SkinnyDave
Established Member
- Joined
- 11 Mar 2012
- Messages
- 1,242
Anyone heard of what the plan is for rolling stock for electrification of Glasgow to Edinburgh?
380s?
380s?
Friends from ScotRail have suggested that roughly 17-18 new build Class 380 units are being proposed for the service. 4 car composition and hopefully an interior layout similar to the current Turbostars.
Given that the vast majority of time the units will be operating in a fixed 8 car formation...
Would it not be more sensible just to order a dozen 8 car units for Edinburgh-Glasgow?
Given that the vast majority of time the units will be operating in a fixed 8 car formation...
Would it not be more sensible just to order a dozen 8 car units for Edinburgh-Glasgow?
I suggest not on the grounds of flexibility.
A fault on one vehicle of an eight car unit takes out eight vehicles.
Then there is the long term thinking (Whole life costs etc.), they might get cascaded to other routes/operators in the future.
Same reason Crossrail stock will be 2x5 cars rather than fixed 10 cars.
Same reason Crossrail stock will be 2x5 cars rather than fixed 10 cars.
It would be nice and easy to just order a batch of 380s, but will design regs not have advanced by the time these units will need to be ordered? And AFAIK the 380 was mid way between the present design (350s et al) and the next generation family of EMUs?
380 used the next generation Desiro City body so no problems there.
Maybe so, but the next generation desiro might not use exactly the same electrical architecture as the 380s have.
and would also mean the drivers would get full width cabs with no potentially drafty connector!
Yes please!!!!![]()
You really want to put what amounts to tube stock on Edinburgh-Glasgow?
So you are suggesting every vehicle should have a pantograph, transformer, inverters, every one be powered, all have a compressor etc etc so you can just pull one out? Not only would it cost a fortune it would weigh so much it probably wouldn't move!
Won't the rolling stock deal have to be open tender?
Unless there is a reason for close compatibility with 380s (eg for maintenance) then the contract could go to anybody.
And Siemens might not bid a 380.
How much will the journey differ in comparison to Reading-Liverpool Street?
A mix of 3 & 4 car EMUs is the right solution for the E&G services, not single 7 or 8 car sets, given that off peak service don't warrant carting around a load of fresh air.
The obvious outcome would probably be another batch of 380s, although the public tendering process might result in something else.
As for Reading-Liverpool St, even if Crossrail is extended that far very few people would use it for such a journey - most people would take a faster service and change at Paddington.
Wouldn't it be easier to standardise on 4-car EMUs to make a uniform fleet - or are there a large number of stations that can only take 3 or 6 cars?A mix of 3 & 4 car EMUs...
Didn't Southern specify compatibility with their existing fleet for the 5-car 377's? It pretty much guaranteed a Bombardier order, so presumably ScotRail could do the same if they're happy with further 380's.
Chris
Won't the rolling stock deal have to be open tender?
Unless there is a reason for close compatibility with 380s (eg for maintenance) then the contract could go to anybody.
And Siemens might not bid a 380.
The London builds (Thameslink and Crossrail) will have a lot of special gear for automatic operation and tunnel working, so might not be suitable for E-G.
If new EMUs are bought for Great Western services that might be a more suitable starting point for Scotrail.
Currently nothing much is happening because of the Thameslink order problems and franchise renewal standoff.
Wouldn't it be easier to standardise on 4-car EMUs to make a uniform fleet - or are there a large number of stations that can only take 3 or 6 cars?