Combine that with the sparse passenger service and one has to wonder how much of a future the line has.
 