In the latest Rail magazine (Issue 1052 dated 7 Jan, page 8) the normally well-informed Paul Clifton states:
I was under the impression that the line had been resignalled around 2012/3 with control being from Basingstoke ROC. If I'm correct, why would resignalling be required again after a fairly short period?
Can anyone clarify, many thanks.
Plans to upgrade the West of England route had previously included discontinuous third-rail electrification west of Basingstoke, and potentially using spare Class 450's or even amended Class 701 Arterios. The ideas were linked to the need to replace signalling on the route around 2030 and an upgrade to the Salisbury depot, which was built in the 1980's specifically to service the Class 159 fleet.
I was under the impression that the line had been resignalled around 2012/3 with control being from Basingstoke ROC. If I'm correct, why would resignalling be required again after a fairly short period?
Can anyone clarify, many thanks.