Trainbike46
Established Member
When has any replacement fleet in this country entered service (and replaced it's predecessor) on time?Yes, but that's very different from "at least" 2030.
Mechanically I doubt the sets have 6 more years left in them.
When has any replacement fleet in this country entered service (and replaced it's predecessor) on time?Yes, but that's very different from "at least" 2030.
Mechanically I doubt the sets have 6 more years left in them.
I think you'd be more accurate to say that they might not have 6 years economical life left in them. They could be made to last another 60 years, if enough money was available. To whit, look at the USAF and the current project to re-engine their B-52 bombers. By the time they're expected to leave service, the oldest examples will be approaching 100 years old!Mechanically I doubt the sets have 6 more years left in them.
Funny you say that and the railway loves a rumour but someone did tell me that they had heard that transport scotland had asked about another five years.I think you need to try more closer to 2035... that is about the current estimation for full replacement if something was ordered right now.
I've heard lines like this often quoted, but I don't think it's realistic.I think you'd be more accurate to say that they might not have 6 years economical life left in them. They could be made to last another 60 years, if enough money was available. To whit, look at the USAF and the current project to re-engine their B-52 bombers. By the time they're expected to leave service, the oldest examples will be approaching 100 years old!
In fairness you'd hope at the end of the current lease they could buy the remaining operable sets for a peppercorn rate and allow a more serious running down of the fleet than currently where we're still paying for power cars that haven't run in 2 or 3 years and they scramble about trying to return them to work with mixed results.I've heard lines like this often quoted, but I don't think it's realistic.
The fact is that they're 5 years (or less) out of extensive overhaul and are not fit for purpose. Availability is through the floor, they're generally regarded as a pain by everyone who deals with them. An expensive pain.
If Transport Scotland signed such a bad contract that they're stuck with them then maybe they'll be dragged out to the bitter end. But I suspect that'll be before 2035. I just can't see them lasting another 12 years.
And there we have a big part of the problem. Attitude.I've heard lines like this often quoted, but I don't think it's realistic.
The fact is that they're 5 years (or less) out of extensive overhaul and are not fit for purpose. Availability is through the floor, they're generally regarded as a pain by everyone who deals with them. An expensive pain.
If Transport Scotland signed such a bad contract that they're stuck with them then maybe they'll be dragged out to the bitter end. But I suspect that'll be before 2035. I just can't see them lasting another 12 years.
That implies that there will be a fleet to run down in 2035...In fairness you'd hope at the end of the current lease they could buy the remaining operable sets for a peppercorn rate and allow a more serious running down of the fleet than currently where we're still paying for power cars that haven't run in 2 or 3 years and they scramble about trying to return them to work with mixed results.
Is this "confirmed?" Surley its better to pay a slightly more expensive leasing cost for a few years until new stock can be found (assuming ScotRail can get out of the HST lease) than have a fleet that's not going to work well.The only potential alternative, the 222s was discounted on cost.
They would be paying for both though.Is this "confirmed?" Surley its better to pay a slightly more expensive leasing cost for a few years until new stock can be found (assuming ScotRail can get out of the HST lease) than have a fleet that's not going to work well.
If the 222s were also owned by Angel trains, there might be a way of organizing an early termination in return for taking on the 222s, but as you'd have to get Eversholt involved too, I think that might be a bridge too far.Is this "confirmed?" Surley its better to pay a slightly more expensive leasing cost for a few years until new stock can be found (assuming ScotRail can get out of the HST lease) than have a fleet that's not going to work well.
I have posted this before, but seeing as you are sceptical...This whole conversation hinges on the contents of a lease agreement that I don't believe any of us have ever seen.....

The following new leases were entered into on existing or improved terms following the award of new franchises;
- 30 Class 442 vehicles with Govia Thameslink Railway Limited until January 2019, 90 Class 442 vehicles until January 2016 and 48 Class 317/3 vehicles until December 2019 (includes vehicles currently with Southern)
- 112 Class 357/2 vehicles with National Express Essex Thameside for 15 years until November 2029
- 271 vehicles have been leased with Abellio Scotrail:
- 76 x Class 156 leased from April 2015 to March 2025
- 20 x Class 156, 16 Class158 and 48 Class 314 leased from April 2015 to Dec 2018
- 175 x HST will be transferred from First Great Western and leased to Scotrail from September 2017 to March 2025, with a Section 54 until 2030
Well, that and on the other side somebody's passionate but unsourced belief that the machines are fundamentally broken and about to fall to pieces on the track they stand on.This whole conversation hinges on the contents of a lease agreement that I don't believe any of us have ever seen.....
Would have thought it was painfully obvious to everyone even tangentially involved that they're on their last legs? I mean come on....Well, that and on the other side somebody's passionate but unsourced belief that the machines are fundamentally broken and about to fall to pieces on the track they stand on.
Since I'm not completely familiar with the situation, would you be kind enough to provide a link to some of that evidence?The other half is enthusiasts sticking their fingers in their ears and acting as if nothing's wrong with their favourite trains, in spite of overwhelming evidence....
That's clearly the way you're interpreting it. I'm seeing a company which has come out of a challenging overhaul which was done on the cheap, finally made some of the changes which should have been made all along, and is starting to make progressing on training and retaining engineering talent. I'm not seeing the units do any worse than quite a lot of new stock in terms of miles per failure, or a company which would necessarily be doing any better with any intercity grade stock. It's not at all clear that switching horses in the middle of the race is a winning strategy here.Would have thought it was painfully obvious to everyone even tangentially involved that they're on their last legs? I mean come on....
Half this thread is people with links to the programme discussing how dire the HST situation is at Scotrail. The other half is enthusiasts sticking their fingers in their ears and acting as if nothing's wrong with their favourite trains, in spite of overwhelming evidence....
Can you explain why Scotrail would take on the class 222 units to replace the HSTs, when long term it maybe better to take on new BEMU units based on either Hitachi AT300, CAF Civity or Alstom Aventra?I speculate that the HSTs will go in around 2-3 years time, by then the 222s would become available.
The HSTs were somewhat controversial in Scotrail for their unreliable ATPs and the prohibitively high costs of ordering them back in 2018/2019 despite being decades old.
Though it's obvious on why Scotrail would take them as they were looking for Intercity style trains to run long distance In the region and HSTs were the only ones of the kind available.
I have no idea whether they will take on 222s, but one very obvious possible answer to your question might be that not enough electrification is now likely to be in place on the relevant timescale to allow use of BEMUs, except in Fife.Can you explain why Scotrail would take on the class 222 units to replace the HSTs, when long term it maybe better to take on new BEMU units based on either Hitachi AT300, CAF Civity or Alstom Aventra?
The answer to that problem is Stadler FLIRTs with generator carriages.I have no idea whether they will take on 222s, but one very obvious possible answer to your question might be that not enough electrification is now likely to be in place on the relevant timescale to allow use of BEMUs, except in Fife.
None currently, the only 100+ sections in Scotland are only on the ECML and WCML. ScotRail also only has a safety for 100mph presently.Is there any 100mph+ running on these routes?
What advantage would a 222 have over a FLIRT or similar?
true, but at least the 222s are going to be available soon and will last until the wires eventually go up. It will take some time to do a procurement for any bi/tri mode stock before they can be in service, by which time the HSTs will be even more knackered than they are now, if they even last that long.None currently, the only 100+ sections in Scotland are only on the ECML and WCML. ScotRail also only has a safety for 100mph presently.
222s would accelerate slower, also very inefficient internal use of space so lower capacity; Voyagers are slightly worse still mind you.
I agree. As someone who works on them on an almost daily basis, they are knackered! Any talk of the, lasting until 2035 is just fantasy. With set failures on a daily basis requiring 2 car 158s to pick up the pieces on Intercity routes resulting in passengers left behind is just not a situation which will be tolerated moving forward. I understand there a fitters on platforms in Inverness to see out every HST departure due to the unreliability of them.I speculate that the HSTs will go in around 2-3 years time, by then the 222s would become available.
The HSTs were somewhat controversial in Scotrail for their unreliable ATPs and the prohibitively high costs of ordering them back in 2018/2019 despite being decades old.
Though it's obvious on why Scotrail would take them as they were looking for Intercity style trains to run long distance In the region and HSTs were the only ones of the kind available.
You would say that, of course...It’s got nothing to do with attitude of the staff
Are GWR sets similarly knackered?I agree. As someone who works on them on an almost daily basis, they are knackered! Any talk of the, lasting until 2035 is just fantasy. With set failures on a daily basis requiring 2 car 158s to pick up the pieces on Intercity routes resulting in passengers left behind is just not a situation which will be tolerated moving forward. I understand there a fitters on platforms in Inverness to see out every HST departure due to the unreliability of them.
It’s got nothing to do with attitude of the staff, the sets are knackered and clearly not fit for purpose.
Not sure to be honest.Are GWR sets similarly knackered?
Maybe me, but there seems to be much more electrification going on in Scotland than there does in the rest of the UK.I have no idea whether they will take on 222s, but one very obvious possible answer to your question might be that not enough electrification is now likely to be in place on the relevant timescale to allow use of BEMUs, except in Fife.
The answer to that problem is Stadler FLIRTs with generator carriages.
Any new bi/tri mode would be based on an existing design of train, which would mean that there is not so much in the way of testing that would be required of new stock, other than testing to make sure all systems work and that all systems work in the area that the units are to be used. Other than that the only other time consuming event would be training of staff but in driving the units etc... and with doing maintenance.true, but at least the 222s are going to be available soon and will last until the wires eventually go up. It will take some time to do a procurement for any bi/tri mode stock before they can be in service, by which time the HSTs will be even more knackered than they are now, if they even last that long.
Why would I? Do you work for Scotrail? Do you have first hand knowledge of the situation?You would say that, of course...
Im not sure I understand this. It’s not the attitude towards these trains which results in them being utterly unreliable and ridiculously frequent failures, it’s the fact they’re too old and completely unfit for purpose.And there we have a big part of the problem. Attitude.