Looking at this picture closely, I can spot 7 ScotRail Mk3s in it. So I’m wondering if ScotRail is waiting on the completion of at least another one, giving them 2 x 4 coach sets for testing and service?
Given that the Open is at Carnoustie, one would have thought the priority would be services to/from Dundee.Potentially could be using them for extra trains during the open.
Max 100mph in various places.Forgive me if this has been asked before. Is there anywhere north of Glasgow Edinburgh where they can exceed 90mph or even reach 125?
Thanks
K
And quite a few places where the limit could be increased to 110-115 if they felt the need for speed.Max 100mph in various places.
class 170s lack power and struggle on the southbound climb out of Inverness to Slochd summit and don't get anywhere near the linespeed. HSTs, especially our short-formed 2+4s, will have no difficulty with the ascent.Max 100mph in various places.
Let's hope they do it. Bits of 125 running would have good publicity value.And quite a few places where the limit could be increased to 110-115 if they felt the need for speed.
some decent stretches between Dalwhinnie and Kingussie where they could be opened up.Let's hope they do it. Bits of 125 running would have good publicity value.
K
The door design has been developed by Wabtec. What do you think would happen if the contract was now handed over to someone else?There is of course another contractor just across the rail line who could also do the HST work given a chance. Not to mention Springburn.
Time ScotRail got a hold of this contract and gave Wabtec an ultimatum. Either deliver or lose to contract to somebody who can deliver.
No doubt there is penalty clauses in the contract but that doesn't help passengers get their refurbished coaches. Of course penalty clauses could also hire in some coaches and locos to fill the shortfall.
however if an alternative contractor DID have a design ready and could promise to deliver faster then the time and money already taken up could be written off as a sunk cost.The door design has been developed by Wabtec. What do you think would happen if the contract was now handed over to someone else?
Second, cancelling with Wabtec now would create more delay as, even if you could solve the contractual issues, a new supplier would have to set up a production line and learn the same lessons as Doncaster have.
The door design has been developed by Wabtec. What do you think would happen if the contract was now handed over to someone else?
Second, cancelling with Wabtec now would create more delay as, even if you could solve the contractual issues, a new supplier would have to set up a production line and learn the same lessons as Doncaster have.
however if an alternative contractor DID have a design ready and could promise to deliver faster then the time and money already taken up could be written off as a sunk cost.
Surely there must be another contractor that could assist Wabtec with labour?
All well and good, but do you know of any other contractors who do have an alternative design that has been tested and is ready to install in mk3s at the drop of a hat? Seems unlikely to me.
Even if there was this mythical company, there's no guarantee they wouldn't run into the same problems as Wabtec and delivery would be delayed even further.
Also there would be two separate door systems which would add another layer of complications with spares and repairs, unless you propose the Wabtec carriages are similarly refitted which seems a terrific waste.
Also seems very unlikely that Scotrail will 'just' write off a significant amount of money.
Seems like a case of magical thinking.
Depends if the skills shortage is specific to Wabtec or the industry in general. Off the top of my head I can't think of any company with a suitably trained workforce sitting around twiddling their thumbs who could pick up this work at a moment's notice.
And you don’t think Wabtec have thought of ways of getting the work done faster? It’s not in their interests for it to be delayed.My point here is why cant Wabtec take on a sub contractor to work with them? simply put if the have squad working unpairs you add one sub contractor to one Wabtec experienced person and you double the work force and increase production. Not believing over the Uk there is not contract labour available.
Not believing over the Uk there is not contract labour available.
Last night they hired the LNER Edinburgh thunderbird and a driver but as it was the nature of the fault meant the leak had to be fixed on site, the train couldn't be assisted so it wasn't needed
The plan was always that ScotRail wouldn't be hiring a standby loco but I had heard a few months ago that decision might be revisited. Network Rail can only commandeer the nearest suitable loco to clear the line. At the start of the incident last night there was talk of using the Dundee HST driver training set to recover it, which would have been quite entertaining had it gone ahead. I wouldn't be surprised to see the FGW solution of back to back powercars being used to recover a failure at some point in the future.
Suitable skilled tradesmen that could work with existing Wabtec staff.Suitably trained subcontractors who are available in sufficient numbers that they'll speed up production?
Well that depends on the contract. If there are no penalties then maybe they want to make it last longer. Maybe leasing company have restrictions on who can do the work. I don’t know but seems to be relatively straight forward fabrication work that it would appear others could help with.And you don’t think Wabtec have thought of ways of getting the work done faster? It’s not in their interests for it to be delayed.

Suitable skilled tradesmen that could work with existing Wabtec staff.
They aren't that low down - don't forget it's quite a step up to the door sill on a HST.Those door buttons look very low down. Doesn't seem sensible to do that given that a wheelchair user cannot board without assistance, so having them at a height that looks like a taller elderly person will have to bend down does not make sense to me.
So you mean like the qualified fitters and fabricators they are advertising for already? I really think you are living in cloud cuckoo land if you think there are enough suitably qualified staff available for hire at a moment 's notice especially as train construction is going through a bit of a boom at the moment.
Looks good. Very nice livery. Is it ready for delivery?Found this on Twitter.
https://twitter.com/ardler67/status/1019539725495959553
Gary Straiton @ardler67
ScotRail Mk 3 at Wabtec. Picture by Christian Tait. #scotrail #intercity #inter7city #scotrailhst
12:09pm · 18 Jul 2018
![]()