I too would love to see double track return. To me and the majority of people who live along the route it is just common sense.
Major infrastructure works would be needed though:
1) At least 3 bridges have been replaced with single line structures (Honiton and Templecombe) not to mention the M5 overbridge at exeter which has been built wide enough for one track only as has the A35 overbridge on Honiton bank.
2) Stations have had platforms extended across the former formation (Crewkerne & Whimple) which would need cutting back and in addition 2nd platforms built capable of handling the Class 159's (or 444's if electrified in the future) would be needed at Tisbury, Yeovil Junction, Crewkerne, Feniton and Whimple.
3) 7 level crossings (I think) need reconstructing to allow for double track as AHB's have been built on the formation on at least one side of the track.
4)Track re-alignment would also be need along most of the route as it has been slewed to take the fastest alignment.
Alot of work to do but these are surmountable problems as seen with the construction of the Axminster dynamic loop, where everything listed above was done on a smaller scale.
The sooner the track is returned a double track mainline the better.