Reading Green Park Station

Status
Not open for further replies.

MarkyT

Established Member
Joined
20 May 2012
Messages
7,566
Location
Torbay
Can anyone explain the thinking behind 2 platforms each 150m long

Not long enough for an 8car EMU (if line is ever electrified), but far longer than a Voyager (if cross country were ever to call) and rather longer than a pair of 165 or 166 DMUs. Almost feels like a round number regardless of length of trains
Only just too short for 8x20m=160m, so should be possible for such a train to call, maybe with 1 passenger door disabled (or 1 car's doors depending on capability of SDO system in use). I Don't see any likelyhood of XC calling under normal circumstances. In my experience using the line regularly over a decade ago, a 2 or 3-car turbo was usually perfectly adequate for peak passenger numbers on the stoppers.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Winthorpe

Member
Joined
18 May 2019
Messages
344
Location
UK
Not long enough for an 8car EMU (if line is ever electrified), but far longer than a Voyager (if cross country were ever to call) and rather longer than a pair of 165 or 166 DMUs. Almost feels like a round number regardless of length of trains

Based on the mockup, pasted below, used in the media release they are expecting an Avanti Pendolino to call at the station :lol:


1657028594446.png
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,566
Location
Torbay
Based on the mockup, pasted below, used in the media release they are expecting an Avanti Pendolino to call at the station :lol:


View attachment 117193
Wow, and they're clearly proposing to convert them to bionic duckweed power as there's no sign of any kind of electrification. I expect they'll disable the tilt capability when they're transferred to GWR so there'll be no need for any TASS.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,632
Location
Hampshire
Only just too short for 8x20m=160m, so should be possible for such a train to call, maybe with 1 passenger door disabled (or 1 car's doors depending on capability of SDO system in use). I Don't see any likelyhood of XC calling under normal circumstances. In my experience using the line regularly over a decade ago, a 2 or 3-car turbo was usually perfectly adequate for peak passenger numbers on the stoppers.

A 2 car certainly isn't adequate or ideal anymore, that I can tell you! The only thing I'm looking forward to with the glacial introduction of the 769s is having 4 cars on the branch, as that will certainly help to spread the load out a bit.

Based on the mockup, pasted below, used in the media release they are expecting an Avanti Pendolino to call at the station :lol:


View attachment 117193

It's all First Group these days anyway :lol: Still, give it a good run up from Southcote and it might just make it beyond Green Park.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,755
Location
West of Andover
A 2 car certainly isn't adequate or ideal anymore, that I can tell you! The only thing I'm looking forward to with the glacial introduction of the 769s is having 4 cars on the branch, as that will certainly help to spread the load out a bit.

It still won't stop the rear coach being the busiest on departure from both Reading & Basingstoke, because some passengers are lazy ;)
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,566
Location
Torbay
It still won't stop the rear coach being the busiest on departure from both Reading & Basingstoke, because some passengers are lazy ;)
Or have just made it on board at the nearest door before departure after running from a mainline connection.
 

mangyiscute

Established Member
Joined
6 Mar 2021
Messages
1,524
Location
Reading
I don't ride on the line too frequently, perhaps once per month, but usually when I take it (often around evening peak times) a 3 car train is adequate, perhaps all 2 seaters are taken and some people have to sit next to someone but that is fine in my opinion. However, I would be worried for reading matches, and I also haven't tried it in the school rush
 

kevin_roche

Member
Joined
26 Feb 2019
Messages
997

Attachments

  • PXL_20220709_130246688.jpg
    PXL_20220709_130246688.jpg
    4.5 MB · Views: 176
  • PXL_20220709_130300747.jpg
    PXL_20220709_130300747.jpg
    4.5 MB · Views: 173
  • PXL_20220709_130332404.jpg
    PXL_20220709_130332404.jpg
    4 MB · Views: 170
  • PXL_20220709_130358240.jpg
    PXL_20220709_130358240.jpg
    4.3 MB · Views: 155
  • PXL_20220709_130404907.jpg
    PXL_20220709_130404907.jpg
    4.6 MB · Views: 161
  • PXL_20220709_130452587.jpg
    PXL_20220709_130452587.jpg
    4 MB · Views: 159
  • PXL_20220709_130426010.jpg
    PXL_20220709_130426010.jpg
    3.4 MB · Views: 164
Last edited:

markymark2000

On Moderation
Joined
11 May 2015
Messages
5,100
Location
Great Britain
Why is Green Park taking so long to build? Maghull North was built in 8 months, Reston built in 14 months (based off start build till open to the public). We are now quite far into the development here and it still looks like it could be a few months off. Is work just very slow here? What is slowing it down?
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,632
Location
Hampshire
Why is Green Park taking so long to build? Maghull North was built in 8 months, Reston built in 14 months (based off start build till open to the public). We are now quite far into the development here and it still looks like it could be a few months off. Is work just very slow here? What is slowing it down?
It certainly seems to be somewhat glacial, I noticed from those photos that the platform isn't even fully surfaced yet.
 

kevin_roche

Member
Joined
26 Feb 2019
Messages
997
It looks to me like most of the nearby buildings are unfinished and still being worked on. The road to the new station is still part of a building site and not yet open. The article linked in post #120 also implies that the money to finish the station has only just become available.
 

73128

Member
Joined
8 Dec 2019
Messages
471
Location
Reading
There are completed homes nearby and also a lot of offices. A lot more houses under construction too. The Madjeksi stadium will be around 10-15 minutes walk.
 

ewsclass

Member
Joined
27 Jun 2020
Messages
48
Location
Fleet
It's now the 'Select Car Leasing Stadium' haha. it's been very painful to watch this station every day indeed, incredibly slow progress
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,632
Location
Hampshire
It's now the 'Select Car Leasing Stadium' haha. it's been very painful to watch this station every day indeed, incredibly slow progress
Indeed! It's been a few seasons since London Irish left for well, London, so sadly I have little need to use it now!
 

73128

Member
Joined
8 Dec 2019
Messages
471
Location
Reading
Went down there again yesterday. The station is now signed, with a double arrow outside and there are two bus stops and the car park has been surfaced (and has three motor cycle spaces). No obvious cycle parking though is visible. The down platform is numbered one and the up as two. The steps to the footbridge are signed as an emergency exit from the up side (fair enough) but that on the down side is equally signposted as such towards the car park, which seems silly and dissuades access from the few houses over to the west of the line. I suspect it will end up open most of the time...

== Doublepost prevention - post automatically merged: ==

Reading Buses have just told me that they do not plan to serve the station....
 
Last edited:

fandroid

Established Member
Joined
9 Nov 2014
Messages
2,562
Location
Hampshire
Just passed by on the Basingstoke shuttle. There's new cable ducting under construction between the new station and Southcote junction
 

73128

Member
Joined
8 Dec 2019
Messages
471
Location
Reading
Another visit today. Appears largely complete and there are just a few snagging items to sort out and a slightly greater electrical issue. New signs all now up. Balfour Beatty staff seem to think that opening is planned for late this year, which ties up with December timetable change opening that I have read elsewhere.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,632
Location
Hampshire
Another visit today. Appears largely complete and there are just a few snagging items to sort out and a slightly greater electrical issue. New signs all now up. Balfour Beatty staff seem to think that opening is planned for late this year, which ties up with December timetable change opening that I have read elsewhere.
I did notice it has now appeared in the CIS Screens too. Unsure, but I believe they have now included it in the GWR Turbo PA system.
 

Attachments

  • 92CD4BED-D0DE-4F89-A1A0-259D0D626688.jpeg
    92CD4BED-D0DE-4F89-A1A0-259D0D626688.jpeg
    2.6 MB · Views: 147

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,269
Another visit today. Appears largely complete and there are just a few snagging items to sort out and a slightly greater electrical issue. New signs all now up. Balfour Beatty staff seem to think that opening is planned for late this year, which ties up with December timetable change opening that I have read elsewhere.
Are there still two rows of tactile pavers on each platform?
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,160
Went down there again yesterday. The station is now signed, with a double arrow outside and there are two bus stops and the car park has been surfaced (and has three motor cycle spaces). No obvious cycle parking though is visible. The down platform is numbered one and the up as two. The steps to the footbridge are signed as an emergency exit from the up side (fair enough) but that on the down side is equally signposted as such towards the car park, which seems silly and dissuades access from the few houses over to the west of the line. I suspect it will end up open most of the time...

== Doublepost prevention - post automatically merged: ==

Reading Buses have just told me that they do not plan to serve the station....
It might be for shuttle buses to the Mad Stad, which should be about 5 mins each driving down Longwater Avenue and Northern Way.
Reading Buses route Greenwave 50 is only about 5 mins walk away and will serve most of the area you'd want to get to from the station itself.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,755
Location
West of Andover
Just crawled past the station (on the SWR running early) and it looked like the ticket barriers have been installed in the main building.
 

73128

Member
Joined
8 Dec 2019
Messages
471
Location
Reading
Reading Council tell me that construction of the new station is due to complete by the end of this year, following which a safety process is to be observed prior to station opening. Once the Office of Rail and Road have authorised the station, early next year, a formal opening date will be announced.
 