I've read that 3rd rail is limited to 100mph.
Thinking about the London to Brighton route and area, would an increase in speed to 125 (if OHLE were to be installed) really make much of a difference?
Would there be other benefits?
The benefit of 25kVac over 750VDC on what is really an outer-suburban network is more with acceleration and better regenerative braking rather than speeds faster than 100mph.I'll always endorse OHLE conversion but nowhere in the Southern Region needs to be 125mph. All that would do is reduce capacity, no?
However as @AM9 has pointed out, better acceleration and better regenerative braking is certainly one of these benefits right?
Oh yes:
Better acceleration
Better regen
Safer
Cheaper infrastructure maintenance
More reliable infrastructure overall
Reduced disruption due to external events
Also more trains can run as there will be more paths to fit in or have I got that part wrong?
Yes, you have that wrong.
However OHL would have advantages over 3rd Rail especially between Bournemouth and Weymouth as the power supply is rather restricted down there as I understand it?
The SW mainline is really the only Southern line that might benefit from conversion to 25kV. However, the costs would be considerable, and the benefits fairly limited. With only a limited pot of money available for improvements, there are many other things that would give a far better return.There was a study a few years ago saying it might be worthwhile to convert the third rail network over a long period, starting with the outer parts of the SW main line where the benefits would be greatest (opportunities for high speed running and electric freight, and some of the existing supply equipment needed replacing anyway). However this was at a time before electrification schemes went way over budget. Converting third rail would be more complicated than just installing OLE and bring less benefit, so the idea is likely to be dead for the foreseeable future.
I am assuming that this was written with a large slice of tongue in cheek? Having been borne and brought up in third rail territory, and moved to OLE land, my experience is that third rail services are far more reliable. When OLE areas are suffering from ice on the wire, and consequent dewirings, third rail areas seem to keep soldiering on (provided the de-icing trains are run properly). Displaced conductor rails do occur, but far less frequently than problems with the OLE. And when they do occur, they are far less disruptive. A fault on the OLE, such as a wire down, often shuts both lines, to all traffic, often for long periods of time, whereas a displaced conn rail usually only shuts one line, only to electric traction, and is usually fixed relatively quickly.Oh yes:
Better acceleration
Better regen
Safer
Cheaper infrastructure maintenance
More reliable infrastructure overall
Reduced disruption due to external events
How many times does that happen per year then?I agree. I live in Third Rail land and travel across the country and worked on the MML and ECML. The overhead wires, whilst very nice, are absolutely knackered the minute a small plastic bag or balloon flies off into them;
All OLE installed or replaced in the UK since the '60s, has been fitted with automatic tensioners, either with weights or spring types like Tensorex. In areas of frequent high winds, higher wire tension or more frequent supports reduces the risks of misalignment and subsequent damage.... or when there's high winds, when it's too hot (sagging), when it's covered in ice etc.
Despite extensive icing, it still doesn't do much for reliability of either slow or intense services.... Basically, the third rail is definitely difficult during ice but can be managed with appropriate de-icing.
The current speed limit of 3rd rail operation is a compromise between a reasonable maximum operating speed for shorter outer suburban services (which is also in-part near the limit of lower voltage power supplies), and reduced reliability of current collection, as well as increased shoe and track damage.... Yes, it doesn't have the high speeds of the overheads but when you consider where it operates and what sort of services run on it, it's perfect.
I think they should convert more routes into third rail, to be honest. I don't care what the ORR say, they are deliberately putting up obstacles.
Let's see...
- Bidston to Wrexham Central
- Ellesmere Port to Helsby
- Hurst Green to Uckfield
- Ashford Intl to Ore
- Reigate to Guildford
- Ash to Wokingham
- Hunts Cross to Warrington Central
- Kirkby to Wigan Wallgate
- Ormskirk to Preston
The BML south of Merstham area, parts of the south-Eastern mainlines would also benefit. Much of the costs would be defrayed against the necessary replacement of existing DC installations and many of the structures over the lines which are well over 100 years old.The SW mainline is really the only Southern line that might benefit from conversion to 25kV. However, the costs would be considerable, and the benefits fairly limited. With only a limited pot of money available for improvements, there are many other things that would give a far better return.
The LB&SCR 6600V ac OLE went as far as South Croydon, There were plans to electrify the BML, only halted by the 1923 grouping. In 1925, the Southern Railway decided to convert the ac lines to 3rd rail dc as both the SE and SW parts of their network were already DC, (mainly following US practice). There was no technical justification for it. The SWML wasn't electrified beyond the Alton line junction until 1966.The Southern chose to rip its overheads out, and replace them with third rail, for good reasons.
The power supply is restricted a the electrification was done to a budget, and thus fewer substations were installed (and possibly only a 11kV feeder like on the Hastings line?)
Therefore the obvious way to increase power is to put in more substations.
Not possible unless you lose all the freight. There’s been many previous discussions about this...The SWML from Woking to Basingstoke, and maybe to Eastleigh/Salisbury via WEML (latter not electrified anyway), could get 110-125mph running with OHLE and rolling stock changes, but I doubt that would happen anytime soon![]()
nearly rightThe BML south of Merstham area, parts of the south-Eastern mainlines would also benefit. Much of the costs would be defrayed against the necessary replacement of existing DC installations and many of the structures over the lines which are well over 100 years old.
The LB&SCR 6600V ac OLE went as far as South Croydon, There were plans to electrify the BML, only halted by the 1923 grouping. In 1925, the Southern Railway decided to convert the ac lines to 3rd rail dc as both the SE and SW parts of their network were already DC, (mainly following US practice). There was no technical justification for it. The SWML wasn't electrified beyond the Alton line junction until 1966.
Not possible unless you lose all the freight. There’s been many previous discussions about this...
It’s simply a very busy two track railway, and if the passenger trains speed up significantly they’ll run into either the slow freights or the all stations stoppers in front of themOh right, so as to understand it better, what such factors make freight the reason specifically? My instinct is influence on the track/trackbed and/or line capacity as a whole, but I maybe wrong :/
Obviously freight will never be lost due to Southampton Docks
I am assuming that this was written with a large slice of tongue in cheek? Having been borne and brought up in third rail territory, and moved to OLE land, my experience is that third rail services are far more reliable. When OLE areas are suffering from ice on the wire, and consequent dewirings, third rail areas seem to keep soldiering on (provided the de-icing trains are run properly). Displaced conductor rails do occur, but far less frequently than problems with the OLE. And when they do occur, they are far less disruptive. A fault on the OLE, such as a wire down, often shuts both lines, to all traffic, often for long periods of time, whereas a displaced conn rail usually only shuts one line, only to electric traction, and is usually fixed relatively quickly.
Unlike OLE, third rail electrification can be installed without significant civil engineering works, and with minimal disruption to traffic.
I am not convinced that third rail is significantly less safe than OLE, judging by the number of people who seem to get electrocuted in OLE areas. I think that the third rail is more "in your face" when on and about the line, so you take more care, whereas it is easy to forget about the OLE as you are not routinely having to avoid it.
I agree. I live in Third Rail land and travel across the country and worked on the MML and ECML. The overhead wires, whilst very nice, are absolutely knackered the minute a small plastic bag or balloon flies off into them; or when there's high winds, when it's too hot (sagging), when it's covered in ice etc. Basically, the third rail is definitely difficult during ice but can be managed with appropriate de-icing. Yes, it doesn't have the high speeds of the overheads but when you consider where it operates and what sort of services run on it, it's perfect.