hexagon789
Veteran Member
The fact this happened to a passenger train is unfortunate of course, it was significantly more likely to occur with a 50mph freight. The crossing has existed as is with a 90mph speed limit for passenger trains for many decades.Even 50mph I would consider highly dubious for an unsignalled crossing.
The road over the crossing is a local road, not a state or federal funded highway. No bus routes are scheduled to use it for instance and it has an AADT category of 5 (the lowest useage category). Its a very low priority.
The line has 58 scheduled trains over that crossing, 56 being freights. The low road user useage is one reason the crossing hasn't been deemed worthy of upgrading as yet.
On a side note:
The number of casualties has now been confirmed as 3 - the vehicle driver and two Amtrak personnel.
