Eastfield is a modern depot (built around 2004, on an old railway site) so electrification was going to be fairly simple.
It might have been the incoming Abellio fleet plans which made the change happen. For instance, Millerhill depot was planned for the 'worst case' scenario of a totally separate electric fleet. Since Hitachi can do heavy maintenance alongside the IEPs at Craigentinny, Millerhill won't be as big or important as planned. Eastfield might have been affected by the use of HSTs, and the EGIP trains for 314 replacements. There might now be fewer diesel trains able to use Eastfield, while the Millerhill/Craigentinny depots will be busier than expected.
It might have been the incoming Abellio fleet plans which made the change happen. For instance, Millerhill depot was planned for the 'worst case' scenario of a totally separate electric fleet. Since Hitachi can do heavy maintenance alongside the IEPs at Craigentinny, Millerhill won't be as big or important as planned. Eastfield might have been affected by the use of HSTs, and the EGIP trains for 314 replacements. There might now be fewer diesel trains able to use Eastfield, while the Millerhill/Craigentinny depots will be busier than expected.