Nicholas Lewis
Established Member
South Eastern are implementing some alterations to their time table on certain to allow daytime inspections
https://newsroom.southeasternrailway.co.uk/news/daytime-inspections-for-improved-maintenance
Maidstone East – Ashford International (08:25 London Victoria to Ashford International service diverted after Otford run fast to Ashford )
Sheerness - Sittingbourne (2 TPH to 1 TPH 09.25 to 15.25 )
Strood – Paddock Wood (2 TPH to 1 TPH 09.10 to 15.00 )
Tonbridge – Ashford (2 TPH to 1 TPH 09.40 to 15.00 )
Not sure of the logic here as its ruins a turn up and go service on timetables that people know. It requires stock and crew alterations which probably reduces the overall efficiency.
Also the time it takes to setup and take a line blockage (be no point in a T3) still leaves limited working time of probably 40-45mins/hour and thats if they only take one of the lines.
Im surmising this has come about from Red Zone working being banned these days when daytime patrolling, inspections, lubrication and bolt tightening would have been done.
Seems to me its about trying to sell the SE Alliance working as beneficial but how is it really putting the passenger first.
https://newsroom.southeasternrailway.co.uk/news/daytime-inspections-for-improved-maintenance
They are planning reductions in daytime frequencies on the following routes on weekdays on a roughly once a month cycleA small number of timetable changes on four routes across Kent will take place off-peak, within school hours on weekdays, over a six-month period.
This will give railway workers more time in-between trains to carry out a greater number of maintenance inspections in daylight hours, which helps to improve their efficiency and supports better performance.
A new approach to carrying out vital maintenance inspections of railway infrastructure across Kent is to be expanded this year in a drive to improve efficiency and performance.
Delivered by South Eastern Railway, which brings the publicly owned train operator, Southeastern and infrastructure provider, Network Rail Kent Route, under a single leadership team, the programme strikes a balance between the times of lower passenger demand and essential maintenance.
Maidstone East – Ashford International (08:25 London Victoria to Ashford International service diverted after Otford run fast to Ashford )
Sheerness - Sittingbourne (2 TPH to 1 TPH 09.25 to 15.25 )
Strood – Paddock Wood (2 TPH to 1 TPH 09.10 to 15.00 )
Tonbridge – Ashford (2 TPH to 1 TPH 09.40 to 15.00 )
Not sure of the logic here as its ruins a turn up and go service on timetables that people know. It requires stock and crew alterations which probably reduces the overall efficiency.
Also the time it takes to setup and take a line blockage (be no point in a T3) still leaves limited working time of probably 40-45mins/hour and thats if they only take one of the lines.
Im surmising this has come about from Red Zone working being banned these days when daytime patrolling, inspections, lubrication and bolt tightening would have been done.
Seems to me its about trying to sell the SE Alliance working as beneficial but how is it really putting the passenger first.