Services via Barnes Bridge suspended

Status
Not open for further replies.

Edsmith

Member
Joined
21 Dec 2021
Messages
668
Location
Staplehurst
Services are reportedly suspended until Monday November 28th due to repairs on a bridge between Barnes Bridge and Hounslow.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

SWT_USER

Member
Joined
29 Aug 2010
Messages
1,176
Location
Ashford Middx
That is incredibly annoying <(. No services from Staines / Feltham to Kew Bridge either, just an hourly Waterloo to Kew Bridge via Hounslow.

Anyone know what the actual problem is with the bridge and how it was discovered?
 

SynthD

Established Member
Joined
4 Apr 2020
Messages
2,034
Location
UK
ℹ Engineers carrying out planned inspections have found a small number of defects underneath Barnes Bridge which they need to repair before the bridge can reopen for passenger services.

This is from Network Rail Wessex on Twitter.
 

66701GBRF

Member
Joined
3 Jun 2017
Messages
913
Defects found on the 18th. Speed restriction and block to some traffic applied. However defects have deteriorated so now blocked to all traffic.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,007
Location
Surrey
Questions need to be asked about the asset management of this structure such that it gets to a situation where its allowed to deteriorate such that it has to be closed. Yes its an old structure but so are thousands more and NR as did BR before had a good reputation of getting repairs done before this sort of situation arises. The line was only shut recently for several days as part of Feltham resignalling so did they not take advantage of that closure to undertake repairs?
 

SynthD

Established Member
Joined
4 Apr 2020
Messages
2,034
Location
UK
They regularly inspect the assets, but this was discovered after the Feltham work. They didn’t see the need to close it based on what they saw at first, only what was found today.

Edit: I don’t know. I’m piecing it together.
 
Last edited:

MattyH

Member
Joined
30 Aug 2016
Messages
22
I guess the hourly service is a fair effort under the circumstances but annoying all the same.
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,855
Location
UK
Why can't they use Old Kew Junction to reverse trains? Is it felt that a service from Kew Bridge to Waterloo via Hounslow & Twickenham would just not be worth it?
 

MattyH

Member
Joined
30 Aug 2016
Messages
22
That's exactly what they seem to be doing tonight, though whether this will happen for the rest of the week isn't clear, the journey planner hasn't been updated as yet.
 

Siemens Staines

Established Member
Joined
30 Jul 2015
Messages
1,513
On journeycheck

Until further notice the following alterations will be necessary:
- London Waterloo to London Waterloo services via Hounslow and Twickenham will be cancelled.
- London Waterloo to London Waterloo services via Twickenham and Hounslow will terminate at Hounslow.
- Additional services will run from Hounslow to London Waterloo at XX:10 and XX:40, calling at Twickenham only.
- London Waterloo to Weybridge XX:22 services will be diverted via Twickenham, calling additionally at Twickenham.
- London Waterloo to Weybridge XX:52 services will run as scheduled to Barnes and will then call at all stations between Twickenham and Kew Bridge, where they will terminate.
- Weybridge to London Waterloo XX:03 services will be diverted via Twickenham.
- Weybridge to London Waterloo XX:33 services will be started from Kew Bridge.
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,855
Location
UK
That's exactly what they seem to be doing tonight, though whether this will happen for the rest of the week isn't clear, the journey planner hasn't been updated as yet.

Ah thanks, I misread. At least people can walk to Gunnersbury for onward travel!
 

Craig1122

Member
Joined
14 May 2021
Messages
373
Location
UK
Questions need to be asked about the asset management of this structure such that it gets to a situation where its allowed to deteriorate such that it has to be closed. Yes its an old structure but so are thousands more and NR as did BR before had a good reputation of getting repairs done before this sort of situation arises. The line was only shut recently for several days as part of Feltham resignalling so did they not take advantage of that closure to undertake repairs?
A few years ago now a bridge failed between Feltham and Whitton and caused major disruption. Cause was a blockage in the river which had allegedly been reported to NR but not acted on. So unfortunately not a new problem.

Unfortunately a lot of structures can be seen even with the naked eye to be in a poor state. For example look at the number of brick structures with crumbling mortar, often aided on its way by plants such as buddleia growing unchecked. Defects like this start as something minor then water gets in and makes it worse.

I suspect the bill to bring the entire NR estate up to standard would be absolutely eye watering.
 

E27007

Member
Joined
25 May 2018
Messages
1,040
Barnes Bridge.
i have traveled over the Bridge many times , but was not aware of the older disused Bridge by Joseph Locke, the new Bridge being alongside the old.

Barnes Bridge
 
Last edited:

davews

Member
Joined
24 Apr 2021
Messages
1,010
Location
Bracknell
I wondered that as well, used it a couple of weeks ago. They are also building a new footbridge underneath the railway bridge at the north side, part of the Thames Path, which looked close to completion. Together with a scheme to make the earlier parallel second bridge into a new pedestrian one. A lot happening at Barnes.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,137
Location
West Wiltshire
Barnes Bridge.
i have traveled over the Bridge many times , but was not aware of the older disused Bridge by Joseph Locke, the new Bridge being alongside the old.

Barnes Bridge

If you look very closely from aerial view, there is a very slight wiggle in the track over the newer double track bridge. Even the platforms have a wiggle to align with newer bridge. The older one carried a footpath for decades

The brick arch, over the road by the station is clearly 2 separate structures, about 60% on down river side and another butting up to it about 40% of the bridge
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,254
If you look very closely from aerial view, there is a very slight wiggle in the track over the newer double track bridge. Even the platforms have a wiggle to align with newer bridge. The older one carried a footpath for decades

The brick arch, over the road by the station is clearly 2 separate structures, about 60% on down river side and another butting up to it about 40% of the bridge
The original bridge was two track with 2 cast iron arches per track with 3 of those 4 cast arches remaining (the eastern most was removed). During the 1890s rebuild a single track was kept operating on the western most spans and one arch of the eastern most span. Some of the original 1840s buttresses still support the current western most track. (The original 1840s buttresses were extended eastwards downstream in 1890s, the original aspect ratio also not being good for scour)

There is already footbridge (public footpath) on the eastern side of the current tracks which is unusually covered by the bridge rebuild act of parliament so not much point in opening a new one on the disused arches...
 

Big Jumby 74

Established Member
Joined
12 Feb 2022
Messages
2,243
Location
UK
Deleted.

== Doublepost prevention - post automatically merged: ==

A few years ago now a bridge failed between Feltham and Whitton and caused major disruption
That was the bridge, or more of a large culvert associated with the river Crane, which runs roughly North to South under Feltham yard as was. In that instant, if my memory is correct, a temporary structure was erected over the river to the South of the running lines, and the lines themselves were then slewed across same, to allow repairs to take place. Not an option at Barnes Bridge.

== Doublepost prevention - post automatically merged: ==

At least Hammersmith Bridge has been re-opened for pedestrians
Good news at long last.
 

Craig1122

Member
Joined
14 May 2021
Messages
373
Location
UK
Deleted.

== Doublepost prevention - post automatically merged: ==


That was the bridge, or more of a large culvert associated with the river Crane, which runs roughly North to South under Feltham yard as was. In that instant, if my memory is correct, a temporary structure was erected over the river to the South of the running lines, and the lines themselves were then slewed across same, to allow repairs to take place. Not an option at Barnes Bridge.

== Doublepost prevention - post automatically merged: ==
That's correct, couldn't fault the response at the time. The inspection regime (or lack of that) that meant it was necessary less so. A case of penny wise pound foolish given how much it must have cost to build the temporary diversion.

For those interested the response by SWR service wise:

Waterloo to Waterloo 'rounders' all cancelled.

2tph Waterloo to Weybridge trains diverted via Twickenham with 1tph continuing to Weybridge and 1tph to Kew Bridge via Hounslow.

This leaves Chiswick & Barnes Bridge with no service and the rest of the loop with 1tph (Vs 2 off peak/4 peak) albeit heading away from London. It also reduces the service at Chertsey & Addlestone to 1tph Vs 2.

Luckily most of the London stations have relatively easy alternatives either on the underground or the SWR route via Richmond.
 

N0G83

Member
Joined
19 Apr 2022
Messages
46
Location
here & there
Why can't they use Old Kew Junction to reverse trains? Is it felt that a service from Kew Bridge to Waterloo via Hounslow & Twickenham would just not be worth it?
There is no 3rd Rail at New or Old Kew Jct, freight usage nominally to & from South Acton.
 

RJ

Established Member
Joined
25 Jun 2005
Messages
8,820
Location
Back office
There is no 3rd Rail at New or Old Kew Jct, freight usage nominally to & from South Acton.

Both junctions are electrified and traversed by SWR service trains, it’s the spurs to South Acton that are not. There is a crossover at Old Kew Junction so it’s a fair question from anyone who’s not a subject matter expert on the signalling arrangements.

Barnes - Barnes Bridge - Chiswick - Kew Bridge is all very awkward to do on local buses - is there a replacement bus service in place to link the stations?
 

Craig1122

Member
Joined
14 May 2021
Messages
373
Location
UK
Barnes - Barnes Bridge - Chiswick - Kew Bridge is all very awkward to do on local buses - is there a replacement bus service in place to link the stations?
No buses, I would guess the number of local trips between as opposed to through those stations is fairly low though.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,808
That was the bridge, or more of a large culvert associated with the river Crane, which runs roughly North to South under Feltham yard as was. In that instant, if my memory is correct, a temporary structure was erected over the river to the South of the running lines, and the lines themselves were then slewed across same, to allow repairs to take place. Not an option at Barnes Bridge.
That's correct, couldn't fault the response at the time.
I thought the diversion following the Feltham bridge collapse used a bridge that was formerly used as part of the tracks associated with Feltham marshalling yard? It was rather handy that it was still there and the track could be diverted over it whilst the bridge was replaced.
 

Craig1122

Member
Joined
14 May 2021
Messages
373
Location
UK
I thought the diversion following the Feltham bridge collapse used a bridge that was formerly used as part of the tracks associated with Feltham marshalling yard? It was rather handy that it was still there and the track could be diverted over it whilst the bridge was replaced.
I thought it was a temporary structure but my memory could well be playing tricks as it's a while ago. Certainly would make sense that a previous structure could still have been in place. Either way it was impressive work getting it constructed so quickly.
 

Big Jumby 74

Established Member
Joined
12 Feb 2022
Messages
2,243
Location
UK
I thought the diversion following the Feltham bridge collapse used a bridge that was formerly used as part of the tracks associated with Feltham marshalling yard? It was rather handy that it was still there and the track could be diverted over it whilst the bridge was replaced.
You may well be right, makes sense. Memory and elapsed time etc on my part :lol:. Should have just called it a 'temporary diversion' !
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,180
That was the bridge, or more of a large culvert associated with the river Crane, which runs roughly North to South under Feltham yard as was. In that instant, if my memory is correct, a temporary structure was erected over the river to the South of the running lines, and the lines themselves were then slewed across same, to allow repairs to take place.
The speed with which the temporary alignment was installed was truly impressive!

I was directly affected on my daily commute and the interim arrangement of changing trains at Weybridge (where the connection was missed 90% of the time) and Virginia Water was a right pain!
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,274
I thought it was a temporary structure but my memory could well be playing tricks as it's a while ago. Certainly would make sense that a previous structure could still have been in place. Either way it was impressive work getting it constructed so quickly.
There are two long pre-existing culverts, more like tunnels, running for over 200m right under the marshalling yard footprint. One is for the River Crane, and there’s a parallel flood relief tunnel as well.

You can see some internal photos and plan drawings in this article about the tunnels here. There’s a bit of metric/imperial exaggerated conversion going on, references to 750 yd, but the text has it 750 ft long.
The extent can just about be made out on the current Google satellite view, if you look for the tight bend in the river course.
 
Last edited:
Status
Not open for further replies.