• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Salisbury Platform 1

Status
Not open for further replies.

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,778
Location
Cambridge
This always fascinates me every time I see it.

Can anyone share information on when it was last used in service, why it isn't now, and could it be in the future?

I saw there was another discussion on Salisbury station and it made me remember it.

TY :)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,295
Location
Glasgow
This always fascinates me every time I see it.

Can anyone share information on when it was last used in service, why it isn't now, and could it be in the future?

I saw there was another discussion on Salisbury station and it made me remember it.

TY :)
I'm sure someone will correct me on this, but I believe it hasn't been used by regular passenger workings since the Salisbury resignalling in about 1981.

That resignalling made the layout more flexible and the platform was surplus to needs at the time and was not equipped with track circuiting during the resignalling.

I believe it is used to stable trains in though and for ECS movements.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,778
Location
Cambridge
I'm sure someone will correct me on this, but I believe it hasn't been used by regular passenger workings since the Salisbury resignalling in about 1981.

That resignalling made the layout more flexible and the platform was surplus to needs at the time and was not equipped with track circuiting during the resignalling.

I believe it is used to stable trains in though and for ECS movements.
It's in rather good condition then if it hasn't been used since 1981. Battersea Park's Platform 1 has only been disused for a maximum of ten years, and that's in a right state.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,629
Location
Hampshire
I'm sure someone will correct me on this, but I believe it hasn't been used by regular passenger workings since the Salisbury resignalling in about 1981.

That resignalling made the layout more flexible and the platform was surplus to needs at the time and was not equipped with track circuiting during the resignalling.

I believe it is used to stable trains in though and for ECS movements.
It is also the only access road in and out of the depot - quite surprising that it's lasted this long, and must mean it takes quite a few shunts across the station approaches to get stock in and out of the place.

I'm surprised no plans for it's re-opening have come up yet - surely, with more services using or passing through the station, you could perhaps use it as the London bound platform, while using the inners for Terminating or Southampton / Portsmouth bound services (excluding the Salisbury 6 / Romsey Rounder as it uses it's own platform).
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,778
Location
Cambridge
There's also a west facing bay at the other end of the down platform isn't there, which I believe can't be used in passenger service either?
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,295
Location
Glasgow
It's in rather good condition then if it hasn't been used since 1981. Battersea Park's Platform 1 has only been disused for a maximum of ten years, and that's in a right state.
Only disused in the sense of no passenger calls, trains do use the 'road' through the platform.
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
12,962
Location
Up the creek
Although this part of the South Western station doesn’t have a preservation order on it, the GWR one does and so there may be development restrictions. The line is also be used for trains coming out of the depot to reverse before going west and v.v., so possibly requiring train crew to change ends.
 

HamworthyGoods

Established Member
Joined
15 Jan 2019
Messages
4,476
It's in rather good condition then if it hasn't been used since 1981. Battersea Park's Platform 1 has only been disused for a maximum of ten years, and that's in a right state.

Platform 1 at Salisbury is only disused as a passenger platform. It’s very much still in use as a staff platform. Plenty of attachments/detachments and train crew relief takes place there.

== Doublepost prevention - post automatically merged: ==

There's also a west facing bay at the other end of the down platform isn't there, which I believe can't be used in passenger service either?

Yes bay platform 5 which only has a subsidiary starting signal so can’t be used for passenger services.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,778
Location
Cambridge
Platform 1 at Salisbury is only disused as a passenger platform. It’s very much still in use as a staff platform. Plenty of attachments/detachments and train crew relief takes place there.

== Doublepost prevention - post automatically merged: ==



Yes bay platform 5 which only has a subsidiary starting signal so can’t be used for passenger services.
Thank you for the information. Is the subsidiary starting signal the same as what stops Southampton Central's bay being in use?
 

pompeyfan

Established Member
Joined
24 Jan 2012
Messages
4,445
Thank you for the information. Is the subsidiary starting signal the same as what stops Southampton Central's bay being in use?

Confusingly though, subsidiary signals are regularly used as starting signals across the SWR network during disruption, Haslemere, Petersfield and Brockenhurst to name but 3.
 
Status
Not open for further replies.

Top