Reinstating the passing loop at Bricket Wood was one of the successful bids for the first round of funding. The latest release comprises bids for the third round.I thought it was much beyond this phase. Not to mention, half of these are incredibly obscure.
Lots of good ones. What happened to the Watford/Abbey line? I thought that was shortlisted, or was that another initiative?
I think the full list has been released today:
![]()
In full: The 85 abandoned rail schemes vying for restoration funding | New Civil Engineer
The funding round closed last week, with more than 85 bids received to restore old railway lines to their former glory. The bids are dominated by schemeswww.newcivilengineer.com
I thought it was much beyond this phase. Not to mention, half of these are incredibly obscure.
Lots of good ones. What happened to the Watford/Abbey line? I thought that was shortlisted, or was that another initiative?
Ok thanks, this is helpful.There have been three rounds of applications. This is the list of those that submitted applications in the third and final round. Many are repeat applications, having been unsuccessful in the first or second round. All of these proposals will be whittled down to another 15 or so, to be progressed to a Strategic Outline
Business Case. Whether any of the previously unsuccessful proposals makes the cut is anyone’s guess.
Abbey Line was successful in round one. But it’s important to explain what ‘successful’ means. It results in the Government providing funding of 75% (max £50k) to the proposer to develop a Strategic Outline Business Case for their proposal. This business case is then submitted back to the DfT, who then assess it to see whether it will be worth taking further. Some will be. Many won’t. There is £500m of funding, and getting on for half is already earmarked for Okehampton and the Northumberland line.
The funding is for the period up to March 2024. Therefore I suspect that the projects most likely to succeed are those that involve parts of the railway already in existence, such as reopening stations on existing lines, or provision of services on freight lines - as with Okehampton that we heard about today.
I would like to see your'e list ?The 85 can be divvied up as follows:
75 barking mad off the wall which won't see the light of day again
5 which are worthy of further investigation and may or may not be viable
5 which probably make sense and may actually happen in the next 10 years.
I was surprised by the number for the Westcountry. Many of them could well be on the 'mad' listI would like to see your'e list ?
In particular the 5 which you think are worthy and the 5 that you think make sense!
So the first and second round 'winners' are just sitting awaiting this third tranche, to then comprise a 'long list' for the business cases?
I would like to see your'e list ?
In particular the 5 which you think are worthy and the 5 that you think make sense!
| Re-opening Sawston Station |
| Newcastle - Berwick-upon-Tweed |
| Reinstatement of Nexus Metro Expansion – Cobalt Business Park Line |
| Ledsham Station |
| Grove Station |
| Tavistock Okehampton |
| Corsham Station |
| Coventry area stations study |
| The Stourbridge Dasher - Stourbridge - Brierley |
| Lichfield - Burton on Trent / Derby |
It’s the same info that’s on DfT website that was linked to in post #317 on Monday - New Civil Engineer have just missed the first two groups off their version...I think the full list has been released today:
![]()
In full: The 85 abandoned rail schemes vying for restoration funding | New Civil Engineer
The funding round closed last week, with more than 85 bids received to restore old railway lines to their former glory. The bids are dominated by schemeswww.newcivilengineer.com
Okehampton’s consultation was all wrapped up in the wider “Devon Metro” scheme, so to find older phases of consultation and studies then that’s where you need to look. But it was bubbling along in various GW franchise consultations and ITTs etc, at least ten years ago, it was comparatively much further along well before these latest “lists of ideas“ were asked for.Okehampton seems to have bypassed most of the stages in the 3 rounds of applications., unless they were quietly worked on behind the scenes. C Grayling just 'instructed' GWR in Jan 2018 to introduce a service. No consultations, no business case, no DCO, assuming that was needed, no feasibility study. From 2018 to work starting in 2020 and opening in 2021. Portishead started in 2013 and is scheduled to open in 2024, Covid permitting. 11 years. E-W has been similarly drawn out. Oke will be open in 4 years from CG's instruction. A Ministerial 'instruction seems to be a way to shortcut the normal time consuming bureaucratic process
Timescales - Portishead Railway Group
Portishead Railway Group - campaigning for the reopening of the Portishead to Bristol Railway.www.portisheadrailwaygroup.org
I would like to see your'e list ?
In particular the 5 which you think are worthy and the 5 that you think make sense!

New station at Waverley looks a fairly easy win on Sheffield - Lincoln route. Successful in Round 2. Will be a wonderful source of confusion, so maybe it will need to be called Orgreave, or Waverley & Orgreave, station code WOE?
On the site of the 18th June 1984 Battle of Orgreave during the Miners Strike. It could become a tourist attraction, although the Orgreave connection seems to be being played down in favour of the new housing being built on the restored opencast site that replaced the battle ground.
This is also on the Barrow Hill route (used for freight and passenger diversions) successfully put forward for restoration in Round 1.
View attachment 92731
This is where restoration gets complicated because there's also a bid in to Round 3 to reopen the freight line through Victoria to Stocksbridge! All these 3 could be combined, but I'd suggest opening Waverley is the only realistic proposition.For s strategic point I would imagine those two have to be considered together. Also a bit tricky, as Sheffield Midland is essentially at capacity when you take into account other commitments. Wasn’t there a proposal for the Barrow Hill trains to go to a reopened Victoria? Not sure how that would work, as it wouldn’t be terribly convenient. I’m not local so don’t know, but would have thought a tram train option would be worth considering in the feasibility phase - better city access (including to Sheffield Midland), and far cheaper to run. Probably more expensive to set up, though.
I do think a new station for south Gloucester makes a lot of sense. The population of Quedgeley, Kingsway Hunts Grove and Hardwicke must be well over 30000 by now, and the railway goes right past. It’s more than three miles from there to Gloucester station, so an hour’s walk for most people. A station in the Naas Lane/Brookthorpe area would surely mop up a lot of passengers, and save ‘doubling back’ on journeys towards Bristol and Swindon. And it’s just off the M5 too.
It certainly looks like a good idea. The issue it will have is what calls there. Realistically it can only be the hourly stopper. And as hinted at above, that would also be the only train that could call at Stonehouse Bristol Rd and Saltford. Putting all three could well break the timetable. Tough call!
I’ll give you mine.
Those with a good shout:
Newcastle - Berwick, if it’s looking at additional services, not new lines or stations
New station south of Gloucester+
Sutton Park Line (Preferably Walsall - Aldridge only)
Those worth a look:
Wymondham - Dereham*
Ashton - Stockport
Middlewich Line
Rawtenstall - Manchester*
Midge Hall station
Carn Brea station
Stonehouse Bristol Rd station+
Saltford station+
Extension of Rivera line*
Corsham Station
Oswestry - Gobowen
Stockingford
Leek (at a push - big regeneration potential)
*These seem to be repurposing of heritage lines; it’s not clear how that might work with the heritage operation.
+these are all linked in service terms, unlikely to be able to have them all.
My opinions based on a cursory look. ‘Other opinions are available’
No love for Haverhill, @Bald Rick ? I would have thought that it would make the cut - and given the impending new town on RAF Mildenhall, I'd have added a new Mildenhall - Newmarket - Cambridge service, too.
Proposed conventional commuter rail routes into Cambridge suffer from the fact that the main Cambridge railway station is situated well over 1 mile from the city centre.No love for Haverhill, @Bald Rick ? I would have thought that it would make the cut - and given the impending new town on RAF Mildenhall, I'd have added a new Mildenhall - Newmarket - Cambridge service, too.
The Mayor has other plans for Haverhill. Let him do that.
Besides, no space at Cambridge for more trains post EWR.
Proposed conventional commuter rail routes into Cambridge suffer from the fact that the main Cambridge railway station is situated well over 1 mile from the city centre.
Addenbrooke's Hospital and the Biomedical Campus are fairly close to the A1307, the main Cambridge-Haverhill road, so a frequent bus service would be more useful than a rail service from Haverhill to these destinations as well as to the city centre.I see Haverhill as being like St Ives (Cambs) - better served (and more attractive at getting people out of cars) by a frequent busway or tram service than a once or twice per hour heavy rail service.
== Doublepost prevention - post automatically merged: ==
Though the main traffic objective from Haverhill is the Biomedical campus as much as it is the city centre.
Erf. See discussion elsewhereI was being tongue-in-cheek, but the 10 I picked out having scanned through were:
Tavistock Okehampton
quite why this wasn't linked with the Tavistock-Plymouth plan in this document ( bearing in mind the previous study for Tavistock was *not* done with a view of running through ) I don't know. There were studies done after 2014 over the whole thing, so I'm not sure this will even get to the 50k stage...
Perhaps there needs to be a fund for study suggestions which aren't reopenings, like moving stations to better sites. Not something which generates the same headlines, unfortunately.
Cambridge point well taken - but even if it was running through and not terminating? As for the risible bus-prentending-to-be-a-tram nonsense from the Mayor, the only good thing I have to say about that is that it (should) be relatively straightforward to convert into a proper tram when the current Mayor is replaced.The Mayor has other plans for Haverhill. Let him do that.
Besides, no space at Cambridge for more trains post EWR.
Is not the difficulty for ministers , in reopening , schemes like Grove and West Oxon (Witney) have BCRs of over 2 , as they are in prosperous South East , Sheffield may offer fantastic social benfits, poor BCR,s.
Perhaps the 8bn £, saved by cancelling the Expressway , could be redirected . Let us hope , otherwise there are far too many schemes .
Cambridge point well taken - but even if it was running through and not terminating? As for the risible bus-prentending-to-be-a-tram nonsense from the Mayor, the only good thing I have to say about that is that it (should) be relatively straightforward to convert into a proper tram when the current Mayor is replaced.
The whole thing needs the Beeching buzzword taking away from it, and a focus on connectivity improvements however they may be achieved.