Salop/Wolves 9 days of problems From tomorrow

Status
Not open for further replies.

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
WSMR diversion next week
Network Rail are carrying out essential maintenance to the railway and will be closing the line between Wolverhampton and Shrewsbury at various times from Saturday 20th November until Sunday 28th November. This means that Wrexham & Shropshire trains will be diverting via Crewe and Stafford on certain days, and train times will be changed on days where the route is still accessible but capacity is limited.

Track work at cosford,obviously same effect on ATW & LM





Seems incredible the line should be closed mid week as well as W/Ends
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Sometimes there are jobs that are too big for a weekend. Some jobs take so long to set up, and have long clear up times, that there would be no time to do the actual work.

Get real- this stuff HAS to be done.
 

mumrar

Established Member
Joined
26 Sep 2008
Messages
2,650
Location
Redditch
Problems, aren't they something that is unexpected, as opposed to planned closures?

I'm not normally so unfriendly, but have you really thought about setting up a RailCymru instead, where you and like minded individuals can whine freely about routes you give misplaced importance to?
 

Respite

Member
Joined
30 Oct 2006
Messages
765
Location
Staffordshire
It's mostly as Oxley Box is coming out then (on the 28th in theroy anyway). Salop-Wolves as an important link to wales as it is also has the Crewe diversion so not the end of the world. There is a lot of track alterations going on at Oxley, mostly to the yard I think looking at all the panels lying about there. Signalling will be controlled by West Mids SCC & our 390's will be outstabled at various places during the change over.
 

the sniper

Established Member
Joined
4 Sep 2007
Messages
3,498
Shame the Wellington to Stafford via Newport line was closed, that would have been handy in situations like this...

...our 390's will be outstabled at various places during the change over.

Do you happen to know where the 390s will be going, anywhere interesting?
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
No where interesting at all! :D Bham, Inter, Cov & Stafford are all I have been told so far.

I was going to say, P6 at Stafford is penned in to stable. I don't know if you sign into the Royal Mail line at Stafford? I know 390s are cleared into it, but seem to remember the only men who could actually put trains through there were few and far between, ie ex-BR Wolves, Crewe and Brum.
 

TDK

Established Member
Joined
19 Apr 2008
Messages
4,164
Location
Crewe
WSMR diversion next week
Network Rail are carrying out essential maintenance to the railway and will be closing the line between Wolverhampton and Shrewsbury at various times from Saturday 20th November until Sunday 28th November. This means that Wrexham & Shropshire trains will be diverting via Crewe and Stafford on certain days, and train times will be changed on days where the route is still accessible but capacity is limited.

Track work at cosford,obviously same effect on ATW & LM





Seems incredible the line should be closed mid week as well as W/Ends

No work at Cosford it is all down to the resignaling between Codsall and the South side of Stafford road Junction, there will be Temporary Block Working over the section with a headway of 20 minutes for each train and if the slots are not there for WSMR they will have to divert! It is quite a major project with the closure of Oxley SB and, yes, the line does need to be closed, when the resignalling took place between Telford and Codsall the line was closed continuously for 9 days!
 

Squaddie

Member
Joined
6 Dec 2009
Messages
1,072
Location
London
As a result of this closure, WSMR trains are taking an incredible five hours to travel between Wrexham and London this weekend, which is an average speed of about 35mph.

I have an Advance ticket that clearly states an arrival time in London of 21:27, but it now appears that my train won't arrive until 22:31. I asked WSMR if I could get a refund but they refused - as usual, if a passenger changes his travel plans he is penalised but a TOC can change a passenger's travel plans to their heart's content without penalty.
 

Respite

Member
Joined
30 Oct 2006
Messages
765
Location
Staffordshire
I was going to say, P6 at Stafford is penned in to stable. I don't know if you sign into the Royal Mail line at Stafford? I know 390s are cleared into it, but seem to remember the only men who could actually put trains through there were few and far between, ie ex-BR Wolves, Crewe and Brum.
Yep sign all the roads including the ex RES one. I have actually been in there before now with one of the ECS Euston to Central Rivers Via Stafford moves.
 

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
Anyone noticed tomorrows 19xx Marylebone-Wrexham skip is booked down the Trent Valley as a result of this, RA Marylebone-Crewe?! Most interesting service train down there route since 87010 10/06/05??!
 