Failed Unit
Established Member
Just thinking about this thread, it feels (probably unfairly) that not many days go by without a train failure disrupting the ECML.
https://www.railforums.co.uk/threads/shadow-transport-secretary-stuck-on-broken-train.158796/
From experience I have found it typically takes about 2 hours from the train failing to getting it moving again on a class 91. Just interested what the general process is for sorting it. I know the 91 has many SPOFs whereas a HST at least can run on a single power car in some circumstances.
High level is it something like..
1. Driver notices problem.
2. Speak with control and hits it with a hammer a few times (or attempts to fix it if that upsets some members)
3. Drive / control agree nothing further can be done so dispatch a rescue loco.
4. Rescue loco arrives (but again takes a while as other trains in the way, needs to travel from whereever it was)
5. Attach rescue loco and hopefully it talks nicely to set and off you go.
If my high level steps are correct I can see why it takes so long,
If the train is a unit, do most of them have coupler adapters, or if say a 180 has failed and the following train is a 158, the control teams do a little more cursing?
I know things break and that is life and IEP will help the ECML in some failures, but is there really much more we can do to speed up rescue?
https://www.railforums.co.uk/threads/shadow-transport-secretary-stuck-on-broken-train.158796/
From experience I have found it typically takes about 2 hours from the train failing to getting it moving again on a class 91. Just interested what the general process is for sorting it. I know the 91 has many SPOFs whereas a HST at least can run on a single power car in some circumstances.
High level is it something like..
1. Driver notices problem.
2. Speak with control and hits it with a hammer a few times (or attempts to fix it if that upsets some members)
3. Drive / control agree nothing further can be done so dispatch a rescue loco.
4. Rescue loco arrives (but again takes a while as other trains in the way, needs to travel from whereever it was)
5. Attach rescue loco and hopefully it talks nicely to set and off you go.
If my high level steps are correct I can see why it takes so long,
If the train is a unit, do most of them have coupler adapters, or if say a 180 has failed and the following train is a 158, the control teams do a little more cursing?
I know things break and that is life and IEP will help the ECML in some failures, but is there really much more we can do to speed up rescue?