theageofthetra
Established Member
There is a debate over on District Dave about the EOR running a preserved tube unit (with a pair of diesels push/pulling) later this year. Now given that given the cost/safety of re electrifying a preserved line -especially 3rd/4th rail is simply not viable what are the alternatives? Hopefully someone who understands the electro-mechanics of it far better than me could advise. How viable would it be for say the various electric preservation groups to band together and fit a modern, efficient, compact and quiet gen set in the underframe or luggage areas and power a unit that way? Given the low speeds on most heritage lines would that much power be needed? The tram/trains on part of the Harz system have a small gen set which is used on part of the route and it looks the size of a small car engine and manages ok.I know the purists won't like it but it would give them far more options to run their stock. Perhaps this could also be done with heritage tube stock, blank off part of the coach, black out a couple of windows, would it really look too bad? Another option for the SR groups is to band together and convert a similar looking trailer or van to fit in any of their units and allow it to be shared and run. I am sure there are quite a few barriers to overcome but as time goes on there will be more demand for heritage electric to appear and perhaps this is one solution?
Last edited: