Renewable Energy and Rail

Status
Not open for further replies.

TheIRO

Member
Joined
15 Sep 2014
Messages
12
The Cliff Railway at CAT was opened in 1992 and was a innovative piece of engineering that runs on renewable energy. It combines old and new technologies and is an example of how modern-day travel can work in harmony with the environment.

How far do you think we can go into incorporating renewable energy across the railway network, if at all?
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

DownSouth

Established Member
Joined
10 Dec 2011
Messages
1,545
Swapping fossil fuel electricity for renewable electricity and increasing the use of electric traction would be the most obvious solution.

Solar/battery power for signals in remote areas is an off-the-shelf item that needs no R&D, only Ctrl+C Ctrl+V.

Addition of flywheel recovery units to future EMUs would be a major improvement allowing increased performance when departing stations without adding any extra load on the overhead wire system. Flywheel recovery units would make for far more efficient use of excess energy than regenerating into the overhead wires would, and could see significant gains without the fire risk of using batteries.
 