Signal Head

Member
Joined
26 May 2013
Messages
459
I recall an explanation from a senior railway Civil Engineer for the singling, and specifically centralising the track, was that it had been worked out that the most likely failure point was the spandrel walls, so moving the track away from the edge both reduced the likelihood of that occurrence and it's consequences. "The intention is to prevent a train exiting the viaduct through the spandrels" was the phrase used I think.
It wasn't, as some people suggested at the time, to prevent two trains being on the structure at the same time, as that could have been achieved by a bit of extra signalling/interlocking.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

nimbus21

Member
Joined
22 Jan 2018
Messages
30
Bulging spandrel walls are a common problem on arched bridges as evidenced by the remwdial tie bars and circular patress plates visible on many structures.
 