I think what he is trying to say is;
"I would put the electrification and speed increases of the MML as a priority above any other line and then increase linespeed on the GEML".

think you're trying to say that electrification and speed increase of the MML should come first, and then increase the speed of the Great Eastern

You shouldn't put a comma before 'and'.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

scb201

Member
Joined
9 Dec 2006
Messages
52
It's actually called the oxford coma, and not technically wrong. Sorry couldn't resist.
 

me123

Established Member
Joined
9 Jul 2007
Messages
8,510
The Oxford Coma?

coma-a.jpg
 

GNERman

Established Member
Joined
8 Oct 2008
Messages
1,595
Location
North Yorkshire
I think that the Leeds-York route should be electrified because this would bring in more services. This could allow Skipton-York services with 333's and this would work well as the Aire Valley is currently stopped at Leeds apart from the daily SKipton-London service. This could also allow NXEC to run more services north of Leeds to Edinburgh or Glasgow. The only daily NXEC train north of Leeds is the 7.10 train to Aberdeen and the only reason for that is to get an extra HST to Aberdeen.
Thsi should also lead to the electrification of the line to Liverpool. This would mean that the Newcastle-Liverpool TPE service could be all electric and possible electrification to Scarboroughfor all electric east of Manchester. Just one quaestion though-Can electric trains run from Manchester Airport to Edinburgh/Glasgow and if yes why isn't this happening?
Another electrification scheme I can think of would be Skipton-Lancaster as this lead to an extra electrified East-West Coast electrified route. This could also allow extra services to Carlisle and Glasgow and an extra diversion
 

me123

Established Member
Joined
9 Jul 2007
Messages
8,510
AFAIK, there aren't any lines between Preston and Manchester which are electrified. Certainly, the normal route isn't, and it isn't via Wigan either. The big one with diesel trains running under wires is Glasgow/Edinburgh-Birmingham, mostly because it used to be part of the CrossCountry route.

As you say, one of the big flaws in the rail network, IMO, is the Glasgow services. Not many down the East and very few to Leeds, Sheffield, even Manchester(!). I think there'd be a market for a few more services to, say, Leeds via Carlisle and Settle, (which could continue daily to Hull to connect with the ferries). Summer services to Blackpool are easy with a reversal at Preston. TPE could run to Sheffield by extending Manchester services.

Just a few suggestions; of course I'm not suggesting an hourly Glasgow-Leeds shuttle, but i think some services would be both useful and profitable.
 

Waverley125

Member
Joined
2 Sep 2008
Messages
1,010
Location
Leeds, West Yorkshire
I don't see any reason why Northern couldn't extend the 6 trains a day over the S&C into Glasgow Central, calling at Lockerbie, Carstairs and Motherwell. Leeds-Nottingham is another missing service which would run via Wakefield, Rotherham, Sheffield & the MML.

Electrifying around leeds would be a very good idea, including the Huddersfield, Harrogate and Caldervale lines (only to Huddersfield via Halifax & Brighouse in the case of the latter). This could free up space at leeds by running through services to Harrogate, Skipton & Bradford more frequently.
 

Bayum

Established Member
Joined
21 Mar 2008
Messages
3,270
Location
Leeds
The idea of running more services north of Leeds though - isn't it already quite congested there anyways??

So with more trains, it would be a lot more congested.

Electrification of the Harrogate Line would be a good idea, but I dont see the reasoning in electrifying the Halifax line, and plus - trains would have to come over the tracks into Leeds, to reverse out of Leeds to get to Halifax (from Bradford) and vice versa, causing more congestion
 

Waverley125

Member
Joined
2 Sep 2008
Messages
1,010
Location
Leeds, West Yorkshire
no. Trains from Halifax reverse at Bradford interchage on the Caldervale. Electrifying this & down to Huddersfield via Briggate would create a 'Huddersfield loop'. The Hambleton curve is congested and it needs expansion to 4 tracks all the way from leeds city centre.
 

GB

Established Member
Joined
16 Nov 2008
Messages
6,549
Location
Somewhere
A better idea would be to wire up the Felixstowe branch for freight to remove the need for traction changeovers at Ipswich. Wiring up from Haughley Junction (GEML) to Peterborough might be an idea to allow electrically hauled freight to hit the ECML without having to go into London, but the available options for diversions on XC passenger services would almost completely preclude electrically operated services.

I think the push should really be for electrically hauled freight services and extensions to existing schemes. It strikes me that the MML and GWML are prime candidates for further electrification, as is the Felixstowe branch (even if only for freight). The Hull branch also seems like a good option.

That will never happen as its not practical. There is no way you can have OHL into a terminal such as Felixstowe and there is zero room to facilitate any kind of loco swaps there.

I do agree though that the Ipswich-Bury-Peterborough line should be considered for electrification.
--- old post above --- --- new post below ---
I gotta say the OHLE south of chelmsford as vintage and charming as it is really needs replacing seen as though it is converted DC OHLE.

There is already a scheme in place for that and was started I think last year when LST was closed for just over a week.
 

Max

Forum Staff
Staff Member
Administrator
Joined
8 Jun 2005
Messages
5,468
Location
Cambridge
I don't see any reason why Northern couldn't extend the 6 trains a day over the S&C into Glasgow Central, calling at Lockerbie, Carstairs and Motherwell.

Some used to extend to Glasgow when Northern was part of Arriva Trains Northern. However, it was pulled because Virgin complained about possible conflicts with it's own service and the potential for poorer reliability on the part of 156s/158s, which could negatively impact on express trains.
 

Bill EWS

Member
Joined
10 Feb 2006
Messages
673
Location
Didcot
I don't underdstand the comments about not having OHL into a terminal such as Felixstow! There has been numerous schemes where OHL runs into a site but with a diesel shunter hauling the train to it's terminal point. the wires don't have to go right up to the boats.

There was also DC OHL used on the southern, near Hither Green, where the third rail wasn't allowed to go into the goods sidings. Never say NO!
 

Waverley125

Member
Joined
2 Sep 2008
Messages
1,010
Location
Leeds, West Yorkshire
article in RAIL magazine said that a lot of freight operators can't be bothered with the hassle of uncoupling an electric loco and putting a diesel one on the front at both ends, so will just use a diesel locomotive all the way through. Felixstowe, Grangemouth etc. all need to be fully wired before EWS, Freightliner etc. will start making full use of the available electric locos.
 

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
article in RAIL magazine said that a lot of freight operators can't be bothered with the hassle of uncoupling an electric loco and putting a diesel one on the front at both ends, so will just use a diesel locomotive all the way through. Felixstowe, Grangemouth etc. all need to be fully wired before EWS, Freightliner etc. will start making full use of the available electric locos.

Which can never happen - exactly how are you going to electrify a freightliner terminal, MGR loading point of whatever?
 
Status