A few questions on request stops if I may, starting with timetabling (hence I put it into this sub-section).
If you have just one or two request stops in a service, I would assume the planners must assume 'the worst' - ie the train is timed to stop, and if it does not need to do so, then the minute or 90 seconds* saved by not stopping just becomes addtional recovery time.
* I guess that is the kind of net savings on most lines that have request stops in the timetable?
But what happens on lines that have multiple request stops, eg the Heart of Wales or Far North line? Is it the same 'worst case' scenario applied, or do the planners say, for example, well, between corssing points X and Y, we have four request stops. On most days, at worst, only two stops are needed, so we time the train for two stops - and if, on some freak days, the train has to stop at all four stations, it will just lose 3-4 minutes between X & Y? And no delay will be attributed to the driver?
And how do train crew view request stops? Do you just get used to them, or do they introduce extra concern? eg - for a driver - what if I don't see a passenger waiting at night? and for a guard - what if I forget a passenger needs to alight?
And what about some stations where only some services, eg outside the peaks, are request stops? Thanks for insights and thoughts.
If you have just one or two request stops in a service, I would assume the planners must assume 'the worst' - ie the train is timed to stop, and if it does not need to do so, then the minute or 90 seconds* saved by not stopping just becomes addtional recovery time.
* I guess that is the kind of net savings on most lines that have request stops in the timetable?
But what happens on lines that have multiple request stops, eg the Heart of Wales or Far North line? Is it the same 'worst case' scenario applied, or do the planners say, for example, well, between corssing points X and Y, we have four request stops. On most days, at worst, only two stops are needed, so we time the train for two stops - and if, on some freak days, the train has to stop at all four stations, it will just lose 3-4 minutes between X & Y? And no delay will be attributed to the driver?
And how do train crew view request stops? Do you just get used to them, or do they introduce extra concern? eg - for a driver - what if I don't see a passenger waiting at night? and for a guard - what if I forget a passenger needs to alight?
And what about some stations where only some services, eg outside the peaks, are request stops? Thanks for insights and thoughts.