Could 3rd rail pickups be reinstated on 373s reasonably easily once they're retired from eurostar, or has all that equipment been chucked away?

I don't have a use case yet. But for the time being I guess any of the many things 442s have been proposed for in this forum, as it's somewhat in that spirit! Mind you there are even more possibilities cause of the dual voltage. Canterbury - Berwick - Androssan for example (the three holy islands :lol: )
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

martin2345uk

Established Member
Joined
21 Sep 2011
Messages
2,408
Location
Essex
The things are already pretty ancient in train terms, I can’t any other operator willing to take them on (plus they’re horrible to drive :lol: )
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,856
The things are already pretty ancient in train terms, I can’t any other operator willing to take them on (plus they’re horrible to drive :lol: )
And the surviving sets are not suitable for North of London use. From memory there were electrical differences on the NoL sets (3733xx) that made them (more) suitable for such work.
 

martin2345uk

Established Member
Joined
21 Sep 2011
Messages
2,408
Location
Essex
Well it's all subjective of course, some people like them, but for me they are horribly noisy, bouncy, and they have a horrible on-board computer diagnostic system that is about as un-user friendly as you can get!
Not to mention the fact they don't have any kind of traction interlock.
I will not miss them when we replace them!
 

Sad Sprinter

Established Member
Joined
5 Jun 2017
Messages
3,186
Location
Way on down South London town
Well it's all subjective of course, some people like them, but for me they are horribly noisy, bouncy, and they have a horrible on-board computer diagnostic system that is about as un-user friendly as you can get!
Not to mention the fact they don't have any kind of traction interlock.
I will not miss them when we replace them!

Presumably the noise from the traction equipment during deceleration and acceleration is quite noticeable in the cab?
 

popeter45

Established Member
Joined
7 Dec 2019
Messages
1,495
Location
london
the issue is where could you find a route that needed such a high per trip capacity and fit such long units into its platforms?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,305
the issue is where could you find a route that needed such a high per trip capacity and fit such long units into its platforms?
Perhaps if you were a fantasy open access operator you could have the front of the train in Marchwood while still drawing power from Totton? o_O
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,526
Location
Taunton or Kent
Perhaps if you were a fantasy open access operator you could have the front of the train in Marchwood while still drawing power from Totton? o_O
Or even better, deploy them on Merseyrail: you could serve Headbolt lane while still on power at Kirkby, and even better, some of the close stations in the City Centre could be served with passengers boarding at one station, walking through the train and alighting at the next station :D
 

popeter45

Established Member
Joined
7 Dec 2019
Messages
1,495
Location
london
Perhaps if you were a fantasy open access operator you could have the front of the train in Marchwood while still drawing power from Totton? o_O
if going fantasy then yea add the 3rd rail back in and turn them into a sleeper service :lol:
gut interior and replace with bed cabins and couchette bunks, even could turn the middle coach 9-10 into control cars so can split mid route
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,348
We could always get an infill 1500V electrification from Pelaw to the approach to Newcastle Central, then use them to run London-Newcastle-Sunderland services!

Although I believe that would require some gauging work near Newcastle Central.
 