HMS Ark Royal
Established Member
More accurate it was........ put the runway out of action ?, no Sir, it didn't
It did for fast jets
More accurate it was........ put the runway out of action ?, no Sir, it didn't
A stick of smaller bombs dropped at an angle of 20 degrees to a linear target is more accurate than one big bomb. This is the way it was done to disable the runway at Stanley airport during the Falklands conflict.
It did for fast jets
They might have if they'd ever got them carriers working... I remember reading about a naval Stuka that was tested
Correct. Stopped the Argentinian AF and Navy flying any strike aircraft from the Falklands and thereby making things for the Task Force a little less dangerous.
--- old post above --- --- new post below ---
The Germans built one carrier and even that didn't get completed. Even so they would have had to attack in daylight and in the BoB the Stuka force was decimated and withdrawn very early on.
<sigh> Deltic08, I do wish you would not move the goal posts in a discussion. This is not the first instance that I have noted.
You orginally wrote, in reply to Senex: "I thought that line speed was eased at the north end for the duration when the WCML was closed during weekdays for electrification and resignalling work."
By which I took you to be saying that the PW and operating departments had somehow passed the line for 100 mph. Officially. So that is what i was answering. (Even though I have never heard of the term 'eased' in this context.)
I was not answering whether it was physically possible to do 90mph, or 100 mph on a line with miles and miles of downhill running from Ais Gill summit. It almost certainly is. But for the line to be officially passed for any increase in maximum speed - or 'eased' as you put it - is no simple matter.
Whether any 50s, 45s of 40s ever exceeded the 80mph line speed is another matter. I'm sure they did. On my trip with a 45 they did, marginally. Did Cl 50s ever go to 100 mph with an 80 mph line speed? Well, personally, I doubt any driver would go so far over the official limit. You say they did. I remain sceptical.
Having said that, I suppose, on a local level, with the full knowledge of the operating department and under good conditions (weather etc) it is possible for a one-off test to have been undertaken.
But in response to your assertion that any part of the line was 'eased' to 100 mph, meaning officially passed for 100 mph running (for locos and stock otherwise cleared for this speed), I repeat my opinion. I think it highly unlikely, and the number one reason I would expect to be cited - if, indeed, the operating department ever asked if it might be possible - would be braking distances. I very much doubt the signalling on the line would be up to 100mph standards.
Indeed, thinking only now that the line did not have AWS fitted, I think that alone would be enough to nix any chance of it being passed for 90 mph in the 1970s, let alone 100 mph - but perhaps others in here would know better.
Once again, there is a difference between a one-off train unofficially doing (in this case, as you claim) 10 mph over the line limit and officially passing that section for higher speeds under all conditions. The track maintenance schedule would be different too.
As for Mk 1 stock, on B4 or Commonwealth bogies the ride would have been no different from a Mk 2 carriage. In fact, a Mk 1 on Commonwealths was probably better.
Having been on the footplate numerous times in the 1970s (officially and otherwise) I am aware of what drivers felt they could typically 'get away with'. Which is exactly why I remain very sceptical of any driver taking the personal risk of drving a train up to 100 mph - 20 mph above line speed - on the S&C at any point on the line, OS Nock's claims notwithstanding.
I would imagine it would be a Form 1 offence.
Know it all, huh? Might be for a runway, but with the technology available in 1944-45 it had little or no effect on viaducts. As I wrote earlier the RAF and the USAAF dropped 3,500 tons of bombs on the Bielefeld Viaduct with no effect.A stick of smaller bombs dropped at an angle of 20 degrees to a linear target is more accurate than one big bomb. This is the way it was done to disable the runway at Stanley airport during the Falklands conflict.
It did for fast jets
Is this going to end up as handbags at ten paces on Platform 4 at Doncaster?
Is this going to end up as handbags at ten paces on Platform 4 at Doncaster?
Know it all, huh? Might be for a runway, but with the technology available in 1944-45 it had little or no effect on viaducts. As I wrote earlier the RAF and the USAAF dropped 3,500 tons of bombs on the Bielefeld Viaduct with no effect.
This is really far off topic, so this is my last post on the subject of bombing viaducts.
However if you are geared up for it, a runway or minimum strip can be made operational in 2 hours.
http://fauntrackway.co.uk/rapid-runway-repair
Yes if you will be my second?
I didn't start the off topic.
Know it all no. Know more than you possibly. Worldly yes but I agree with you so why the attitude.
I was an RAF Vulcan co-pilot in the last year of my RAF career. It was so boring I resigned my commission after getting a place at university. A Vulcan co pilot is just a glorified tea boy.
The one and only bombing run on Stanley airport did put the runway out of use.
A friend and former RAF colleague was shot down over the Falklands flying a Harrier so I know a little about the conflict. We joined the RAF on the same day.
man this off topic fast!
So if the current limit is 60 class 230's will be fine!
I have literally lost the thread. Is some one wanting to land VTOL aircraft on Ribblehead Viaduct?
I'm not sure a class 230 would be able to get itself over the Long Drag or up Mallerstang with a full train in the summer!
Not at the moment it doesn't. Landslide near Hexham has closed the line for three weeks until 50,000 tons has been removed and the remaining slopes stabilised.

Either that or bomb it.I have literally lost the thread. Is some one wanting to land VTOL aircraft on Ribblehead Viaduct?
My understanding is that sea trials start towards the end of this year?What did the Yanks do? Broke them up for spares and then sold us their version for £billions for carriers we do not have and will not have until 2021 at the earliest.
In all honesty I wasn't aware of that!
That's because you live in the wrong Richmond!!
My understanding is that sea trials start towards the end of this year?
That's what I thought - initial operating capability could be as early as the end of 2018, rather than "2021 at the earliest".Regarding our Queen Elizabeth class of ships... Fitting out will take until the end of 2015 and the crew will move aboard in May 2016 ahead of sea trials beginning in August 2016 and delivery in May 2017. Flight trials with helicopters will begin in 2017 and F-35B flight trials towards the end of 2018
With regards to the testing of the F-35B variant, sea trials have already taken place with the Royal Navy making splash and dash runs on USS Wasp as well as both RAF and Fleet Air Arm taking off using a special ski jump made up at NAS Patuxent River... Our F-35 inventory stands at 4 delivered
That's what I thought - initial operating capability could be as early as the end of 2018, rather than "2021 at the earliest".
Any idea of how soon she would be ready to be used as a platform for... <mumble>French</mumble> aircraft as has been suggested is possible to bring forward her operational dates? Or has that gone out of the window with the latest iteration of the catapult/no catapult roundabout?It is my understanding that, should they need to get a carrier anywhere, Queen Elizabeth can put to sea with 24 hours notice - though this is at risk of damage to the engines with no sea time logged as yet - for use as a landing platform for helicopters
Any idea of how soon she would be ready to be used as a platform for... <mumble>French</mumble> aircraft as has been suggested is possible to bring forward her operational dates? Or has that gone out of the window with the latest iteration of the catapult/no catapult roundabout?
I'm sorry but I don't have my Kent phrase book to hand.
sorry, i meant ''This got off topic really fast''

sorry, i meant ''This got off topic really fast''