. . .Does anyone know what, or when these two lines are likely to be resignalled?

. . .I'm aware that piecemeal replacement of semaphores for colour–lights has gone on from time to time together with replacement colour–light I.B.S. allowing some of the more remote boxes to go, but from the end of the Carlisle PSB control area at Howe and Co.'s siding the S & C is still A.B.!

. . Carnforth – Settle Junction has been a very long "block section" since Wennington S.B. was abolished - is it cheaper to run the line that way rather than signal it?

. . .A book I once read in Morecambe Library said that a replacement signalling strategy for the S & C could be "widely–spaced three aspects" supervised from Carlisle or Leeds, or even "two–aspect continuous TCB" but that seems to have died a death now!

Chris Williams
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Backroom_boy

Member
Joined
28 Dec 2019
Messages
583
Location
London
. . .A book I once read in Morecambe Library said that a replacement signalling strategy for the S & C could be "widely–spaced three aspects" supervised from Carlisle or Leeds, or even "two–aspect continuous TCB" but that seems to have died a death now!

Chris Williams
Leeds has all gone to York ROC hasn't it?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,662
. . .Does anyone know what, or when these two lines are likely to be resignalled?

. . .I'm aware that piecemeal replacement of semaphores for colour–lights has gone on from time to time together with replacement colour–light I.B.S. allowing some of the more remote boxes to go, but from the end of the Carlisle PSB control area at Howe and Co.'s siding the S & C is still A.B.!

. . Carnforth – Settle Junction has been a very long "block section" since Wennington S.B. was abolished - is it cheaper to run the line that way rather than signal it?

. . .A book I once read in Morecambe Library said that a replacement signalling strategy for the S & C could be "widely–spaced three aspects" supervised from Carlisle or Leeds, or even "two–aspect continuous TCB" but that seems to have died a death now!

Chris Williams
Not in the short or medium term I expect. There are other schemes infront of it.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
I assume the Settle-Carnforth has no marginal operational cost nor staffing issues that could be saved by doing anything to its signalling, as it has none of its own signal boxes. Also no level crossings to need updating. And an IBS would be nice but nowhere a priority.
What could drive a S&C resignalling, isn’t it a bit over spec now the coal traffic has gone? What what would be the gains in resignalling - are the boxes hard to staff (or a desirable gig)?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,662
What could drive a S&C resignalling, isn’t it a bit over spec now the coal traffic has gone? What what would be the gains in resignalling - are the boxes hard to staff (or a desirable gig)?
Operational cost would reduce, and it would be easier to timetable/release capacity if you made block sections shorter or more regular.
 