It made me think after reading the moving units debate, what is the current situation for the electrification in Scotland.
The plan is the following routes should be electrified.
Glasgow - Edinburgh via Falkirk,
Polmont & Croy (yes I know that isn't where the junction is) - Dunblane
Glasgow - Larbert via Cumbernuald.
I haven't ever seen this project as formally been approved and paid for but as some people have seen in various magazines in some places overhead line mast piles are been sunk. I know the main Edinburgh - Glasgow line was planned to be running in 2014 but some piles are on the Cumbernauld route.
Once these lines are done then maybe some 158's will be released. The other thing to remember however is that the Boarders rail link will need some 158's released from the electrification.
The masterplan would be to divert the Cumbernauld route to Low level to free up capacity for another express Edinburgh - Glasgow service.
The plan is the following routes should be electrified.
Glasgow - Edinburgh via Falkirk,
Polmont & Croy (yes I know that isn't where the junction is) - Dunblane
Glasgow - Larbert via Cumbernuald.
I haven't ever seen this project as formally been approved and paid for but as some people have seen in various magazines in some places overhead line mast piles are been sunk. I know the main Edinburgh - Glasgow line was planned to be running in 2014 but some piles are on the Cumbernauld route.
Once these lines are done then maybe some 158's will be released. The other thing to remember however is that the Boarders rail link will need some 158's released from the electrification.
The masterplan would be to divert the Cumbernauld route to Low level to free up capacity for another express Edinburgh - Glasgow service.
Incidently OT, its a pleasure.