SilverTangerin
Member
Back in 2023 I remember seeing news (https://www.thetelegraphandargus.co...ended-platforms-allow-longer-trains-saltaire/) about platform extensions throughout the Airedale and Wharfdale lines to allow 6 car trains (coupled 3 car class 331) to stop at all stations.
This work has either been done or is currently taking place on most stations, however there hasn't been any news or obvious works involving saltaire in 3 years now even though it was announced to be happening.
Has anyone heard about what the potential planners or timeframe is for this station? Or is it the case this will remain either the 4 car class 333 or the class 331 with ASDO?
This work has either been done or is currently taking place on most stations, however there hasn't been any news or obvious works involving saltaire in 3 years now even though it was announced to be happening.
Has anyone heard about what the potential planners or timeframe is for this station? Or is it the case this will remain either the 4 car class 333 or the class 331 with ASDO?