northwichcat
Veteran Member
When Network Rail move from signal boxes to regional signalling centres, what kind of vacancies are going to be made available and approximately how many regional centres will there be across the UK?
Not much more than the current difference between a grade 2/3 mechanical box and a higher grade position in a busy power box. Both are working to the same Rule Book, and will be dealing with the same sort of things (LC users, line blockages, faults etc.) as each other, albeit more intensively in the latter case (hence the higher grade!), and - for the time being - the job's no different in the ROCs.The regional signal centres will require different skills to the ones currently used at signal boxes.
Plenty are doing, and I'd rather like to do the same (albeit at a younger age and with a shorter distance to travel) when the time comes, to allow me to continue with my career! The 'computerised system' is only a small part of the job really - the interface between the Signalman and the kit on the ground. For the most part, it's not very much different to operating an NX panel in principle, and, as much as I'm sure they'd rather be working their old panels, the 'old hands' that I've come across when I've been in the EMCC seem to be getting on just fine with the new kit.Will a 63 year old signaller want to move somewhere else 40 miles away and have to learn a new computerised system that has very few similarities with the traditional signal box.