The lines out of Liverpool Street have had a massive uplift in capacity since 2013 with the introduction of new rolling stock and 240 metre trains, a much quicker and cheaper way of delivering new capacity than spending £billions on Crossrail 2.
In 2013 there was still an assumption that low economic growth was a temporary thing, not a rut that nobody would know how to get out of.
It is telling that the Stansted Airport expansion is going ahead on the assumption that existing capacity can cope with the growth.
Did you miss the bit where I said that the level of house building in the upper Lea Valley has been limited because of not having Crossrail 2.
First up, Airport flows are different to those generated by housing. For example a lot will be off peak or counter peak flow (i.e. adding more passengers to the emptier services out of London in the morning peak). As such not really adding significant numbers to the trains which are the busiest.
Of course the other factor is the scale of passengers, the airport is expected to add maybe 5 million passengers a year (the range is between 4 million and 5 million) which with an 18 hour a day, 4 trains an hour over 350 days a year means the average number of passengers per train will be about 100.
As such the impact isn't going tobe that big and so building Crossrail 2 just for the airport would be overkill.
Conversely building 150,000+ new homes (360,000 population increase) It's going to have a much bigger impact on rail use.
Rather than being 5 million, that could be 30 million (even a very low ball estimate using station usage at a station with high car ownership rates and a circa hour to a London terminus would put it comfortably over 10 million).
At 20 million (so between those estimates and potentially a little less than realistic) that's 4 times the numbers and mostly focused on peak (into London) services where the trains are already busy.
For example the Broxbourne Borough Local Plan 2018–2033 limited housing to circa 7,700, whilst under Crossrail 2 that district could deliver 17,000 new (additional) homes (range of 15,000 to 40,000, so 7,000 to 32,000 additional homes above those to 2033).
As I've said, there are also other areas (Central London passenger numbers, issues with connections at Clapham Junction for longer distance and outer suburban services, and the SWR routes) which also come into play so even if one or two are slightly off the original target that's less of a problem.
Especially given I've been comparing against the original 2033 target opening date, if that shifts back by between 7 and 17 years, then that means that passenger numbers need not to be so high. As such rather than Liverpool Street needing to be at 2030 numbers it can be at 2023 numbers.
From 2013, that's 10 years of growth (rather than 17), that means 137.2 million passengers for the London/East of England passenger flows rather than 150.0 million.
That's 7.2 growth between 2025 and 2030, which means my original point about getting to pre Covid levels at less than 2% growth per year (as 2% per year for 5 years is 10.4%) would mean that if we met the pre Covid numbers in or before 2030 then we'd be on track for the revised timeline of opening in 2040 and way ahead of 2050.
Politically, the chances of that are zero. This government isn't going to do it, and the government elected in 2028 or 2029 isn't going to do it either. Government's are going to struggle just to keep on spending on the projects that have already started.
Unpausing isn't likely to result in spending from Central Government any time soon, however would allow the taxes for Crossrail 2 to be started to be collected before construction starts with less political fall out.
For example, those current Crossrail levies if they just keep on being collected is less noticeable than if they stop and then restart.
Yes, there's going to be some who complain that they're paying for something which might not start for some time, but that's less noticeable than if they stop paying for (say) 5 years and then start again.
If by doing that it allows Central Government to shift a bit more of the cost to TfL then that's likely to be a positive thing.
Given this, that whilst we'renot that far off pre Covid passenger numbers and that by having a later opening date the target numbers are at least 7 years behind where they needed to be for the original opening date, I'm still convinced that it's not as dead in the water as some think it is.
Especially, given that there's a need for more housing and this could deliver over 100,000 additional homes over what could be delivered, just withinthe Hertfordshire and Upper Lea Valley areas.
Let alone (for example) helping to unlock the circa 35,000 new homes which are likely to be required over the next 15 years in the soon to be created North Hampshire unitary authority.
Let alone what it could unlock across the whole of the SWR area covered by the outer suburban and longer distance services where on average train frequencies could increase from 2tph to 3tph.