Not sure if this is the right area for such a question.

Obviously drivers and guards have to learn a route before operating on it on their own. A new platform has opened at Reading station recently. (platform 4) Now, would all train crew have to learn this new platform first, or would they just get a notice about it?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

GB

Established Member
Joined
16 Nov 2008
Messages
6,549
Location
Somewhere
I imagine they would get a train crew brief and walkaround.
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,556
Relatively minor changes such as a new platform would, in my experience be dealt with in a brief to crews along with the company route maps and sectional appendix being updated accordingly. Major changes would be dealt with in a notice often known as a yellow peril (signalling alterations notice).
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,229
In the case of something like the new P4 at Reading, all the train crew will have been watching it develop for the last 9 months as well, and especially from the perspective of a driver it will have been pretty obvious how the layout would work for some months now, so it isn't as though anything is unexpected.
 

Cherry_Picker

Established Member
Joined
18 Apr 2011
Messages
2,825
Location
Birmingham
We got a brief and maps (informally known as a "yellow peril") about the new platforms at Moor Street when they opened last year. Ditto for Marylebone when that got new platforms in '06. For large resignalling projects we tend to get DVDs which have been digitally altered to show the position of new signals or have CGI simulations for new routes such as junctions or through roads.
 

MggW

Member
Joined
23 Aug 2010
Messages
25
The Reading work in readiness for Crossrail has involved a lot more than a simple platform, with track and signalling work at eslewhere including Acton.

NR issued a yellow peril and briefing for this work.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,631
I have no doubt the TOCs would have put a claim in for learning the new platform regardless of what was really needed under the Network Change arrangements.
 

wensley

Established Member
Joined
29 Jun 2008
Messages
2,045
Location
On a train...somewhere!
Recent signalling changes to York Platform 9/10 including re-positioning of the Down Starting Signals and installations of Banner Repeater Signals for Down trains. I did have to laugh at one guard frantically looking for the old "OFF" indicator only to turn and see a dirty great green aspect ... oops :oops:
 

Cherry_Picker

Established Member
Joined
18 Apr 2011
Messages
2,825
Location
Birmingham
I have no doubt the TOC's train crew will have insisted on a day's training for learning the new platform regardless of what was really needed too. These things happen in a world with litigation.
 

Smudger105e

Member
Joined
5 Jan 2010
Messages
1,012
Location
N 52° 53.492 W 001° 15.493
I have no doubt the TOC's train crew will have insisted on a day's training for learning the new platform regardless of what was really needed too. These things happen in a world with litigation.

I'm not sure the Train Crew are in any poisition to insist on this. Surely the Trades Unions (largely ASLE&F but also RMT) would liaise with the TOCs and come to agreement regarding training requirements? A simple platform introduction would not need more than a short brief IMHO.
 

Cherry_Picker

Established Member
Joined
18 Apr 2011
Messages
2,825
Location
Birmingham
ASLEF (and RMT) are train crew though. We can ask our representatives to negotiate adequate training for the new infrastructure were are expected to work over. It can be incorporated into existing rostered safety briefs or a new brief can be created which train crew may need to be released from their booked duties in order to attend. So yes, we are in a position to insist on it.
 

O L Leigh

Established Member
Joined
20 Jan 2006
Messages
5,609
Location
In the cab with the paper
We've just had P7 & 8 open at Cambridge. We were issued with a Yellow Peril and signalling diagrams and offered a payment in compensation for familiarisation of the changes in our own time. There was an option to go down an see for ourselves, but these had to be requested and meant forfeiting the payment.

Learning the new platforms also requires familiarisation with the new signal indications, stop board locations and shunt moves. At Cambridge it also covered the alterations to the Reception Roads.

O L Leigh
 