On 12 Nov, services from Brighton to Three Bridges were replaced with rail replacement buses.
I planned to catch an RRB from Wivelsfield to Three Bridges before connecting onwards with a Thameslink service to Blackfriars.
I arrived for the 1149 rail replacement, which never arrived. The following RRB (coach) arrived at around 1235 with only two seats left, and then I gave up with this idea at about 1319 when I opted to board a Metrobus service from the shared RRB stop to Crawley bus station, then catch a Southern service (14:10 delayed to 14:14) from Crawley to Three Bridges, then connecting onto a Thameslink service at Three Bridges at .
I submitted a delay repay claim to Thameslink, who have rejected it as their system shows RRB's as "on time" no matter what has happened.
In total, I paid:
£5.20 - Metrobus fare
£1.70 - Crawley to Three Bridges (keyGo)
£16.10 - Burgess Hill to London Zones 1-6
There's records of the RRB issues on Twitter within Thameslink's replies (not from me):
I would preferably like to be reimbursed for my bus and single train fare, as well as the delay repay compensation.
Is there any particular phrasing I should include in a message to their customer services email in order to make this more likely to be issued?
Cheers all!
I planned to catch an RRB from Wivelsfield to Three Bridges before connecting onwards with a Thameslink service to Blackfriars.
I arrived for the 1149 rail replacement, which never arrived. The following RRB (coach) arrived at around 1235 with only two seats left, and then I gave up with this idea at about 1319 when I opted to board a Metrobus service from the shared RRB stop to Crawley bus station, then catch a Southern service (14:10 delayed to 14:14) from Crawley to Three Bridges, then connecting onto a Thameslink service at Three Bridges at .
I submitted a delay repay claim to Thameslink, who have rejected it as their system shows RRB's as "on time" no matter what has happened.
In total, I paid:
£5.20 - Metrobus fare
£1.70 - Crawley to Three Bridges (keyGo)
£16.10 - Burgess Hill to London Zones 1-6
There's records of the RRB issues on Twitter within Thameslink's replies (not from me):
I would preferably like to be reimbursed for my bus and single train fare, as well as the delay repay compensation.
Is there any particular phrasing I should include in a message to their customer services email in order to make this more likely to be issued?