What are the arrangements for an RRV (360 excavator) to be able to on track and then work with the adjacent line open at line speed??
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Dolive22

Member
Joined
20 Dec 2009
Messages
464
This is one of those slightly unsettling questions. Please say you're not asking professionally.

Old Timer should be along to answer soon, he will know.
 

Ploughman

Established Member
Joined
15 Jan 2010
Messages
3,099
Location
Near where the 3 ridings meet
And after all that it can all depend on what the local Network manager wants you to do.
We had the case that no machine could work within full boom length plus 6 metre of the nearest track open to traffic even though limiters and slew pins were fitted and operational.
Because a homicidal operator could shear the pin.
What do you do in that situation?
 