• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Scotrail roles in Aberdeen

Status
Not open for further replies.

Resort Nomad

New Member
Joined
5 Nov 2013
Messages
1
Location
london
Hi guys i'm new to this forum, and my question is: if anyone got shortlisted to Scotrail Aberdeen depot? Closing date was 27/09/2013.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

mr double 77

Member
Joined
2 Feb 2013
Messages
130
Location
Manchester
Not heard anything myself pal, no news is bad news keep the faith
--- old post above --- --- new post below ---
Thank you for your application for a Trainee Train Driver [First ScotRail] role with First at Aberdeen Rail Station.

On this occasion, demand for this role has been high and whilst your application has met the initial sift and passed the minimum screening required for the role, there are a limited number of assessment and interview slots. There is a possibility that further assessment dates will come up, and with this in mind, we would like to keep your application on hold. ( received this today don't know if this is good news, but saying that have never been entertained with them before so it's not a complete rejection
 

red2005

Member
Joined
9 May 2009
Messages
844
Location
north ish
I had the same email!

I recently passed the tests but at the time of application I hadn't so I sent them a reply informing them that I've passed since to see if that will make a difference!
 

mr double 77

Member
Joined
2 Feb 2013
Messages
130
Location
Manchester
I did stage 1 with northern rail fail mechanical but got good passes on TRP parts 1+2 and GBT sure it's still a fail even with Scott rail even though mechanical has now been dropped
 

13oon

Member
Joined
29 Nov 2012
Messages
24
Location
Bishopbriggs Glasgow
Not heard anything myself pal, no news is bad news keep the faith
--- old post above --- --- new post below ---
Thank you for your application for a Trainee Train Driver [First ScotRail] role with First at Aberdeen Rail Station.

On this occasion, demand for this role has been high and whilst your application has met the initial sift and passed the minimum screening required for the role, there are a limited number of assessment and interview slots. There is a possibility that further assessment dates will come up, and with this in mind, we would like to keep your application on hold. ( received this today don't know if this is good news, but saying that have never been entertained with them before so it's not a complete rejection

When i applied with scotrail last October i got the same response as you but about two weeks later they replied inviting me for assessments so def keep the faith.
 

mr double 77

Member
Joined
2 Feb 2013
Messages
130
Location
Manchester
When i applied with scotrail last October i got the same response as you but about two weeks later they replied inviting me for assessments so def keep the faith.

Yeah don't know if you read my comment after the one you quoted on, hopefully they will drag it out as I am worried they will take into account I failed the MT4 which is now obsolete, really want this job am currently a tram driver, and looking to make the next step
 
Status
Not open for further replies.

Top