I know this a rail forum but know that some of you will be interested.
Red Funnel is currently in the process of refitting the Red Falcon, which includes completely new interiors, two new lounges and a new outside deck.
There are some pictures of the refit here.
She passed her MCA drill today and is scheduled to be back in service on Friday (4th April) as planned. For those of you that want to see her she will be on the following sailings;
From Southampton
0800
1100
1400
1700
From East Cowes
0930
1230
1530
1830
She's likely to be on these sailings for at least two weeks (last I heard) as she will be able to lay up overnight.
Red Funnel is currently in the process of refitting the Red Falcon, which includes completely new interiors, two new lounges and a new outside deck.
There are some pictures of the refit here.
She passed her MCA drill today and is scheduled to be back in service on Friday (4th April) as planned. For those of you that want to see her she will be on the following sailings;
From Southampton
0800
1100
1400
1700
From East Cowes
0930
1230
1530
1830
She's likely to be on these sailings for at least two weeks (last I heard) as she will be able to lay up overnight.