• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Reading Station

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

thefab444

Established Member
Joined
27 Oct 2006
Messages
3,688
Location
The New Forest
There's a through line between Platforms 4 & 5, bidirectional. There used to be a through line between Platforms 8 & 9 as well, but this got taken out. There is also the goods loop(s) behind the station.
 

16CSVT2700

Established Member
Joined
4 Sep 2005
Messages
1,837
Location
Gdansk
Wasn't actually a through line between 8&9, it was a loco run round loop.
It was taken out when VXC stopped using spoons
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,214
Location
Yorkshire
Reading has no fasts, only Mains, Goods, Reliefs. And you can do 50 now :D
The GWR preferred the terms "main" and "relief" lines, as opposed to the more common "fast" and "slow" lines, they are just alternative names for the same things. This naming convention survives to this day.
 

Jord

Member
Joined
21 Jun 2007
Messages
1,180
Location
Aberdeenshire
There's a through line between Platforms 4 & 5, bidirectional.

Correct, as when i went through back in the summer, we was stuck in the platform for a while, as something in front failed so the area was building up with trains and a 59 stopped in that bidirectional line heading west.
 