How's it not Northern's fault? They "manage" Rochdale station, don't they? Whatever happened, or didn't, must be foreseeable?
I'm not sure that I'd regard a random power cut as 'foreseeable'. Do you get up an hour early every morning in case your house is experiencing a power cut (no heating, light on winter mornings, electric shower or breakfast that you might be used to) or the car won't start, or that your route to work is blocked by an incident, flooding or whatever?
Fully aware of that, you do not need to explain it to me.
It is easy for anyone to forfeit the time, even people working in time critical jobs. Everyone is human!
This was brought home to me in my very first supervisory job. I was booked on a Monday morning, after a weekend shutdown on the line, with heavy snow already falling on the Sunday evening. Prudently (I thought) I got up very early and after de-icing my car and driving very gingerly to work arrived an hour early.
First problem - wages grade staff with keys unable to get to work because of snow. Premises still locked. Forced an entry. (Did make sure that I had my own keys later.)
Second problem - office flooded by burst pipe. Glad I had brought my toolbox and managed to turn water off.
Third problem - nearby signaller frantically buzzes me on the circuit phone to say that they have dropped a light engine on the deck having hand signalled it back over some points that were still 'standing off' because of snow. For the very first time 'in anger', grabbed single line working forms, pilotman's arm band and so on and headed to relevant (different) signalbox to institute Single Line Working. First train already 'standing' awaiting developments.
Fourth problem - said signalbox unstaffed as signaller unable to get into work because of the snow. Praise be that an 'old school' Relief Signaller immediately turned up on own initiative despite being booked on a late turn because they had realised that there may be problems that morning.
Fifth problem - because signalbox had been switched out over the weekend all the signals were frozen 'off' even after the levers were returned in the frame. Grab coal hammer walk along the wire runs hammering the pulleys and proceed to climb the signal posts, including distants in the snow get the arms back to danger. Having done this proceeded to institute Single Line Working as both Responsible Officer and pilotman. Spend rest of shift as pilotman until the breakdown vans had been out and re-railed the light engine. Get back to office, write up Mishap Report for the derailment, write up report on the Single Line working, attach the properly signed and cancelled forms and send off despatch bag to Area Manager.
The following day; still very wintry. Arrive at work to relieve the night turn. Pick up Monday evening's despatch bag from the Area Manager to find memo asking for my further report regarding the
'Delay to institution of Single Line Working'!