• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

ScotRail HST Introduction - Updates & Discussion

Status
Not open for further replies.

BRX

Established Member
Joined
20 Oct 2008
Messages
4,516
What about the ex-motorail siding that's parallel with platform 1?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Hercules

New Member
Joined
20 Mar 2018
Messages
3
Location
Glasgow
You sure about that?

Bearing in mind it's been some time since I've been to Inverness but RTT states that the following is booked to happen on a typical weekday:

1S25 Caledonian Sleeper arrives Platform 1 at 08:41

5S25 Caledonian Sleeper departs Platform 1 at 09:08
5S25 Caledonian Sleeper arrives Inverness Motorail Sdg via Inverness TMD at 11:01

5M16 Caledonian Sleeper departs Inverness Motorail Sdg at 18:30
5M16 Caledonian Sleeper arrives Platform 2 at 18:41

1M16 Caledonian Sleeper departs Platform 2 at 20:45

So there shouldn't be any reason for it to be hogging a platform during the day so I can't see why there should be any issues in any case in the current timetable only 4 services (Scotrail btw) are booked to use Platforms 1 and 2 between 09:15 and 18:15 so is very much underused but perfect for these HSTs of Scotrail.


Not paying attention to RTT timings on the ECS movements at INV. The sleeper has been shunted back into Platform 2 by 1pm every day this week.
 

jingsmonty

Member
Joined
21 Oct 2014
Messages
1,022
Location
Inverness
What about the ex-motorail siding that's parallel with platform 1?

Think the motorail siding was where 'platform 0' was to come from....we are not permitted to use it at all as there is no walking route to/from it (although I believe the sleeper has been stabled there perviously, possibly over Christmas & New Year).
 

gsnedders

Established Member
Joined
6 Sep 2015
Messages
1,472
I'm just going by what the Scotrail Manager said as justification for not having a full 2+5 fleet - you probably know who it is if you've read the article. I'm assuming that a 7 car EMU doesn't fit onto platforms 2, 5 + 6 then (obviously platform 1 as well)?

If 2+5 HST sets run just now, along with 7 car EMUs, would that not cause capacity problems at Queen St?

Any idea when the platform lengthening work is due to be completed? I've lost track of that one!

Remember they're about 10m shorter than a 7 car EMU.

Maximum occupation for Glasgow Queen Street High Level:

Platform 1: 74m, so 3x20m, 3x23m, 2+1 HST
Platform 2: 157m, so 7x20m, 6x23m, 2+5 HST
Platform 3: 174m, so 8x20m, 7x23m, 2+6 HST
Platform 4: 174m, so 8x20m, 7x23m, 2+6 HST
Platform 5: 150m, so 7x20m, 6x23m, 2+4 HST (just! 2+5 HST might fit before the starter with the end of the PC off the platform)
Platform 6: 155m, so 7x20m, 6x23m, 2+5 HST
Platform 7: 198m, so 9x20m, 8x23m, 2+7 HST

So yeah, can't fit a 7 car EMU into 1, 2, 5 or 6.

In the short term, while there are still plenty of DMUs running out of Queen Street, having the hourly services to Aberdeen and Inverness as 2+5 HSTs be unable to use platform 5, but can use any other shouldn't cause too much trouble. The bigger questions will be when more of the commuter services start to get replaced by EMUs (especially 365s in the short term, as 2 365s can't double-occupy many platforms).
 

jingsmonty

Member
Joined
21 Oct 2014
Messages
1,022
Location
Inverness
Remember they're about 10m shorter than a 7 car EMU.

Maximum occupation for Glasgow Queen Street High Level:

Platform 1: 74m, so 3x20m, 3x23m, 2+1 HST
Platform 2: 157m, so 7x20m, 6x23m, 2+5 HST
Platform 3: 174m, so 8x20m, 7x23m, 2+6 HST
Platform 4: 174m, so 8x20m, 7x23m, 2+6 HST
Platform 5: 150m, so 7x20m, 6x23m, 2+4 HST (just! 2+5 HST might fit before the starter with the end of the PC off the platform)
Platform 6: 155m, so 7x20m, 6x23m, 2+5 HST
Platform 7: 198m, so 9x20m, 8x23m, 2+7 HST

So yeah, can't fit a 7 car EMU into 1, 2, 5 or 6.

In the short term, while there are still plenty of DMUs running out of Queen Street, having the hourly services to Aberdeen and Inverness as 2+5 HSTs be unable to use platform 5, but can use any other shouldn't cause too much trouble. The bigger questions will be when more of the commuter services start to get replaced by EMUs (especially 365s in the short term, as 2 365s can't double-occupy many platforms).

Cheers for that - I think the najor capacity restraints at Inverness will be a big issue though...particularly with the 2+5 sets
 

gingertom

Established Member
Joined
19 Jun 2017
Messages
1,335
Location
Kilsyth
Cheers for that - I think the najor capacity restraints at Inverness will be a big issue though...particularly with the 2+5 sets
IIRC the plan was 2+5s to Aberdeen and 2+4s to Inverness. For a different thread but is Inverness station not due a rebuild and is out to consultation?
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
AFAIK the rebuild of the station is all 'front of house', not track layout.
 

SC43090

Member
Joined
7 Sep 2018
Messages
197
There's one thing that everybody seems to have overlooked... The EX FGW HST sets have selective door opening so i would have thought it wouldn't be a problem unless its been removed by Scotrail.... The reason why FGW had it fitted was because there services stopped at short platforms like Exeter ST Thomas, Starcross, Dawlish Warren, Redruth, Hayle, Torre, plus many other stations on the Great Western routes that have short platforms...

SC43090
 

gsnedders

Established Member
Joined
6 Sep 2015
Messages
1,472
AFAIK the rebuild of the station is all 'front of house', not track layout.
Oh, I forgot to address that in my previous post: yes, it's a simple extension of the platforms lengthwise towards the end of the train shed (and AFAIK they have more collapsible material in there than needed beyond the buffers to make that easy), and that can only be done when the new extension on the front of the train shed is completed. Last I heard was they should be extended by the 2019 December timetable. The track layout work was all completed during the 2016 closure of High Level.


There's one thing that everybody seems to have overlooked... The EX FGW HST sets have selective door opening so i would have thought it wouldn't be a problem unless its been removed by Scotrail.... The reason why FGW had it fitted was because there services stopped at short platforms like Exeter ST Thomas, Starcross, Dawlish Warren, Redruth, Hayle, Torre, plus many other stations on the Great Western routes that have short platforms...
That doesn't help in the majority of these cases, given the problematic places are the terminuses where you'll be beyond the starting signals and fouling points if you're too long. Many of the stations are already busy enough without each HST effectively taking up multiple platforms!
 

jingsmonty

Member
Joined
21 Oct 2014
Messages
1,022
Location
Inverness
IIRC the plan was 2+5s to Aberdeen and 2+4s to Inverness. For a different thread but is Inverness station not due a rebuild and is out to consultation?

It is, but this isn't anything to do with the actual track/infrastructure - it's the retail part of Inverness station
 

jingsmonty

Member
Joined
21 Oct 2014
Messages
1,022
Location
Inverness
There's one thing that everybody seems to have overlooked... The EX FGW HST sets have selective door opening so i would have thought it wouldn't be a problem unless its been removed by Scotrail.... The reason why FGW had it fitted was because there services stopped at short platforms like Exeter ST Thomas, Starcross, Dawlish Warren, Redruth, Hayle, Torre, plus many other stations on the Great Western routes that have short platforms...

SC43090
1929

Just as an aside, the Class 170s have selective door opening too - which train crew are forbidden to use (& which may have possibly been isolated, since my Conductor days...).
 

jingsmonty

Member
Joined
21 Oct 2014
Messages
1,022
Location
Inverness
IIRC the plan was 2+5s to Aberdeen and 2+4s to Inverness. For a different thread but is Inverness station not due a rebuild and is out to consultation?

I'm sure you're correct (think I remember that from the roadshow that Abellio did for staff before the current franchise started), but how long before a set is stepped up & ends up on the wrong working, possibly ending up causing chaos at a terminal station! At Inverness, I suppose that if a 2+5 arrived & had to go into Platform 3 or 4, the coaches would be on the platform, at least - but the rear power car would be hanging off the platform end, past the signal. Ok in an emergency, but not for a regular working!
 

route101

Veteran Member
Joined
16 May 2010
Messages
12,281
Oh, I forgot to address that in my previous post: yes, it's a simple extension of the platforms lengthwise towards the end of the train shed (and AFAIK they have more collapsible material in there than needed beyond the buffers to make that easy), and that can only be done when the new extension on the front of the train shed is completed. Last I heard was they should be extended by the 2019 December timetable. The track layout work was all completed during the 2016 closure of High Level.



That doesn't help in the majority of these cases, given the problematic places are the terminuses where you'll be beyond the starting signals and fouling points if you're too long. Many of the stations are already busy enough without each HST effectively taking up multiple platforms!

Is there track under the 'collapsible material' ?
 

jingsmonty

Member
Joined
21 Oct 2014
Messages
1,022
Location
Inverness
Oh, I forgot to address that in my previous post: yes, it's a simple extension of the platforms lengthwise towards the end of the train shed (and AFAIK they have more collapsible material in there than needed beyond the buffers to make that easy), and that can only be done when the new extension on the front of the train shed is completed. Last I heard was they should be extended by the 2019 December timetable. The track layout work was all completed during the 2016 closure of High Level.



That doesn't help in the majority of these cases, given the problematic places are the terminuses where you'll be beyond the starting signals and fouling points if you're too long. Many of the stations are already busy enough without each HST effectively taking up multiple platforms!

Thanks for the update on the Queen St platform extensions - I wasn't sure what the completion date for this was. Still doesn't address the numerous infrastructure issues in Inverness, though..have heard nothing official on this front as yet...
 

BRX

Established Member
Joined
20 Oct 2008
Messages
4,516
At one point in the past there was a proposal to rebuild Inverness station with 'through' platforms - in other words shift the platforms to the 'through' side of the triangle. Did that ever get anywhere? Obviously it would be quite a major job, and it would be a shame in a way for the current somewhat quirky layout o go, but it's not hard to see what benefits it could bring.
 

jingsmonty

Member
Joined
21 Oct 2014
Messages
1,022
Location
Inverness
At one point in the past there was a proposal to rebuild Inverness station with 'through' platforms - in other words shift the platforms to the 'through' side of the triangle. Did that ever get anywhere? Obviously it would be quite a major job, and it would be a shame in a way for the current somewhat quirky layout o go, but it's not hard to see what benefits it could bring.

There probably was, at one time - more recently, I did hear a rumour about 'Platform 8', which would have been a through platform on the Rose St curve. Think this was just a rumour though - there aren't that many through trains anyway (1, to be exact - the 1713 Kyle of Lochalsh to Elgin...).

The layout is certainly 'quirky' - as I have found when working nightshift & trying to marshall all the sets in the right order for the next morning's departures!
 

Ben.A.98

Member
Joined
13 Feb 2013
Messages
231
At Inverness, I suppose that if a 2+5 arrived & had to go into Platform 3 or 4, the coaches would be on the platform, at least - but the rear power car would be hanging off the platform end, past the signal. Ok in an emergency, but not for a regular working!

Is that not exactly why we maintain the standouts fitted to the platform starters?
 

jingsmonty

Member
Joined
21 Oct 2014
Messages
1,022
Location
Inverness
Is that not exactly why we maintain the standouts fitted to the platform starters?

I don't understand your point here - what do you mean?

I've had to start ahead of the signal here once, but that was due to a 4 car 158 being accidentally routed into platform 4 on top of a 170...only takes a 6 car. Certainly not something that should ever be taken for granted or written into a normal working diagram - that's a SASSPAD waiting to happen.....
 

gordonjahn

Member
Joined
23 Oct 2010
Messages
146
Remember they're about 10m shorter than a 7 car EMU.

Maximum occupation for Glasgow Queen Street High Level:

Platform 1: 74m, so 3x20m, 3x23m, 2+1 HST
Platform 2: 157m, so 7x20m, 6x23m, 2+5 HST
Platform 3: 174m, so 8x20m, 7x23m, 2+6 HST
Platform 4: 174m, so 8x20m, 7x23m, 2+6 HST
Platform 5: 150m, so 7x20m, 6x23m, 2+4 HST (just! 2+5 HST might fit before the starter with the end of the PC off the platform)
Platform 6: 155m, so 7x20m, 6x23m, 2+5 HST
Platform 7: 198m, so 9x20m, 8x23m, 2+7 HST

So yeah, can't fit a 7 car EMU into 1, 2, 5 or 6.

In the short term, while there are still plenty of DMUs running out of Queen Street, having the hourly services to Aberdeen and Inverness as 2+5 HSTs be unable to use platform 5, but can use any other shouldn't cause too much trouble. The bigger questions will be when more of the commuter services start to get replaced by EMUs (especially 365s in the short term, as 2 365s can't double-occupy many platforms).

Platform 1 has been extended to take a 4 car set now too ( https://www.networkrail.co.uk/feeds/new-platform-arrives-for-glasgow-queen-street-passengers/ ) so you'd manage an HST 2+2 in the now (although 50m might make you think HST 2+3 would be doable... guess some of that space is behind the stops though).
 

Highland37

Established Member
Joined
29 Jun 2012
Messages
1,259
So you say but as research and decisions show, passengers do prefer a less noisy and vibrating environment. That is one of the reasons they chose to go with the HSTs.
 

mullac30

Member
Joined
2 Jul 2017
Messages
129
If the ex-GW sets are being put into service unrefibished, is there any chance of them being rebranded like the 365's? Silver doors and Saltire logos?
 

gsnedders

Established Member
Joined
6 Sep 2015
Messages
1,472

Ben.A.98

Member
Joined
13 Feb 2013
Messages
231
I don't understand your point here - what do you mean?

I've had to start ahead of the signal here once, but that was due to a 4 car 158 being accidentally routed into platform 4 on top of a 170...only takes a 6 car. Certainly not something that should ever be taken for granted or written into a normal working diagram - that's a SASSPAD waiting to happen.....

I was always told that these indicators are fitted to allow trains to start when ahead of the signal, is there now policy preventing/limiting this?
 

Attachments

  • Inv Standouts.jpg
    Inv Standouts.jpg
    110.8 KB · Views: 149
Status
Not open for further replies.

Top