Kris

Member
Joined
14 Feb 2007
Messages
565
i agree with 87015 i would like to see the bletchley - oxford line reopen, only last year they reopened the flyover and branch to fenny stratford, only for freight but its a start, part off the reason for the new bay at mk is for this if it ever happens, plus i iirc it could be used by freight as a short cut to get down towards soton quicker, reliving the lines around london.

You should put that forward to Freightliner - might give it the momentum to get something done. May also be an option for the bigger containers and suitable routes which they are looking into.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

16CSVT2700

Established Member
Joined
4 Sep 2005
Messages
1,837
Location
Gdansk
Oxford-Bletchley and the Great Central London Extension.

Demolish the Victoria shopping centre in Nottingham and rebuild Notts Victoria!
And I don't care what my lady friends say! :lol:
 

Techniquest

Veteran Member
Joined
19 Jun 2005
Messages
21,830
Location
Nowhere Heath
Out of every line there is, I'd vote for New Radnor - Leominster, what with it being my local line. 52 years since the last train this way, which is a great shame. Would be nice to travel to work on a train (even if it was a 153) than a bus! Obviously though, services would have to run onwards to Hereford to really give the bus operators a run for their money. Could still be done inside 40 minutes, saving an absolute minimum of 20 minutes (40 or possibly even more on the commuter runs) on Kington - Hereford.

Never going to happen though. I can always dream...

More realistically in terms of line openings, I'd certainly like to see Oxford - Bletchley re-opened. Do it right and offer decent connections and you could really alter some of the markets out there. Would certainly be easier from places near here to get to that area of the country! Only options currently involve going up north to Birmingham then off on Virgin or CT/SL for Bletchley, or go via London. For Bedford, you're looking at going up to Birmingham still, CT to Leicester and MML south to Bedford. Or you could go via London. In both cases, this route would eliminate any need for such journeys to go via London, taking some congestion away. Mind, there are not many direct trains from Hereford to Oxford (and those that are there are extremely unreliable), so even then a journey via Newport and London is still appealing.

Most useful 're-opening' to me would be the re-instatement of the double-track sections between Shelwick Junction and Malvern Wells, Norton Junction and Moreton-in-Marsh and Ascott-under-Wychwood and Wolvercot Junction. This would enable services to run much, much more reliably and would open the market for enhanced services on this route (which are well deserved for what is, in all essence, an InterCity route but never treated as one, only as a back-water).

Still, that will never happen either. Why? Because it's not in London, it's not in Wales and it's not in Scotland. If it fell under any of those areas, it would have been done years ago. But no. We will forever be cursed with a most useless InterCity route, with a more-than-useless InterCity service that's so unreliable you just don't go that way or you jump in the car instead.
 

Crompton Karl

Member
Joined
14 Apr 2007
Messages
404
Location
Kent
If it was ever possible i'd like to see the Lincolnshire coast route through Mablethorpe re-open. Such a shame that such a big county lost this route. if you wanna go from Boston or Skeggy to Grimsby its a very long way round.

Karl :)
 

Kris

Member
Joined
14 Feb 2007
Messages
565
The £200 million Milton Keynes and Bletchley project will increase capacity and improve rail links into the growing town. The planned improvements include a third fast line and platform, which will enable consecutive trains to call at Milton Keynes during peak times with reduced effect on line capacity, a new platform capable of handling future services to and from Bedford and
possibly, in the future, trains from Oxford or Aylesbury and improved reversing facilities for slow line trains.

Railway Herald 20th April
 

Nick W

Established Member
Joined
5 Nov 2005
Messages
1,436
Location
Cambridge
The £200 million Milton Keynes and Bletchley project will increase capacity and improve rail links into the growing town. The planned improvements include a third fast line and platform, which will enable consecutive trains to call at Milton Keynes during peak times with reduced effect on line capacity, a new platform capable of handling future services to and from Bedford and
possibly, in the future, trains from Oxford or Aylesbury and improved reversing facilities for slow line trains.

Railway Herald 20th April

Am I misunderstanding it or isn't it a third up and down slow line on the east side that would be most useful for trains from oxford or aylesbury?
 

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
21,171
Location
0035
The problem I see with option B, wouldn't that mean there would be no trains Aylesbury - MK, which is really what's needed?

Also, does anyone know about the plans to build a platform somewhere at Bletchley to allow any possible services from the line from Winslow to call there?

I also remember some plans from Chiltern Railways a few years ago, which suggested a cheaper option, building a chord between the Chiltern Line and the line which leads to Bicester Town, to enable some direct services to Oxford.

It's a shame though it won't be any easier to do Aylesbury to Oxford.
 

class 313

Established Member
Joined
10 Dec 2005
Messages
6,475
Location
St Albans
St Albans Abbey - Hatfield...

But also, not strictly a "Re-open" but new line...

Watford - St Albans city via Radlett with the new Freight site put in place.
 

westcoaster

Established Member
Joined
4 Dec 2006
Messages
4,493
Location
DTOS A or B
Also, does anyone know about the plans to build a platform somewhere at Bletchley to allow any possible services from the line from Winslow to call there?

prep work is and has been under way for a platform to be built on the flyover with a bridge to come down to platform 1 (df line), this means 1 line to be taken up , and the other made bi-directional.
 

The Snap

Established Member
Joined
10 Jun 2005
Messages
3,156
Not so much a line, but I'd love to see Droylsden station re-built. It was demolished years ago, and now there are no stops between Ashton and Manchester Victoria, meaning the line passes through several towns without even stopping!

The re-opening of the station would take pressure off the roads for sure, and would also mean people could get into town or to Ashton much, much easier!

It was suggested it was re-opened instead of doing the Metrolink extension, but I think that's gone down the s***ter.
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
Oxford - Bletchley is pencilled in for re-opening (awaiting funding).

The study report, which concludes it has a positive business case is here

http://www.eastwestrail.org.uk/downloads/Atkins_east_west_transport_links_report_Mar06.pdf

The more interesting report discussing the options for track plans and train services is here

http://www.eastwestrail.org.uk/reports/documents/GRIPStage2Report.pdf

“Option A” – Base Case plus 2tph Aylesbury to Milton Keynes (Cost: Base Case +£64m)

double track from Aylesbury to Calvert South
double track from Verney Junction to Swanbourne
double track from Summit Junction to Denbigh Hall South Junction
single track elsewhere

“Option B” – Base Case plus 2tph Aylesbury to Bedford (Cost: Base Case +£64m)

same infrastructure requirements as for Option A
Hybrid “Option C” – Amended option A service pattern (Cost: Base Cost +£64m)
same infrastructure requirements as for Option A
W10 Gauge Freight Enhancement- (Cost: Base Case +£152m)
provides of 1 freight train per hour in addition to the “Base Case” option.
extra track Denbigh Hall South Junction - Milton Keynes Central.
double track throughout core East West Rail route, except through Wolvercot Tunnel where single track is retained.

100mph Inter-regional Cross Country - (Cost: Base Case +£98m)

reinstate chord at Bletchley to connect into WCML Down Fast line.
double track throughout core East West Rail route.
requires further timetabling work to prove suitable paths can be established.

EWplan.jpg


The great central (including woodhead) has several re-opening schemes including here

http://www.central-railway.co.uk/

and here

http://www.translinkuk.com/index.html

and has been discussed several times with several TOC, including Chiltern and Arriva.

Whilst i dont wish to be seen as negative there seems to me to be a huge difference between the cost quoted in these reports and similar projects that are happening elsewhere on network rail.

dial in the network rail costs and none of these re openings makes any sense whatsoever.
 

Kris

Member
Joined
14 Feb 2007
Messages
565
Previously mentioned elsewhere is that builders of housing estates adjacent to lines that could be re-opened could be asked to put 10% on the pice of each house to aid towards re-building.

As for freight diversions - this is cost effective as it clears pathways for other trains.
 

Western Dreamer

New Member
Joined
28 Mar 2007
Messages
2
A SW point of view:

As a preservation line:
1) Helston-Gwinear Road branch - my local disused line and one which is currently the subject of a preservation project. Fingers crossed because it would make a great heritage line
2) Wadebridge-Bodmin 3rd oldest line in the world & Cornwall's first railway.

As a 'regular' line:
Okehampton-Bere Alston , thus restoring the LSWR main line between Plymouth & Exeter, with a branch to Launceston.
 

Craig

Established Member
Joined
15 Jun 2005
Messages
3,958
Location
Newcastle
Rebuilding the link between the Tyne Valley and Low Fell (shown on this map - left hand side of the triangle) would be very useful for freight trains into Tyne Yard, as they wouldn't have to block the ECML. Also anything from the Sunderland direction into Tyne (i.e. the oil trains to/from Jarrow) would avoid the ECML completely.

Bensham station should also be rebuild with all ECML trains stopping there (it's just across the road from my house ;)).
 

eezypeazy

Member
Joined
4 Jul 2005
Messages
626
Location
UK
Craig,

Did you mean the RIGHT hand side of the SMALL triangle... ie., from just above HOSPL , over Lobley Hill Road to join the Tyne Valley line, facing east, just west of Bensham?

Agreed - a relatively short bit of line, just one bridge to maintain, and Tyne Yard to Jarrow/Sunderland avoiding ECML.... very sensible...


eezypeazy
 

Craig

Established Member
Joined
15 Jun 2005
Messages
3,958
Location
Newcastle
Craig,

Did you mean the RIGHT hand side of the SMALL triangle... ie., from just above HOSPL , over Lobley Hill Road to join the Tyne Valley line, facing east, just west of Bensham?
Yep, that's the one. I meant to the left of the larger (Tyne Valley/ECML) triangle.

Agreed - a relatively short bit of line, just one bridge to maintain, and Tyne Yard to Jarrow/Sunderland avoiding ECML.... very sensible...
Also useful for freight from the north. They could come off the ECML at Heaton then go "round the back" at Newcastle and on to Tyne Yard. I'm not sure what state the bridge is in, it looks alright though.

Any idea when the track was lifted?
 

eezypeazy

Member
Joined
4 Jul 2005
Messages
626
Location
UK
I'd guess that the track was lifted as part of a rationalisation when the ECML and the line to the Royal Mail Sorting Office were electrified....

Is there enough clearance in Bensham tunnels to permit this route to be electrified? Is there any/enough electric frieght on ECML to justify this?

eezypeazy
 

andersley

Member
Joined
17 Apr 2007
Messages
25
Spalding-March. This is the missing link on the 'Joint' which would be an excellent diversionary route for ECML freights.
 

Craig

Established Member
Joined
15 Jun 2005
Messages
3,958
Location
Newcastle
I'd guess that the track was lifted as part of a rationalisation when the ECML and the line to the Royal Mail Sorting Office were electrified....

Is there enough clearance in Bensham tunnels to permit this route to be electrified? Is there any/enough electric frieght on ECML to justify this?

eezypeazy
It's a shame I'm not quite old enough, to remember the ECML rationalisation properly. Not sure about clearance in the tunnels, but there's not much electric freight traffic anyway. Just a couple of intermodels/car trains to Scotland and the odd diverted Freightliner.

The line could also be electrified to the Metro Centre (or even Blaydon if a crossover was built) if Northern could acquire a few EMU's to run up to Morpeth or somewhere.
 

andersley

Member
Joined
17 Apr 2007
Messages
25
Trouble is there is now a high security prison and Network Rail yard on the Whitemoor end, and a large house across the track as it exits Spalding. :(

I bet they wished it had been mothballed, instead of ripped up!
 

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
21,171
Location
0035
When many lines were closed down, especially those around Beeching, they purposely sold off the land. The cynics amongst us said this was the case to stop any future re-opening which would show such a closure wouldn't have been necessary.

When the line from Taunton - Minehead was closed, BR was quite clear that it shouldn't be sold to the preservation group. At the time they felt that it wasn't just a group of men 'playing trains,' but an attempt to run a train service proper. There were also issues with bus services & the unions.
 

Nick W

Established Member
Joined
5 Nov 2005
Messages
1,436
Location
Cambridge
Yes some land was purposely sold off, however a lot remains and few people know we are still paying for upkeep of land, viaducts and tunnels - all 4000 of them even after they have long stopped carrying freight and passengers.

http://www.brb.gov.uk/

But not the GCR one in rugby :(


The Conservatives have already said capacity must be boosted on the busiest commuter routes - but from within the existing budget.
All talk, no do...

To be fair, I'd rather see the current lines done up before we introduce new lines.
 

paul1609

Established Member
Joined
28 Jan 2006
Messages
7,992
Location
K
Whilst a flyover at Hitchin would probably be good from an operations point of view the fact is that both the ECML and WCML are lightly used lines in the context of the lines South of London. If you reduced max speed to 100 mph on the ECML south of Peterborough you would make available another 6 paths an hour at the cost of a few minutes delay for intercity trains.

To my mind Thameslink 200x should have priority over all of Transport 2000s plans
 