Sunset route
Established Member
- Joined
- 27 Oct 2015
- Messages
- 1,224
I’ve got no idea about signal sighting, that’s above my pay grade. So I wouldn’t quote me on such issues.
But most signallers will place the train at the London end of the platform if they need the country end clear or think they will need to use the country end of the platform whether it’s actually used or not.
== Doublepost prevention - post automatically merged: ==
I’ve got no idea about signal sighting, that’s above my pay grade. So I wouldn’t quote me on such issues.
But most signallers will place the train at the London end of the platform if they need the country end clear or think they will need to use the country end of the platform whether it’s actually used or not.
But most signallers will place the train at the London end of the platform if they need the country end clear or think they will need to use the country end of the platform whether it’s actually used or not.
== Doublepost prevention - post automatically merged: ==
Thanks - so stopping short has no operational drawbacks as long as it's with permission - i.e. none of the supposed signal sighting problems, underframe equipment location and other nonsense mentioned here? As a short stop on p0 by a 2 or 3 car train wouldn't make any difference to any other train in p0 (I wasn't even sure if there is permissive working in p0 anyway), it adds even more weight to my argument that it would be extremely easy to put an additional stop board up to make the current arrangements 'official'. Sorry - silly me - nothing can ever be done to Redhill again as the design team has been disbanded!
I’ve got no idea about signal sighting, that’s above my pay grade. So I wouldn’t quote me on such issues.
But most signallers will place the train at the London end of the platform if they need the country end clear or think they will need to use the country end of the platform whether it’s actually used or not.