• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Reduced LNER service to Northallerton 26-30 May

Status
Not open for further replies.

Ralph Ayres

Member
Joined
2 May 2012
Messages
261
Location
West London
Double-checking a planned trip, I found this warning on both National Rail Enquiries and LNER's own website:
Engineering work is taking place in the Dewsbury area, impacting TransPennine Express services across the whole TransPennine Express network.

As a result, most LNER services, including the York - Newcastle shuttle service, will be unable to call at Northallerton.

You should use TransPennine Express services if you are travelling from / to Northallerton, at no extra cost.

Is this just a complete mix-up or is there some obscure link between what happens at Dewsbury and LNER stopping at Northallerton?

Longer LNER trains to cover gaps in TPE services perhaps that won't fit the platforms?

In practice according to the journey planner trains seem to be stopping as normal for the times I'm likely to be arriving and leaving.

Pity they haven't thought to explain it!
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Segedunum

Established Member
Associate Staff
International Transport
Joined
22 Dec 2013
Messages
4,758
Location
Up North
Double-checking a planned trip, I found this warning on both National Rail Enquiries and LNER's own website:

Engineering work is taking place in the Dewsbury area, impacting TransPennine Express services across the whole TransPennine Express network.

As a result, most LNER services, including the York - Newcastle shuttle service, will be unable to call at Northallerton.

You should use TransPennine Express services if you are travelling from / to Northallerton, at no extra cost.


Is this just a complete mix-up or is there some obscure link between what happens at Dewsbury and LNER stopping at Northallerton? Longer LNER trains to cover gaps in TPE services perhaps that won't fit the platforms? In practice according to the journey planner trains seem to be stopping as normal for the times I'm likely to be arriving and leaving. Pity they haven't thought to explain it!
The paths between the LNER 'shuttle' services and the TPE service essentially swap over - so LNER takes the 'fast' path at around xx05 and TPE take the 'slow' path at around xx43 (from Newcastle this is). This is because TPE are diverting via Woodlesford/Wakefield so journeys take longer (around 15-20 extra minutes as it happens!)

So as a passenger, other than the colour of your train, you'll see little difference. That 'slow' path includes a Northallerton call, so TPE simply call at Northallerton instead of LNER. If anything - it's actually a better service as the TPE service is largely hourly while the LNER 'shuttle' is roughly two-hourly.
 
Status
Not open for further replies.

Top