No, the biggest obstacle is the lack of a physical link between Curzon Street and the lines to Bromsgrove and Banbury. Wiring is a much easier thing to do - and we've got ways of running trains away from the wires if we really cannot be bothered doing things properly.
Crickey. And electrification is nigh on impossible !.
Any other European country would have wired Bristol-Bromsgrove and Oxford-Coventry years ago. As things stand we still haven't even wired either Bristol or Oxford from the London end.
True. We can only dream.
There will be a lot of suppressed demand on XC thanks to years of hiking prices to keep Voyager loadings under control. Speed up the service by an hour (as HS2 Leeds would have done, slightly less for Manchester and Scotland), provide proper length trains and cut fares and there would be a spectacular sparks effect.
I can believe there is untapped demand there. Making Cross Country trains maximum length, to exploit the existing capacity used more efficiently, would be the first step to proving and addressing demand. Then move on to HS2 or whatever.
Yes, this is all on the assumption that a future government recognises that not all intercity passengers want to go to London and funds the infrastructure to connect Bristol and Oxford (and beyond to Curzon Street and integrate XC into HS2.
I got to thinking South West (and South) of Birmingham is the Thames valley technology corridor. Is there enough demand there ?.
Surely the easier thing to do would be to run new XC services using WCML capacity freed up by HS2?
Agreed.
Perhaps need more Voyagers or Bi-Mode replacements.
We can't expect direct services everywhere. Hs2 with further phases would improve non london intercity journeys and take pressure off of XC. Midland rail hub would connect SW and S Wales better with Curzon St through Moor St. OOC does too, but for OOC to provide a better, faster journey for SW, it needs the later phases to encourage the flow that way with quicker journey times.
The Didcot-Birmingham line should benefit from hs2 too with an expected 4 tph Oxford-Birmingham and a quicker journey for current xc passengers on hs2 for anyone travelling from Reading or further south.
The eastern branch would have provided further non London long distance improvements such as Nottingham-Leeds and Sheffield-York.
XC was always expected to continue running and would continue to provide a direct option but with less pressure and more ability to serve those intermediate stations.
Yes. Realistically HS2 would make journeys to/from the South West more attractive vie London. Thus actually reducing demand for Cross Country. A nice problem to have ?.
If demand one day really gets high enough then maybe an HS5 (or so) linking the South West to Curzon Street.
In my dreams and lets face is HS<5 London to Bristol would happen first.
Getting the HS2 Eastern branch through the East Midlands and on to the North East done might add weight to the argument for a connection to the South West of course.
Where would a High SPeed connection south of Curzon street to classic lines be located?
Good question.
I suppose a connection Southwards on to the WCML would be South of the Birmingham/Handsacre branch split to benefit all services.
For links towards Leamington and Bromsgrove probably close to Birmingham so via Curzon Street.
Leamington could be achieved via Coventry (so WCML covered) somehow ?.
But risks more pressure on the flat junctions at Coventry where all the extra freight could be going !.
BUT.
In a nut shell.
If we cannot even get High Speed rail as far as Manchester from the biggest city/conurbation in Britain then all the rest is a pipe dream.