• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Scottish Electrification updates & discussion

Status
Not open for further replies.

me123

Established Member
Joined
9 Jul 2007
Messages
8,510
Some more updates from Winchburgh:
BBC Scotland news piece, airing tonight.
CIpwkP7WIAAnXMs.jpg

Eastbound track looks close to ready Westbound track has bow been lifted.
CJJkWtwWwAANZD7.jpg

The above image obtained from Jeffray Wotherspoon's Twitter Account (@jw26040), all credit to photographer, click on through to see some excellent images of the work, and indeed some other really good railway images.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

PaulLothian

Member
Joined
27 Sep 2010
Messages
695
Location
Linlithgow
Seems to be a considerable over-investment in Rail Replacement Buses for Winchburgh closure.

I know previous threads have discussed this, and need for PNBs for drivers, etc. Nevertheless, buses running in twos between Linlithgow and Edinburgh Park out of normal working hours seems wasteful. A convoy of three arrived at about 18:30 yesterday with 6 passengers in total. Talking to temporary Scotrail staff at Linlithgow, that was a normal peak period loading, and I was told a number of drivers report having not carried a single passenger all day! Presumably a consequence of being the second bus in the convoy.

For a journey such as this, should it not be possible to realistically assess loadings based on normal ticket sales? This would suggest that a single midi-sized bus would be adequate.

Having said that, the variety of buses in use is interesting; I could almost become a bus spotter...
 

Blindtraveler

Established Member
Joined
28 Feb 2011
Messages
10,544
I believe that many more were running initially but were withdrawn, I too have thought from the off that its overkill
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,595
Location
Scotland
Seems to be a considerable over-investment in Rail Replacement Buses for Winchburgh closure.
Better an over-investment than under. It's a lot easier to cancel buses than to call them up at short notice.
Is the over provision of buses down to simply matching the capacity of the train being replaced?
Rather than actually assessing the use that the particular train gets.
But that could also be down to the publicity campaigns working and people changing their travel patterns.
 

Altnabreac

Established Member
Joined
20 Apr 2013
Messages
2,424
Location
Salt & Vinegar
Better an over-investment than under. It's a lot easier to cancel buses than to call them up at short notice.
But that could also be down to the publicity campaigns working and people changing their travel patterns.

Agreed, much more sensible to have too many busses than too few.

I think people really have changed their travel habits and a few people may end up sticking with the new options after the closure.

Several people have remarked to me on how quick the Shotts line semi fast service is, especially once you take into account the time crossing Glasgow for passengers from south Glasgow / Ayrshire.

I also took the Glasgow to Edinburgh via Carstairs train this week and it was much busier than usual so people really have been looking at all the alternatives and making good use of them.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
It is of course the first couple of weeks of school holidays in Scotland; prime time for a great many families to be away before the English schools break up, pushing holiday prices up.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
Seems to be a considerable over-investment in Rail Replacement Buses for Winchburgh closure.

I know previous threads have discussed this, and need for PNBs for drivers, etc. Nevertheless, buses running in twos between Linlithgow and Edinburgh Park out of normal working hours seems wasteful. A convoy of three arrived at about 18:30 yesterday with 6 passengers in total. Talking to temporary Scotrail staff at Linlithgow, that was a normal peak period loading, and I was told a number of drivers report having not carried a single passenger all day! Presumably a consequence of being the second bus in the convoy.

For a journey such as this, should it not be possible to realistically assess loadings based on normal ticket sales? This would suggest that a single midi-sized bus would be adequate.

Having said that, the variety of buses in use is interesting; I could almost become a bus spotter...

Also how many people have accepted the longer journey time via Dalmeny reversals rather than get the bus? We are always told via regular research that passengers prefer longer journeys (up to a point) on diverted trains rather than changing onto buses.
 

Blindtraveler

Established Member
Joined
28 Feb 2011
Messages
10,544
Something else occured to me last night also, as I was exiting EDB following a quick visit to boots (nearest 1 to where I was at the time) and both a Stirling via Dalmeny train and Linlithgow via Edinburgh Park bus were called at the same time for a departure withing a minute of eachother. This cant be helpful surely, given how there are usually 10-15 minute gaps between regular Linlithgo trains?
 

me123

Established Member
Joined
9 Jul 2007
Messages
8,510
Reopening of the line due on Monday. Seems to have gone well all in all, but I think people traveling have been choosing either not to travel or to go by road. I think it bodes well for the five month closure next year, although I certainly hope that the combination of the closures doesn't just push more and more people into cars.

Anyway, the lines have been laid:
CKR20ogXAAAxCgs.jpg

The conductor bar installed:
CKiE2zlXAAAyEpx.jpg

And drainage in situ
CKl8pYUXAAAx82R.jpg


It's great to see the work completed on time.

(Pictures from the EGIP Twitter account).
 

Mulson

Member
Joined
2 Oct 2014
Messages
30
Location
Stirlingshire
I commute daily from Polmont to Edinburgh and I must admit I think Scotrail/Network rail have dealt with the level of disruption really quite well.

I am lucky in that I don't have to worry about bus replacements as I always make a Dalmeny turn so it may be easier for me to be positive about it.

It must be mentioned that Polmont station has been a lot quieter during the timetable changes. The car park(s) are usually always full by 8am-ish but the 2nd carpark has been half empty during peak times during the changes.

It looks like a lot of people were just scared off by the scale of disruption and chose other means of travel.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,479
Location
Preston Lancs
Reopening of the line due on Monday. Seems to have gone well all in all,

Anyway, the lines have been laid:

It's great to see the work completed on time.

Agreed -I wish they would come down to England and teach us English how to do it.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,243
Agreed -I wish they would come down to England and teach us English how to do it.

There are other ways to do this. The slab tracking for gauge clearance through the 500ish yard Southampton tunnel was done one side at a time, with the other track open for bidirectional working for the majority of the working week.

The overall project was planned for two closure periods over successive Christmas and New Year blocks, but they compressed the job into one period and finished a year early...
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,479
Location
Preston Lancs
There are other ways to do this. The slab tracking for gauge clearance through the 500ish yard Southampton tunnel was done one side at a time, with the other track open for bidirectional working for the majority of the working week.

The overall project was planned for two closure periods over successive Christmas and New Year blocks, but they compressed the job into one period and finished a year early...

Thanks for that reminder - I had forgotten about that. :D
--- old post above --- --- new post below ---
And drainage in situ
CKl8pYUXAAAx82R.jpg


(Pictures from the EGIP Twitter account).

What is that material - 3cm limestone? It is definitely not crusher-run.
 

47271

Established Member
Joined
28 Apr 2015
Messages
2,983
We drove past Winchburgh from Newbridge last Saturday and indeed there's no sign of any overhead at the Edinburgh end of the closed section. However we did see quite a few masts up between Philpstoun and Linlithgow, in other words in the section that's remained open to the west of Winchburgh Jn.
 

PaxVobiscum

Established Member
Joined
4 Feb 2012
Messages
2,410
Location
Glasgow
We drove past Winchburgh from Newbridge last Saturday and indeed there's no sign of any overhead at the Edinburgh end of the closed section. However we did see quite a few masts up between Philpstoun and Linlithgow, in other words in the section that's remained open to the west of Winchburgh Jn.

There was a picture of mast bases at Falkirk on Railscot at the beginning of May so the masts are probably up there by now.
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,304
Will all of Queen Street HL - Newbridge Junction be completed and powered up at the same time?
 

route:oxford

Established Member
Joined
1 Nov 2008
Messages
4,949
Will all of Queen Street HL - Newbridge Junction be completed and powered up at the same time?

This is the bit of the project that doesn't make sense to me really.

A triangle is being electrified with complex tunnel issues at Winchburgh and another Complex tunnel issue at Queen Street. A slightly less complex tunnel issue at Dunblane.

Is it just out of vanity that it had to be the Edinburgh-Glasgow route that is undertaken first - when there are already electrified routes between the cities?

Electrifying Edinburgh-Dunblane first would have been an earlier win, release around 5-6 170 units from diagrams to strengthen services elsewhere in Scotland and making sooner use of the capital cost of the infrastructure and also allow IEP and Pendolino to run further North.
 

Carntyne

Member
Joined
8 Jul 2015
Messages
1,023
Is it just out of vanity that it had to be the Edinburgh-Glasgow route that is undertaken first - when there are already electrified routes between the cities?

It's the flagship route in Scotland and needs more capacity, good to use it to kick on and show what can be done. EGIP by and large has gone without a hitch so far.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
It's the flagship route in Scotland and needs more capacity, good to use it to kick on and show what can be done. EGIP by and large has gone without a hitch so far.

Once the odd bout of pausing and descoping had been done to get the cost down.
But it's good to see things progressing now without panic.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,595
Location
Scotland
Once the odd bout of pausing and descoping had been done to get the cost down.
But it's good to see things progressing now without panic.
Better to de-scope the project down to something that can be delivered than the other way round as seems to be happening in England. Plus, other than the deletion of the Dalmeny Chord I'd say that the project as-delivered is probably better than the original plans: the real problem between Edinburgh and Glasgow isn't frequency (you're already close to 4tph) but rather lack of seats so the same number of longer trains is probably the better way to go.
 

clc

Established Member
Joined
31 Oct 2011
Messages
1,326
Better to de-scope the project down to something that can be delivered than the other way round as seems to be happening in England. Plus, other than the deletion of the Dalmeny Chord I'd say that the project as-delivered is probably better than the original plans: the real problem between Edinburgh and Glasgow isn't frequency (you're already close to 4tph) but rather lack of seats so the same number of longer trains is probably the better way to go.

Plus no point spending money on additional capacity that would become redundant once Edinburgh-Glasgow HSR was built.
 

Philip Phlopp

Established Member
Joined
31 May 2015
Messages
3,003
Plus no point spending money on additional capacity that would become redundant once Edinburgh-Glasgow HSR was built.

The problems there are

(a) additional capacity rarely goes amiss - uses would have been found for any spare capacity, between new stations, new routes and perhaps further re-openings, it would have been put to some use.

(b) the Edinburgh-Glasgow High Speed Rail line has died a death - the reports don't appear to have been submitted to Ministers on schedule and apart from vague mentions in planning framework documents, it's not really being talked about.

NPF3 from July 2014 talks about EGIP Phase 2 (the bits that were de-scoped) OR High Speed Rail being progressed with a time frame beyond the mid 2020s, then EGIP Phase 2 vanishes from the document completely and it's back to vague discussion about Edinburgh to Glasgow High Speed Rail by mid 2020s.
 
Status
Not open for further replies.

Top