That won't be easy as I believe the land was sold.The loop at Tisbury needs to be extended through the station with a restored second platform.
That won't be easy as I believe the land was sold.The loop at Tisbury needs to be extended through the station with a restored second platform.
That won't be easy as I believe the land was sold.
Typical short sightedness of politicans at all levels in this country if this is true, also if it hasn't happened in this case.
I cant see why they dont extend the services from waterloo-exeter to paignton and plymouth?
I cant see why they dont extend the services from waterloo-exeter to paignton and plymouth?
I cant see why they dont extend the services from waterloo-exeter to paignton and plymouth?

Just to clarify a couple of my points from earlier:
1) I gave the 2 hour 35 mins example to demonstrate the optimum service that would be possible. Obviously intermediate stops should be made at stations like Gillingham Yeovil and Honiton for example as they have high passenger numbers.
2) Reinstating the down platform at Tisbury is easily solved by a useful thing called a compulsory purchase order.
3) My petition now stands at 108 signatures and counting. Not that impressive untill you consider that 3 weeks ago the count was just 33 signatures. I have done a little publicising on Facebook and the numbers have shot up. So the desire for change is out there and I have been much encouraged by this.
4) I hope everyone had a very good Christmas and will have a great 2012![]()
2) Reinstating the down platform at Tisbury is easily solved by a useful thing called a compulsory purchase order.
IIRC when the land was sold off, a clause was put into the sale agreement saying that it wouldnt be possible to buy it back even with a compulsory purchase order.
I have read it somewhere, but I cant find the article again.
I suspect that to enable double track through the station again, that the out of use platform edge will need to be moved back as per what happened at Axminster when that was re-doubled.
Avoiding expensive reconstruction of the M5 single track bridge could be achieved by recommencing double track immediately to the east of the bridge. This would only leave a short piece of single track to negotiate between Pinhoe and the M5 bridge.
That is so typically short sighted by our Government Planners, replacing or building a bridge with only space for a single track to go through, especially over a line that was double track.
There are none so blind as those that will not see. That is true in spades for transport planners all over the country.
The annoying thing abot redoubling the Pinhoe to Axminster stretch is that it would be remarkably easy to do (in terms of major infrastructure projects) - the bridges, embankments and even the second platform at Feniton are all still there ready and waiting for some track. The biggest costs would come with signalling (obviously), rebuilding the level crossings at Crannaford and Feniton, and most annoyingly rebuilding the M5 bridge, as it is only big enough for one track. That alone will cause massive disruption for both road and rail and cost a bomb, and I suspect is one reason why the redoubling hasn't been done already.
I havent been down that way for a couple of years but the former Up line was till then still in situ for 4 or 5 miles where it was used as access to the MOD base at Dinton a couple of miles north of Tisbury. Ive always thought that this would be a relatively cheap dynamic loop if relaid and extended to the existing loop at Tisbury.
I may be wrong but I am 99% sure that if network rail wishes to redouble through here then the highways agency is obliged to reconstruct the M5 bridge at their own expense as the abutments are built on railway land. In fact I believe I read somewhere that they will be more than happy to do so when required.
For Tisbury, could they not adopt the method used at Penryn station on the Falmouth Docks/Maritime Line?
http://en.wikipedia.org/wiki/File:Penryn_track_diagram_2009.png
I may be wrong but I am 99% sure that if network rail wishes to redouble through here then the highways agency is obliged to reconstruct the M5 bridge at their own expense as the abutments are built on railway land. In fact I believe I read somewhere that they will be more than happy to do so when required.
Malton is another station which operates with 1 platform on a double track route.
I may be wrong but I am 99% sure that if network rail wishes to redouble through here then the highways agency is obliged to reconstruct the M5 bridge at their own expense as the abutments are built on railway land. In fact I believe I read somewhere that they will be more than happy to do so when required.