truckman060473
Member
Ok I was wondering about the common sight in days gone by where a shunter would attach a loco to the coaches after running round etc. Today at my local preserved line (Gwili Railway) the 03 or 04 shunting locomotive was in use with a pair of coaches. The loco approached the coaches until it gently struck the buffers of the coaches and stopped. The loco then revved up and pushed into the coaches until the buffers compressed. The man then went under to couple up. The pipes were attached and the coupling assembly was slung over the hook. Then the handle was spun round and the opposing thread studding drew together taking up the slack. My question is, how do they know how far to turn the handle? I was thinking that if it was made too short then on a sharp curve it could force the buffers in past their "end stops" and possibly cause a derailment and or snap the coupling?