Are there any serious conceptual plans for capacity increases on this section?
First question is of course....is there a problem? It would seem to me that there is a lot of traffic going through, it is of varied types (Express, local, stone, container), and much of it travels long distance so timetabling and performance of this section has affects across a wide area.
If capacity could be improved extending terminating slow trains through Reading to Green Park/Basingstoke and Theale would hugely improve commutes into and across Reading.
From google maps any extra tracks north of the Bath road would be disruptive and probably need demolitions (possibly locally acceptable if it enabled an enhanced local service), but a flyover at Southcote would presumably make things much easier as Crosscountry and GWR expresses don’t conflict with long liner and stone trains trundling through.
First question is of course....is there a problem? It would seem to me that there is a lot of traffic going through, it is of varied types (Express, local, stone, container), and much of it travels long distance so timetabling and performance of this section has affects across a wide area.
If capacity could be improved extending terminating slow trains through Reading to Green Park/Basingstoke and Theale would hugely improve commutes into and across Reading.
From google maps any extra tracks north of the Bath road would be disruptive and probably need demolitions (possibly locally acceptable if it enabled an enhanced local service), but a flyover at Southcote would presumably make things much easier as Crosscountry and GWR expresses don’t conflict with long liner and stone trains trundling through.