DarloRich
Veteran Member
but the 92 will pull the 16 car section to Edinburgh surely
it is only load 5 or 6 i think these days on the inverness sleeper 1x brake 1x lounge 1x seats 3xslep
but the 92 will pull the 16 car section to Edinburgh surely
While I feel that one of these new class 73s is much more appropriately suited to hauling the lightweight Fort William sleeper over the West Highland line than a class 67, I do wonder what Serco and GBRfs proposal is for the Inverness sleeper over the steeply graded Highland main line. Granted, the Inverness sleeper has shrunk considerably since privatisation, but in the past 25 years before the current class 67 operation the train was routinely worked by 47s or class 37s in pairs. Even with basic rules of thumb about horse power per carriage considered, I still wonder whether a single class 73 might struggle on the challenging grades.
I find this puzzling too - bearing in mind that an HST with a failed power car (and hence only 2250bhp) isn't allowed north of Blair Atholl without assistance.
Yes. The plan is that the 92s will replace everything that the 90s do - Euston to Glasgow and Edinburgh, both lowland and highland - and the 73s will replace everything that the 67s do. That both locomotives are fitted with third rail shoes is irrelevant for the sleeper operation as two 400m sleeper platforms are still included in the two remaining Euston rebuild options.
I suppose a really outlandish idea would be to run the sleeper out of waterloo with the 73 dual heading to cover in case the 92 broke down or the wires were stuffed. at least if would naturally find its way back to it's 3rd rail home.
Yep, still runs as load 5 during the summer.I'd imagine a single loco would handle the Fort William easily, even with load 5 in summer (do they still do that?).
Heard a statement from a First Scotrail Empolyee that Serco may not be getting the contract as they were banned from contract bidding due to irregularities in an MOD contract last year which they were fined for.
Heard a statement from a First Scotrail Empolyee that Serco may not be getting the contract as they were banned from contract bidding due to irregularities in an MOD contract last year which they were fined for.