With Bedford Midland station due for a rebuild and East West rail due to call there the station is going to need some major works. I would do it in this order if it is possible:
Phase 1 demolish the existing station buildings and all the platform buildings.
Phase 2 begin building two new through platforms on the the site of the current car park and station building. These would be built for EWR but commissioned and used for terminating Thameslink services initially. EWR services to terminate at St John's temporarily.
Phase 3 rebuild the current platforms 1 and 2 further east for terminating Thameslink trains.
Phase 4 rebuild the current plafrom 2 & 3 island further East so the current track on platform 3 becomes a through line with the new platform 3 as a loop off the Southbound fast line. The current platform 4 is unaltered but becomes a loop off existing through track which becomes a through Northbound fast. (I can't remember which is the up fast and down fast sorry).
Phase 5 new station building and multi story car park to replace lost car parking.
If the aproches from the south are to constrained by Ford End Rd bridge then the whole station would have to move Northwards.
Final layout would be new platforms 1 & 2 for EWR, platforms 3 & 4 for terminating Thameslink and platforms 5 & 6 (currently platform 4) as loops off the fast lines for EMR semi-fast services to Wellingbrough, Kettering and Corby which can be overtaken by nonstop services to Leicester that carry onto Nottingham, Derby and Sheffield on the through lines.
Phase 1 demolish the existing station buildings and all the platform buildings.
Phase 2 begin building two new through platforms on the the site of the current car park and station building. These would be built for EWR but commissioned and used for terminating Thameslink services initially. EWR services to terminate at St John's temporarily.
Phase 3 rebuild the current platforms 1 and 2 further east for terminating Thameslink trains.
Phase 4 rebuild the current plafrom 2 & 3 island further East so the current track on platform 3 becomes a through line with the new platform 3 as a loop off the Southbound fast line. The current platform 4 is unaltered but becomes a loop off existing through track which becomes a through Northbound fast. (I can't remember which is the up fast and down fast sorry).
Phase 5 new station building and multi story car park to replace lost car parking.
If the aproches from the south are to constrained by Ford End Rd bridge then the whole station would have to move Northwards.
Final layout would be new platforms 1 & 2 for EWR, platforms 3 & 4 for terminating Thameslink and platforms 5 & 6 (currently platform 4) as loops off the fast lines for EMR semi-fast services to Wellingbrough, Kettering and Corby which can be overtaken by nonstop services to Leicester that carry onto Nottingham, Derby and Sheffield on the through lines.