Seen a 385 on platform 11 at Edinburgh around 5pm today . Passing Haymarket seen at least one HST though 2 powercars .

There were 2 HST power cars joined at Haymarket depot yesterday that I noticed. In different places morning and evening
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
I'd heard transformers. And I would be surprised if Hitachi weren't already being fined for late delivery - if it is the relevant contracts. Understandably, they aren't going to be making a song and dance about it though.
 

Chris125

Established Member
Joined
12 Nov 2009
Messages
3,265
Location
Isle of Wight
At this rate, is the order for Class 195 DMUs really necessary on top of 769 bimode conversions? If we aren't careful, there is going to be a glut of DMUs.

Northern has approx 100 Pacers to withdraw in the next couple of years while introducing unproven 769s and 195s, I doubt they are worrying too much about a glut of DMUs!
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,901
Location
North
Northern has approx 100 Pacers to withdraw in the next couple of years while introducing unproven 769s and 195s, I doubt they are worrying too much about a glut of DMUs!
It was a tongue in cheek comment. DMUs have been in short supply for so long it will be nice to have a correct length train for the passengers on offer and something more than a two axle wagon with seats in.
 

marks87

Established Member
Joined
23 Jun 2010
Messages
1,658
Location
Dundee
(Posting in this thread because it seems relevant to Scottish electrification)

ScotRail have been posting photos on their Twitter feed from the landslip at Winchburgh.

DUZFw27XkAcyj2T.jpg


(Photo shows work being done to repair the landslip damage)

Is it just coincidence that the debris has fallen from where a OHLE mast has been erected?
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,464
Location
Preston Lancs
Is it just coincidence that the debris has fallen from where a OHLE mast has been erected?

I highly doubt it is coincidence - I strongly suspect and would bet good money on the fact that the mast/foundation/prep etc has disturbed the ground enough to at least be A factor in the landslip. IMHO.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,236
I highly doubt it is coincidence - I strongly suspect and would bet good money on the fact that the mast/foundation/prep etc has disturbed the ground enough to at least be A factor in the landslip. IMHO.
That looks like the land slip is 13 sleepers away from the mast so not that close...
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
What picture are you looking at? On the ones I've seen, the slipped area is very centred directly below the OHLE structure.

I wonder if the repair is temporary or permanent, is they will have to return to rebuild the retaining wall.
 

JohnR

Member
Joined
23 Jul 2010
Messages
495
What picture are you looking at? On the ones I've seen, the slipped area is very centred directly below the OHLE structure.

I wonder if the repair is temporary or permanent, is they will have to return to rebuild the retaining wall.

Indeed in the picture above, you can see the two workers in orange at the site of the slip half way up the bank, just below the mast.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
not only will they need to repair this location, but they'll presumably now have to assess all the other foundations
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,464
Location
Preston Lancs
I highly doubt it is coincidence - I strongly suspect and would bet good money on the fact that the mast/foundation/prep etc has disturbed the ground enough to at least be A factor in the landslip. IMHO.

Definitely from pictures ive seen the ole pile is in lne with the middle of the failure.

I repeat what I said above -not necessarily the cause but --- A factor ---- IMHO.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,901
Location
North
It would be interesting to see the original risk register, if such a failure was identified & what was done to mitigate the risk.
Making it a portal structure instead of single masts was mitigating risk and taking pressure off the retaining wall.
 

158756

Established Member
Joined
12 Aug 2014
Messages
1,628
The rumour going round - and I stress it is only a rumour - is that there won't be any 385s ready to enter passenger service until July.

If this comes to pass and Scotrail need the DMUs planned to leave before July is it Scotrail or Northern who end up short of stock?
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,609
If this comes to pass and Scotrail need the DMUs planned to leave before July is it Scotrail or Northern who end up short of stock?

Seeing as agreements have been signed I suspect its ScotRail that end up short.
 

Highlandspring

Established Member
Joined
14 Oct 2017
Messages
2,777
ScotRail will go short, the trains go off lease regardless. They're losing four 170s next month I believe...
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,590
Location
Scotland
It'll be interesting to see how they spin this one...
Actually, if anyone from Abellio / Scotrail is reading this thread the best thing you can do is not try to spin it at all. Just be honest: "We made our fleet plans expecting the new electric trains be running by <date>, and gave ourselves <weeks> grace period. Things didn't go to plan and it turns out we're going to be short a few trains for <weeks>. We'll do our best to get provide as many services as possible and we'll let you know how we're doing. We're really sorry about any inconvenience."
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,464
Location
Preston Lancs
Actually, if anyone from Abellio / Scotrail is reading this thread the best thing you can do is not try to spin it at all. Just be honest: "We made our fleet plans expecting the new electric trains be running by <date>, and gave ourselves <weeks> grace period. Things didn't go to plan and it turns out we're going to be short a few trains for <weeks>. We'll do our best to get provide as many services as possible and we'll let you know how we're doing. We're really sorry about any inconvenience."

Ab-so-lute-ly . Churchill’s greatest strength. Don’t sugar coat or spin, tell the truth. I would do exactly as you suggest.
 

Southsider

Member
Joined
10 Aug 2015
Messages
937
I'd heard transformers. And I would be surprised if Hitachi weren't already being fined for late delivery - if it is the relevant contracts. Understandably, they aren't going to be making a song and dance about it though.
Would they still be delivering them if major faults have been identified? On the 385 discussion thread it's clear Hitachi are continuing to send them north and test runs are taking place. On the other hand, Scotrail are unwilling to commit to an in-service date.
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
That's what I was thinking. I believe it's up to ORR when they are approved for passenger service.
 

Altnabreac

Established Member
Joined
20 Apr 2013
Messages
2,424
Location
Salt & Vinegar
So I had a wee trip along the Shotts line this morning and all is looking good for progress on the electrification.

Lots of masts up and bases look to be mainly in place where there aren't masts.

In terms of structures the accommodation bridge at Hartwoodhill looked to be finished now, though there hasn't been any news of that on Twitter. The remaining problem structures look to be:
Hartwood Station Footbridge - needs removed. East bound platform doesn't look to have any other access except via Footbridge so not clear if plan here is a new footbridge or building an entirely new access route.
Breich Station Footbridge - Needs removed. Again unclear whether plan is a new bridge or alternative access route to eastbound platform.
Addiewell Station Footbridge - Needs removed. New Footbridge almost complete.
West Calder Station Footbridge - Needs removed. New Footbridge almost complete.
285/126 Parkhead - New road bridge has been built but old bridge is still there and may need removed?

Stations wise there are rebuilds awaited at Livingston South & Breich; platform extensions at Carfin, Shotts & West Calder and improvements to CCTV, CIS platforms etc at Addiewell, Fauldhouse, Hartwood and Cleland.

Still not clear whether Breich station will be moved closer to the village or rebuilt on approximately the same site as present.

Work seems to be continuing on the ground despite the Carillion situation but difficult to know whether there will be future problems arising from Carillion administration.
 
Status