daodao

Established Member
Joined
6 Feb 2016
Messages
3,601
Location
Dunham/Bowdon
The only potential freight traffic is the Skipton Quarry stone being sent to WCML destinations, but that would be entirely dependent on the market for such a flow
That wouldn't be time critical, so could be sent to Settle Junction and either continue to Carnforth via the Bentham line or reverse and travel via the Hellifield-Blackburn line.

SELRAP needs to be put to sleep, like the Dodos.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,581
Location
Northampton
That wouldn't be time critical, so could be sent to Settle Junction and either continue to Carnforth via the Bentham line or reverse and travel via the Hellifield-Blackburn line.

SELRAP needs to be put to sleep, like the Dodos.
100% agree with this post.
 

ChiefPlanner

Established Member
Joined
6 Sep 2011
Messages
8,331
Location
Herts
Fortunately, SELRAP aren’t responsible for setting the service specification or writing the timetables in that area.

Let alone the considerable issues in performance and capacity management. How many passenger services through Leeds in a regular peak hour.....? ......
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
SELRAP needs to be put to sleep, like the Dodos.

They're not the only ones - by the standards of some of these "campaign groups" SELRAP are positively sane...... try looking at some of ERTA's nonsenses, starting with the Welland Valley Rail link suggesting direct services between Kettering and Wisbech - I kid you not.
 

47434

Member
Joined
27 Jan 2018
Messages
185
That wouldn't be time critical, so could be sent to Settle Junction and either continue to Carnforth via the Bentham line or reverse and travel via the Hellifield-Blackburn line.

SELRAP needs to be put to sleep, like the Dodos.

As someone who would benefit from a Skipton - Colne link, even through rose tinted spectacles, I can see it is a non-starter.

Burnley folk travelling to Manchester or Leeds have a much quicker service from Manchester Road. I don't see huge demand from Nelson/Brierfield.

The freight argument falls over as soon as the 'reverse at Hellifield' is put into play - an eminently more sensible solution than trundling down a single line to Gannow Jct.

That is of course assuming that freight can obtain a path on the Aire Valley - which would be a struggle with at least 6 passenger trains in each direction between Armley Jct and Apperley Jct. And that is before the fun and games start at Shipley!

I think SELRAP present themselves well. Andy Shackleton is a fantastic orator but sadly, this line is highly unlikely ever to see a train again.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,057
Location
Reston City Centre
Burnley folk travelling to Manchester or Leeds have a much quicker service from Manchester Road

It's noticeable how the case for SELRAP tends to gloss over the fact that Blackburn/ Accrington/ Burnley have a long established hourly service to Bradford and Leeds - if there was really so much demand for improvements then it could either be extended to four carriages or the (Hull) Leeds - Halifax service extended through to Lancashire without needing any additional paths at the Leeds end

(of course, when you suggest some minor improvements, you invite a comment along the lines of "don't be silly, there are no spare DMUs to permit that" - just like "you can't easily reverse at Hellifield without changing the signalling/ points - from the kind of people who are demanding we spend hundreds of billions of pounds on a new line yet like to dismiss any practical changes on the grounds that they cost a few quid)

The SELRAP website talks of the "two hundred and fifty thousand" people in East Lancashire who could be connected to Civilisation if only we built this line, ignoring the fact that the majority of those people would be better using the Calder Valley route to get to Bradford/ Leeds than going north to Skipton - but they roll up all of these numbers together to try to make it sound like there are hundreds of thousands of people without a link to the jobs/wealth of Leeds (when, in reality, you'd only be talking the populations of Nelson and Colne)

I think SELRAP present themselves well. Andy Shackleton is a fantastic orator but sadly, this line is highly unlikely ever to see a train again.

Agreed

Whilst I'm against the proposal, I'll happily admit that the SELRAP campaign punches well above it's weight - considering what a "thin" case they have (unlike many re-opening proposals, there are no large places currently without a station, Nelson would probably be over an hour from Leeds so it's not an easy commute, there are various complications like the merging of an electrified "Metro" in Yorkshire with single track unelectrified line in Lancashire)

But they've managed to spin a good story out of it, suggesting that this is somehow a vital trans-pennine link (as if anyone would go from Leeds to Manchester/ Liverpool via Skipton) and that there's loads of freight that we could remove from other lines (rather than just some American trees that we currently burn because we'd convinced ourselves that this is "green" - Drax biomass will be a fairly finite flow that I expect will have ceased long before any line is built)

Despite the proposals writing a lot of cheques that a re-opening would struggle to cash (two trains per hour from Skipton to Manchester Airport, really?), it's obviously convinced a lot of people who are presumably unfamiliar with the area, it's got a load of "supporters", it's reached well above it's "station" - the people behind the campaign have done very well considering - it's a shame that they can't be used to get their skills/weight behind a more worthwhile proposal
 

Flying Claret

Member
Joined
14 Aug 2014
Messages
232
It's noticeable how the case for SELRAP tends to gloss over the fact that Blackburn/ Accrington/ Burnley have a long established hourly service to Bradford and Leeds - if there was really so much demand for improvements then it could either be extended to four carriages or the (Hull) Leeds - Halifax service extended through to Lancashire without needing any additional paths at the Leeds end

(of course, when you suggest some minor improvements, you invite a comment along the lines of "don't be silly, there are no spare DMUs to permit that" - just like "you can't easily reverse at Hellifield without changing the signalling/ points - from the kind of people who are demanding we spend hundreds of billions of pounds on a new line yet like to dismiss any practical changes on the grounds that they cost a few quid)

The SELRAP website talks of the "two hundred and fifty thousand" people in East Lancashire who could be connected to Civilisation if only we built this line, ignoring the fact that the majority of those people would be better using the Calder Valley route to get to Bradford/ Leeds than going north to Skipton - but they roll up all of these numbers together to try to make it sound like there are hundreds of thousands of people without a link to the jobs/wealth of Leeds (when, in reality, you'd only be talking the populations of Nelson and Colne)



Agreed

Whilst I'm against the proposal, I'll happily admit that the SELRAP campaign punches well above it's weight - considering what a "thin" case they have (unlike many re-opening proposals, there are no large places currently without a station, Nelson would probably be over an hour from Leeds so it's not an easy commute, there are various complications like the merging of an electrified "Metro" in Yorkshire with single track unelectrified line in Lancashire)

But they've managed to spin a good story out of it, suggesting that this is somehow a vital trans-pennine link (as if anyone would go from Leeds to Manchester/ Liverpool via Skipton) and that there's loads of freight that we could remove from other lines (rather than just some American trees that we currently burn because we'd convinced ourselves that this is "green" - Drax biomass will be a fairly finite flow that I expect will have ceased long before any line is built)

Despite the proposals writing a lot of cheques that a re-opening would struggle to cash (two trains per hour from Skipton to Manchester Airport, really?), it's obviously convinced a lot of people who are presumably unfamiliar with the area, it's got a load of "supporters", it's reached well above it's "station" - the people behind the campaign have done very well considering - it's a shame that they can't be used to get their skills/weight behind a more worthwhile proposal
Agree with everything above. Living further down the line in Accrington, there is no talk or real interest in the line to Skipton (apart from those old enough to remember when it was open)the main focus was on the link to Manchester, which opened about 4 years ago. SELRAP would be better placed putting their efforts into connections to Manc. I do like the idea of extending the Hull- HFX to Preston, as I think there is some untapped demand on the Calder valley-copy pit line.
 

harri2626

Member
Joined
22 Aug 2012
Messages
43
It's noticeable how the case for SELRAP tends to gloss over the fact that Blackburn/ Accrington/ Burnley have a long established hourly service to Bradford and Leeds - if there was really so much demand for improvements then it could either be extended to four carriages or the (Hull) Leeds - Halifax service extended through to Lancashire without needing any additional paths at the Leeds end

(of course, when you suggest some minor improvements, you invite a comment along the lines of "don't be silly, there are no spare DMUs to permit that" - just like "you can't easily reverse at Hellifield without changing the signalling/ points - from the kind of people who are demanding we spend hundreds of billions of pounds on a new line yet like to dismiss any practical changes on the grounds that they cost a few quid)

The SELRAP website talks of the "two hundred and fifty thousand" people in East Lancashire who could be connected to Civilisation if only we built this line, ignoring the fact that the majority of those people would be better using the Calder Valley route to get to Bradford/ Leeds than going north to Skipton - but they roll up all of these numbers together to try to make it sound like there are hundreds of thousands of people without a link to the jobs/wealth of Leeds (when, in reality, you'd only be talking the populations of Nelson and Colne)

Agreed

Whilst I'm against the proposal, I'll happily admit that the SELRAP campaign punches well above it's weight - considering what a "thin" case they have (unlike many re-opening proposals, there are no large places currently without a station, Nelson would probably be over an hour from Leeds so it's not an easy commute, there are various complications like the merging of an electrified "Metro" in Yorkshire with single track unelectrified line in Lancashire)

But they've managed to spin a good story out of it, suggesting that this is somehow a vital trans-pennine link (as if anyone would go from Leeds to Manchester/ Liverpool via Skipton) and that there's loads of freight that we could remove from other lines (rather than just some American trees that we currently burn because we'd convinced ourselves that this is "green" - Drax biomass will be a fairly finite flow that I expect will have ceased long before any line is built)

Despite the proposals writing a lot of cheques that a re-opening would struggle to cash (two trains per hour from Skipton to Manchester Airport, really?), it's obviously convinced a lot of people who are presumably unfamiliar with the area, it's got a load of "supporters", it's reached well above it's "station" - the people behind the campaign have done very well considering - it's a shame that they can't be used to get their skills/weight behind a more worthwhile proposal
Thank you, TBTC, for you kind comments regarding SELRAP'S "punching well above it's weight" with our campaign to reopen the Skipton-Colne railway, but then you claim we have a "thin case". If that were so, why do we have continuing, in-depth, contact with DfT, NR, TfN and all local MPs on the route (and beyond).

It must be remembered that our case isn't just about reopening a local link, it is about regenerating a very deprived area, thanks to years of neglect and non-investment. Those 12 miles of missing track will link communities with the three lowest house prices in the entire country (Pendle, Hyndburn and Burnley) with North and West Yorkshire with all the job, educational and tourism benefits that brings. Keighley and Bradford are major sources of education which will benefit the ever-growing younger population of East Lancashire. Skipton Building Society (a large employer) is very keen to have access to young trainable employees as they struggle to compete with the employment magnet of Leeds. The Pendle region has one of the lowest car ownerships in the country. If young people are to find education and jobs, then they will have no option but to drive - which must be avoided if we are to fulfil our decarbonising commitment and encourage travel by rail.

But don't take our word for it - here is what the LEP (Lancashire Strategic Economic Plan) has to say about East Lancashire and its connectivity:

"Road and rail links eastward into the Leeds city region are largely ineffective..."
"Whilst road links to the west and south are of reasonable standard, rail links are much less adequate or non-existent."
"Such factors all serve to heighten the sense of isolation and the perception of East Lancashire as an area of localised labour markets, narrow travel horizons and limited interaction with the adjacent economies of Manchester, Leeds and Central Lancashire."

The terminus at Colne is one of the worst performing stations in region. To re-link it with one of the best performing in the region (Skipton), has to make sense, feeding new blood into a withered arm.

Frankly, it disappoints and bewilders us why so-called rail enthusiasts should be so negative about a comparatively simple reopening which would have major benefits for employment, housing, education and tourism.

Take a look at our promotional video.
 
Last edited:

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
Frankly, it disappoints and bewilders us why so-called rail enthusiasts should be so negative about a comparatively simple reopening which would have major benefits for employment, housing, education and tourism.

Perhaps it's because it's likely to cost upward of half a billion quid for an allegedly "simple reopening" on a line which has struggled to wash its face at the best of times. There's a regular bus service which has competitive journey times and can serve the villages which the train can't.

And if there's so much demand for rail travel from Mid / East Lancs to Skipton / Leeds, why isn't there a push to run from Clitheroe to Skipton which can be done on existing lines albeit needing a reversal at Settle ?
 

bluenoxid

Established Member
Joined
9 Feb 2008
Messages
2,661
Frankly, it disappoints and bewilders us why so-called rail enthusiasts should be so negative about a comparatively simple reopening which would have major benefits for employment, housing, education and tourism.

It’s this view of it being comparatively simple that is just setting this whole scheme towards failure.

Comparatively simple would be a half hourly service on the branch and/or Burnley-Bradford/Leeds via the already open line through Halifax.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,581
Location
Northampton
The terminus at Colne is one of the worst performing stations in region. To re-link it with one of the best performing in the region (Skipton), has to make sense, feeding new blood into a withered arm.
Worst performing in what way? And why will it be a shot in the arm instead of a weight around the ankle?
Frankly, it disappoints and bewilders us why so-called rail enthusiasts should be so negative about a comparatively simple reopening which would have major benefits for employment, housing, education and tourism.
Blind optimism doesn't get money out of the treasury. This isn't a simple reopening - not least because the alignment is obstructed. There's many, many issues between Blackburn and Preston/Manchester and between Skipton and Leeds that make this very difficult. Not all on here are enthusiasts - some are just idly interested, others have professional insight.
Take a look at our promotional video.
Your own video highlights just how much of a dog-leg this route will be. It's also completely void of any firm economic figures, about how much it can actually bring to the region. You can't justify spending millions on a rail link unless you know that there will actually be millions of pounds worth of benefit. Your own post highlights that it struggles to get economic engagement with the areas it's currently connected to by rail, why will Leeds be any different?
 

harri2626

Member
Joined
22 Aug 2012
Messages
43
Perhaps it's because it's likely to cost upward of half a billion quid for an allegedly "simple reopening" on a line which has struggled to wash its face at the best of times. There's a regular bus service which has competitive journey times and can serve the villages which the train can't.

And if there's so much demand for rail travel from Mid / East Lancs to Skipton / Leeds, why isn't there a push to run from Clitheroe to Skipton which can be done on existing lines albeit needing a reversal at Settle ?
The Skipton-Colne line closed in 1970. At that time, many lines "struggled to wash their faces". Times have changed. No-one in 1970 would have dreamt that the Airedale line and Settle-Carlisle would be so successful. To reconnect the East Lancashire line to Airedale would benefit communities at both ends of the route. The regular bus service to Skipton, whilst useful, can never compete with rail which would through services to Keighley, Bradford and Leeds. Please remember that our line is not just Skipton to Colne, but it will be part of a major East Lancashire, North Yorkshire and West Yorkshire link. If citizens of Clitheroe want to travel to Skipton, they need to campaign for it, and we wish them well.
Worst performing in what way? And why will it be a shot in the arm instead of a weight around the ankle?

Blind optimism doesn't get money out of the treasury. This isn't a simple reopening - not least because the alignment is obstructed. There's many, many issues between Blackburn and Preston/Manchester and between Skipton and Leeds that make this very difficult. Not all on here are enthusiasts - some are just idly interested, others have professional insight.

Your own video highlights just how much of a dog-leg this route will be. It's also completely void of any firm economic figures, about how much it can actually bring to the region. You can't justify spending millions on a rail link unless you know that there will actually be millions of pounds worth of benefit. Your own post highlights that it struggles to get economic engagement with the areas it's currently connected to by rail, why will Leeds be any different?
Colne is a poor performer because it carries so few passengers due to its poor frequency, service speed and connectivity westward.

Of course, blind optimism doesn't get money out of the Treasury. That's why we're building our case for regeneration and the transformative benefits the line will bring. If our case was so poor, as you seem to believe, we would have been thrown out of the door years ago. Why are we still in regular meetings with the likes of DfT (this week, in fact)? We have "walked" countless local and national government officials, transport professionals and consultants over the line to show that the vast percentage of the alignment is not "obstructed". Yes, of course, there will be difficulties, but we have been reassured that none are insurmountable.
 

HST43257

Established Member
Joined
10 Apr 2020
Messages
1,650
Location
York
The terminus at Colne is one of the worst performing stations in region. To re-link it with one of the best performing in the region (Skipton), has to make sense, feeding new blood into a withered arm.
I might as well attempt to correct this:

The terminus at Colne is one of the worst performing stations in region. To re-link it with one of the best performing in the region (Skipton), has to make sense, if you want to hurt the reliability in Airedale.



Colne doesn’t need a through route to Skipton. Colne needs a better service on the existing route, and even potentially a Manchester service somehow.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,057
Location
Reston City Centre
Thank you, TBTC, for you kind comments regarding SELRAP'S "punching well above it's weight" with our campaign to reopen the Skipton-Colne railway, but then you claim we have a "thin case". If that were so, why do we have continuing, in-depth, contact with DfT, NR, TfN and all local MPs on the route (and beyond)

I mean it - given how thin the business case is, the fact that you're getting it talked about so much shows how well you are at promotion

However we've had threads on the SELRAP proposals for as long as I can remember suggests that these ongoing discussions haven't resulted in many shovels in the ground - despite all of the attention that politicians want to give to "Beeching" re-openings - every time it gets discussed we seem to have someone suggesting it's almost ready, just another few weeks, nearly...

It must be remembered that our case isn't just about reopening a local link, it is about regenerating a very deprived area, thanks to years of neglect and non-investment. Those 12 miles of missing track will link communities with the three lowest house prices in the entire country (Pendle, Hyndburn and Burnley) with North and West Yorkshire with all the job, educational and tourism benefits that brings. Keighley and Bradford are major sources of education which will benefit the ever-growing younger population of East Lancashire

So you could link Pendle (i.e Colne), Hyndburn (i.e. Accrington) and Burnley (self explanatory!) to West Yorkshire?

You're doing that disingenuous thing of pretending that a train via Skipton would be the only way of linking East Lancashire with West Yorkshire, hoping that people don't realise that there's been an hourly service from Blackburn/ Accrington/ Burnley to Halifax/ Bradford/ Leeds for decades - we don't need to spend half a billion pounds to link Burnley (etc) with Bradford and Leeds, there's a train every hour - it's good, I've used it, try it!

We could even turn it into a half hourly service by extending the current (Hull) Leeds - Halifax service through to East Lancashire, for the sake of an extra Sprinter or two - no need to break the bank

But the whole case for SELRAP requires people to believe that it's the only way to link the quarter of a million people in East Lancashire to the jobs etc of West Yorkshire, assuming that people aren't aware that such trains already exist (and that we'd be spending all of this money on linking just the Colne area with West Yorkshire rather than the whole of East Lancashire with West Yorkshire)

Why bring up Hyndburn and Burnley in terms of places that could get a link to West Yorkshire, when they already have one and a service via Skipton is going to be a lot slower (as well any train running via Skipton obviously only being able to serve Bradford *or* Leeds, rather than both, which the current services via Halifax do)?

Have the house prices in Burnley/ Hyndburn increased since the hourly service via Todmorden to Manchester btw?

The Pendle region has one of the lowest car ownerships in the country. If young people are to find education and jobs, then they will have no option but to drive - which must be avoided if we are to fulfil our decarbonising commitment and encourage travel by rail

There's a contradiction here, because the suggestion is that "improved trains will get people out of their cars, thus helping the environment" but also "the people in East Lancashire don't own many cars" (so there's not going to be much "decarbonising" if they aren't doing much driving at the moment)

The terminus at Colne is one of the worst performing stations in region. To re-link it with one of the best performing in the region (Skipton), has to make sense, feeding new blood into a withered arm

If you're saying that very few people use a station at Colne (and I agree, very few do) then I don't think that they are going to use services towards Burnley just because the train started in West Yorkshire rather than commencing at Colne

Frankly, it disappoints and bewilders us why so-called rail enthusiasts should be so negative about a comparatively simple reopening which would have major benefits for employment, housing, education and tourism

There's an assumption that some people have that we should all be Happy Clappers and get behind every proposal that someone suggests

People sometimes get upset that enthusiasts aren't automatically "enthusiastic" about everything

But if you can't convince people who are predisposed to liking railways that your idea is worth spending so much money on then you're going to struggle to get Government to spend the money you want

if there's so much demand for rail travel from Mid / East Lancs to Skipton / Leeds, why isn't there a push to run from Clitheroe to Skipton which can be done on existing lines albeit needing a reversal at Settle ?

This is the question that nobody seems to want to answer!

If Skipton to East Lancashire is such a big market then we could run services fairly easily with just a big of signalling at Hellifield and a spare DMU, but where's the fun in that compared to getting the crayons out, eh?

The Skipton-Colne line closed in 1970. At that time, many lines "struggled to wash their faces". Times have changed. No-one in 1970 would have dreamt that the Airedale line and Settle-Carlisle would be so successful

Is Settle & Carlisle really "so successful"?

It's a long double track bit of line that only has a Sprinter every couple of hours, nothing north of Carlisle and nothing south of Leeds (other than one train on Sunday mornings, pre-Covid) - is that really a huge success?

(I've suggested before that, if BR had managed to close the S&C when they wanted to in the 1980s, people would be suggesting today that it'd sustain a frequent pattern of long distance services, rather than the fairly modest frequency it currently has!)

Colne is a poor performer because it carries so few passengers due to its poor frequency, service speed and connectivity westward

An extension to Skipton wouldn't help the frequency/ service speed/ connectivity eastwards, and those are things that would be a lot easier to solve - but you don't seem so interested in solving those kind of simpler/ cheaper problems - we'd spend half a billion pounds on a swanky route from Skipton to Colne and then be dealing with the poor infrastructure that you're referring to...

...unless the hope is that, by asking for "just" twelve miles, the Government will decide to also pay for double track/ electrification/ faster alignments from Colne to Burnley/ Preston/ Manchester etc?

(similarly, the proposals seem a bit coy on whether the Skipton - Colne would be the extension of an already busy Leeds - Skipton service or a brand new path out of Leeds?)

the employment magnet of Leeds

We could give Colne direct trains to Manchester without needing to spend half a billion pounds - but there's no campaign for something simple like "extend the current Manchester - Bolton services that terminate at Blackburn through to Colne"

The only mention of Manchester in these kind of proposals is the idea of a half hourly through train from Manchester Airport to Colne (rather than, y'know, a simpler extension of an existing Manchester train that terminates in Blackburn that could be extended to Colne)
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,581
Location
Northampton
Colne is a poor performer because it carries so few passengers due to its poor frequency, service speed and connectivity westward.
Do you have some numbers that justify this position that people want to travel west east? AADT on the roads, or a bus service, or passenger survey? I don't know the area at all so there may well be demand, but so far nobody has put a number on it. I notice that you completely ignored my question about why Skipton will benefit Colne rather than Colne dragging Skipton.
Of course, blind optimism doesn't get money out of the Treasury. That's why we're building our case for regeneration and the transformative benefits the line will bring. If our case was so poor, as you seem to believe, we would have been thrown out of the door years ago. Why are we still in regular meetings with the likes of DfT (this week, in fact)? We have "walked" countless local and national government officials, transport professionals and consultants over the line to show that the vast percentage of the alignment is not "obstructed". Yes, of course, there will be difficulties, but we have been reassured that none are insurmountable.
It costs the DfT very little money to attend a walkover or photo op, and it's politically very good to spend a couple of hours a month with you for tea and biscuits. All levels of government will be very keen to have their photo taken with you, and to provide a 2-line comment about how great you are - as your video evidences. This is not the same as active support. No difficulty is insurmountable, the question is 'does it make sense to spend the money required to surmount it?'.
 
Last edited:

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
A quick query on Google Maps reveals that there is a half hourly bus service from Colne to Keighley in addition to the hourly Skipton service. Both of these bus routes offer quicker and more frequent rail connections to Leeds and Bradford than the roundabout rail route via Burnley.

Presumably a count of the numbers of through passengers on these buses might inform an estimate of the likely demand (or lack of) for a reopened rail link to Skipton?
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,828
Skipton Building Society (a large employer) is very keen to have access to young trainable employees as they struggle to compete with the employment magnet of Leeds.

So keen that they don’t do what many other employers do, and put on a free bus to Colne for those young, trainable employees? They could have that next week if it was that much of a problem, rather than waiting another 10 years.

Frankly, it disappoints and bewilders us why so-called rail enthusiasts should be so negative about a comparatively simple reopening which would have major benefits for employment, housing, education and tourism.

It’s not simple. Genuine question - how much further along the development process is the project than it was ten years ago, when (in one of my first posts here) I laid my bet that it wouldn’t open before 2030?

For example, What is the train service specification, and what does that mean for the network away from Colne to Skipton, eg the single line from Burnley to Colne? Or the approaches to Leeds? Or the dozen level crossings from Skipton to Leeds?

For the project itself, how is the line crossing the A6068? Or the A629? Or Salterforth Rd and the A56 in Earby? What did the people who live in the houses that back on to the former line in Foulridge, Sough, Earby and Elslack Bridge etc say about the proposals when you met them? What about the business owners like The Wharf at Foulridge? Or CG Machinery? Or the farmers? Were they in your video? (I’ll admit I haven’t watched it).

Etc.

Why are we still in regular meetings with the likes of DfT (this week, in fact)?

How much did they advise has been secured for this project in the Spending Review?
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
Do you have some numbers that justify this position that people want to travel west? AADT on the roads, or a bus service, or passenger survey?

To be fair, there is a valid point about connectivity *westward* i.e. towards Burnley.

The bus between Burnley & Colne is barely slower than the train and the connections at Rose Grove to trains for Manchester for example are poor. To give an example, NR quote the journey time from Colne to Manchester Victoria as 2h 13m, from Clitheroe it's only 1h 18m and Burnley it's 46 mins.

So Colne's poor journey time is due to poor connections - and that probably ought to be looked at. But that *doesn't* justify reopening the railway eastwards. Giving Colne a better journey time to Manchester would probably be a much better outcome in any case.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,438
Location
A typical commuter-belt part of north-west England
Looking at another once-used connection from the East Lancashire line to Manchester, there was once the line from Accrington, via Baxenden and Helmshore, to Bury Bolton Street, that has seen the Todmorden curve line from Burnley Manchester Road now seeing services to Manchester.
 

Neptune

Established Member
Joined
29 May 2018
Messages
2,626
Location
Yorkshire
Colne - Skipton always smacks of ‘there was a railway in the past so it must be put back’. Sure if it was cheap and easy which despite everything it simply isn’t.

When you have tunnel vision about something there is always a solution but the reality is always somewhat different (see Bradford Crossrail).

Now for better connectivity for Colne, Nelson etc…. there is a rather large metropolis which the route faces. Would it not be cheaper to run a service to Man Vic via Bolton (I’m not 100% knowledgeable on the route between Blackburn and Bolton but assume some works would be needed to run it alongside the Clitheroe service) and run a Preston - Blackburn shuttle using Blackburn’s west facing bay to cover that portion of route.

You can connect onto the Blackpool - York service for Bradford and Leeds and oft mentioned is extending the Hull - Halifax service up Copy Pit to create a half hourly service which is even better if possible although additional units would be required (there are plenty of 158’s coming off lease in the near future). Both services could stop at Rose Grove to give an easy step free connection on the island platform.

Looking at buses east from Colne it would definitely be quicker from Colne - Keighley direct by bus than a train via Skipton. Colne to Skipton can’t have much of a market if it’s 1 bus per hour. Using the Skipton building society as an example is a bit 1 dimensional. As mentioned, if there was such demand then SBS would put on a free shuttle as others do such as First Direct in Leeds.

I think what we’re all saying is that there are solutions out there that are better, quicker and much cheaper than trying to put something back that disappeared over 50 years ago.
 

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,891
Of course, blind optimism doesn't get money out of the Treasury. That's why we're building our case for regeneration and the transformative benefits the line will bring. If our case was so poor, as you seem to believe, we would have been thrown out of the door years ago. Why are we still in regular meetings with the likes of DfT (this week, in fact)? We have "walked" countless local and national government officials, transport professionals and consultants over the line to show that the vast percentage of the alignment is not "obstructed".
Don't you think that there's a chance you are being strung along? Politicians love to make positive noises about reopening railways - it plays well with key voter demographics. They may even throw some money your way to undertake further development to give the impression they are doing something. But it's odd on that they will disappoint you in the end. They will spin it something like this: "We need to make a difference to real journeys people are making now, not 10 years in the future, and unfortunately this scheme will take too long and will be too disruptive, particularly given the number of bridges required over the major roads which the region relies on. A more flexible form of transport will better serve local communities" etc etc.

Yes, of course, there will be difficulties, but we have been reassured that none are insurmountable.
Not technically insurmountable, or not commercially insurmountable? You can do anything if you have the money, but the Treasury will only give it to you if you have a business case.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,828
Glad to see that someone has highlighted that particular point.

Well there has just been a spending review that has allocated all budgets for the next 3 years; in the rail ‘enhancement’ world this has allocated budgets at project level. Whilst details of budgets have yet to be announced... if any had been allocated to his project, you would have expected it to have been advised to the proposers in the meeting last week.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,057
Location
Reston City Centre
To be fair, there is a valid point about connectivity *westward* i.e. towards Burnley.

The bus between Burnley & Colne is barely slower than the train and the connections at Rose Grove to trains for Manchester for example are poor. To give an example, NR quote the journey time from Colne to Manchester Victoria as 2h 13m, from Clitheroe it's only 1h 18m and Burnley it's 46 mins.

So Colne's poor journey time is due to poor connections - and that probably ought to be looked at. But that *doesn't* justify reopening the railway eastwards. Giving Colne a better journey time to Manchester would probably be a much better outcome in any case.

This is the thing that frustrates me about debates like this one

A direct Leeds service doesn't offer Colne anything that a direct Manchester service couldn't provide (in terms of access to jobs, regeneration etc - Manchester has had/ is having billions spent on it - it's a huge market) - it'd be significantly easier to provide Colne with Manchester links - maybe a short double track section on the Colne branch to permit a second train, maybe an additional Sprinter or two - but such suggestions tend to get met with a response along the lines of "but there are no spare DMUs to run it" from people who think that there are hundreds of millions of pounds sitting around waiting to be allocated to *their* project

For example, assuming we go back to pre-Covid timetables, you could extend the Hull - Halifax service through to Preston (picking up the stops that the Colne service has between Blackburn and Preston) and extend the current (Rochdale) Manchester - Bolton - Blackburn terminator through to Burnley and Colne. The Colne - Preston DMU would be replaced by a doubling of the service from Leeds/ Bradford to Burnley/Blackburn and by providing direct trains from Colne to Manchester.

Since Halifax to Burnley is around half an hour, you'd need one additional Sprinter to provide that service - possibly a second additional Sprinter to accommodate the fact that some of the turnaround times may push services into needing an extra unit added to the diagrams to ensure reliability - but nothing too drastic. Fairly modest - no need for hundreds of millions of pounds, it links Colne to a thriving big city, it doubles the service from East Lancashire to West Yorkshire... but people aren't interested in achievable improvements, they are interested in re-opening abandoned routes rather than actually solving problems

Colne - Skipton always smacks of ‘there was a railway in the past so it must be put back’. Sure if it was cheap and easy which despite everything it simply isn’t.

When you have tunnel vision about something there is always a solution but the reality is always somewhat different (see Bradford Crossrail)

Agreed!

Now for better connectivity for Colne, Nelson etc…. there is a rather large metropolis which the route faces. Would it not be cheaper to run a service to Man Vic via Bolton (I’m not 100% knowledgeable on the route between Blackburn and Bolton but assume some works would be needed to run it alongside the Clitheroe service) and run a Preston - Blackburn shuttle using Blackburn’s west facing bay to cover that portion of route

The pre-Covid timetable was a half hourly Rochdale - Victoria - Bolton - Blackburn service, extending hourly to Clitheroe - i.e. the "other" service (which terminated at Blackburn) could have been extended through to Colne, replacing that bit of the current Preston - Blackburn - Colne service

I think what we’re all saying is that there are solutions out there that are better, quicker and much cheaper than trying to put something back that disappeared over 50 years ago.

This, this, a thousand times this!

Don't you think that there's a chance you are being strung along? Politicians love to make positive noises about reopening railways - it plays well with key voter demographics. They may even throw some money your way to undertake further development to give the impression they are doing something. But it's odd on that they will disappoint you in the end

Agreed - politicians want to be seen to be "listening", they want to sound encouraging, even if they know that there's no money for projects - but the fact that we've had no shovels in the ground in the decade or more that we've been debating this (a decade where other lines have re-opened) suggests that it's just a bit of PR - get your picture in the local paper standing next to some campaign group, make the right noises, promise to look into it

We know that there's a demographic of people who love the nostalgia of old railways, the Government have been very good at tapping into this (reheating announcements about "Beeching reversals" every few months, whilst the only progress made seems to be the Okehampton line that previously had Sunday services running on it anyway, so was hardly comparable to an alignment abandoned for generations!)
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,828
but the fact that we've had no shovels in the ground in the decade or more that we've been debating this (a decade where other lines have re-opened)

It’s not just shovels in the ground that hasn’t happened in that time, there hasn’t been any serious pen to paper, or more accurately mouse on CAD. Nor any meaningful public consultation to assess what the public, including those on the route, actually think about it.

It will be interesting to see what answers we get to the questions upthread.
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
Don't you think that there's a chance you are being strung along? Politicians love to make positive noises about reopening railways - it plays well with key voter demographics. They may even throw some money your way to undertake further development to give the impression they are doing something. But it's odd on that they will disappoint you in the end. They will spin it something like this: "We need to make a difference to real journeys people are making now, not 10 years in the future, and unfortunately this scheme will take too long and will be too disruptive, particularly given the number of bridges required over the major roads which the region relies on. A more flexible form of transport will better serve local communities" etc etc.


Not technically insurmountable, or not commercially insurmountable? You can do anything if you have the money, but the Treasury will only give it to you if you have a business case.

Not sure it's a case of people being "strung along" - in a democracy public bodies do have to interact with and listen to the public. That's what's happening here.

The reality is a compelling case hasn't been offered up by SELRAP. Now, the public bodies are probably making polite noises and are far more diplomatic than some of us here are and rather than killing the conversation they instead allow it to continue - in part because they can't "kill" such conversations until something happens where a point of no return is reached - e.g. HS2 South - the complaints about the route being taken are not up for further discussion - until that process had completed those conversations could keep taking place.

As we know there are no shortage of "campaigns" to re-open lines up and down the country. Too often these are driven not by a genuine need with a basic understanding of what a Business Case needs to achieve, but instead by a romantic 'rose tinted glasses' view of the world and how romantic it would be to have 'line x' reopened and how well it would be used, despite evidence to the contrary. Invariably they will point to one of the recent re-openings - Borders Rail being a particular favourite - and claim the same applies to every other line, whilst disregarding the number of rural lines up and down the UK currently which barely fill a train every hour.
 

Neptune

Established Member
Joined
29 May 2018
Messages
2,626
Location
Yorkshire
The pre-Covid timetable was a half hourly Rochdale - Victoria - Bolton - Blackburn service, extending hourly to Clitheroe - i.e. the "other" service (which terminated at Blackburn) could have been extended through to Colne, replacing that bit of the current Preston - Blackburn - Colne service
Right so would SELRAP object to this alternative to linking to Skipton. After all, I’m sure there are as many if not more employment/education opportunities in Blackburn, Bolton, Salford and Manchester. Being able to connect to a service easily at Rose Grove to head to Halifax, Bradford and Leeds on top of that should a half hourly Copy Pit service ever surface then it starts to make rail links to Skipton/Keighley a bit, well, small fry.

Maybe if SELRAP changed their mindset, as their current campaign seems no nearer now than since the line closed, and campaigned for a direct service to Manchester alongside a half hourly Copy Pit service it might be a bit more favourably looked on by the politicians.

Why spend millions when you can spend far less for what I would say is a bigger overall benefit.
 

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,891
Not sure it's a case of people being "strung along" - in a democracy public bodies do have to interact with and listen to the public. That's what's happening here.

The reality is a compelling case hasn't been offered up by SELRAP. Now, the public bodies are probably making polite noises and are far more diplomatic than some of us here are and rather than killing the conversation they instead allow it to continue - in part because they can't "kill" such conversations until something happens where a point of no return is reached - e.g. HS2 South - the complaints about the route being taken are not up for further discussion - until that process had completed those conversations could keep taking place.
Certainly public bodies have a duty to listen and respond to the public. And in the context of railway reopenings, that's been going on for decades. Unfortunately there is a more cynical political presentation at play here. "Restoring your railway" is presented as "reversing Beeching" with all the nostalgia that entails. Bids for funding have been accepted for dozens of schemes which we all know will never see the light of day, but are being thrown a bone to give the impression of doing something when nothing is actually going to happen.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,828
Bids for funding have been accepted for dozens of schemes which we all know will never see the light of day, but are being thrown a bone to give the impression of doing something when nothing is actually going to happen.

To be fair, most of those that have been allocated initial funding have been because there is a chance there may be a case. However, I suspect that in most cases when the numbers are crunched, it will become apparent that there isn’t. This will be one of them.
 
Status