We've been talking about it for years - and I'm sure it'll mainly just be talk for another few years, but . . . .
there is some more progress in re-opening the 30+ miles of the old Waverley line between Edinburgh and Tweedbank (near Galashiels).

Today the Scottish government sets out the actions being taken to position Scotland’s economy for recovery. It is therefore fitting that work now starts on a project which will provide a fast, efficient rail link connecting communities from the Scottish Borders to Midlothian and Edinburgh. When finished, the railway will act as a catalyst for economic growth right across southern Scotland, supporting hundreds of jobs during its construction. It will also increase business development and housing opportunities, while helping promote inward investment.” Scottish Transport Minister Stewart Stevenson, 4th March 2010.
I understand that the bidding deadline for interested Infrastructure Contractors is this month, and, despite the strain on public expenditure, the Scottish Executive has still committed the funds to this construction.

It amuses me that there were massive objections from Borders residents when the line was condemmed to closure in the late 1960's and now, there's been an equally vociferous lobby of objecting residents to the re-building. (NIMBY's go for it either way!)

What does NOT amuse me is that the proposals are for only a single track line, with just a few station loops. Its hardly likely to fulfill its real potential - which could eventually include extensions south through other Borders towns to either the ECML or WCML for long distance freight or passenger use. That could have provided a working alternative to the long 120mile Newcastle-Edinburgh route, or the corresponding Carlisle-Carstairs-Edinburgh route.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
We've been talking about it for years - and I'm sure it'll mainly just be talk for another few years, but . . . .
there is some more progress in re-opening the 30+ miles of the old Waverley line between Edinburgh and Tweedbank (near Galashiels).
There'll be trouble if it'll "mainly just be talk for another few years" - the Act requires the line to be completed within five years from now, although this can be extended to ten.

What does NOT amuse me is that the proposals are for only a single track line, with just a few station loops.
But that is not what's proposed. The three loops will each be several miles in length, so long in fact that the route will have more mileage of double track than single.
 

route:oxford

Established Member
Joined
1 Nov 2008
Messages
4,949
Transport Scotland/The Scottish Government should hold off until the formal announcement is made concerning HS2 this week.

If the plan is for the route to go via Carlisle, then TS/SG should jump in and start to build a fully electrified, 225mph, dual tracked HS1 (first high speed line in Scotland) using much of the old Waverley route.

Admittedly, it will be ready long before stock that is fully capable of utilsing the rebuilt gauge can make it all the way between London & Edinburgh, but in the meantime Pendolinos would be capable of operating at 140mph between Carlisle & Edinburgh using block signalling and locals would enjoy High Speed local "borders" services.

Gala to Edinburgh in 20 mins anyone?
 

Ivo

Established Member
Joined
8 Jan 2010
Messages
7,307
Location
Bath (or Southend)
Transport Scotland/The Scottish Government should hold off until the formal announcement is made concerning HS2 this week.

If the plan is for the route to go via Carlisle, then TS/SG should jump in and start to build a fully electrified, 225mph, dual tracked HS1 (first high speed line in Scotland) using much of the old Waverley route.

Admittedly, it will be ready long before stock that is fully capable of utilsing the rebuilt gauge can make it all the way between London & Edinburgh, but in the meantime Pendolinos would be capable of operating at 140mph between Carlisle & Edinburgh using block signalling and locals would enjoy High Speed local "borders" services.

Gala to Edinburgh in 20 mins anyone?

Wha---???!!! 225mph?! Are you crazy? :D:D:D:D:D
 

DaveNewcastle

Established Member
Joined
21 Dec 2007
Messages
7,387
Location
Newcastle (unless I'm out)
If the plan is for the route to go via Carlisle, then TS/SG should jump in and start to build a fully electrified, 225mph, dual tracked HS1 (first high speed line in Scotland) using much of the old Waverley route . . . . Gala to Edinburgh in 20 mins anyone?
Hmmm. The proposals are for a line 35 miles long with end-to-end journey time of 55mins.

It COULD form an excellent route for the northern end of a new and more direct line into Edinburgh, but the provisions for future expansion are not impressive. And the prospects of then extending S.W. to Carlisle or South to Darlington are, frankly, invisible!
 